Forwards Fire Protection Associated Cable Rept, in Response to NRC 820208 & 0406 Requests for Info.Rept Based on Development of Alternate Safe Shutdown Cable Charts
ML20053E748
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/07/1982
From: Lentine F
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20053E749 List:
References
4277N, NUDOCS 8206100009
Download: ML20053E748 (2)


Text

_

/D) one Fir:t National Pitu Chicago Hhnois Commonwealth Edison

[

t O

(g') Addras Riply to: Post Offica Box 767 Chicago. Illinois 60e90 Jun e 7, 1982 Mr. Harold R.

Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Station Units 1 and 2 Fire Protection NRC Docket Nos. 50-295 and 50-304 References (a):

February 8, 1982 letter from S. A. Va rga to L. O. DelGeorge.

(b):

April 6, 1982 letter from S. A. Va rga to L. O. DelGeorge.

(c):

April 16, 1982 letter from F. G.

Lentine to H.

R. Denton.

Dear Mr. Denton:

By letter o f reference (a), the NRC provided its preli-minary Technical Evaluation Report (TER) and requested additional information on Zion Station's post fire shutdown capability.

In refereiice (b), Commonwealth Edison provided responses to the open items listed in the TER, with the exception of the subject of associated circuits.

Reference (c) transmitted a rewording of the request for information contained in the NRC's Generic Letter 81-12, along with a clarification of the definition of associated circuits, and requested Commonwealth Edison's response on that subject within 60 days.

This letter provides Commonwealth Edison's response to that request.

The enclosed report is based on the development of Alternate Safe Shutdown Cable Charts, which identify required l

instrumentation, power, and control power cables and associated circuits.

The repor t provides these charts for Zion Units 1 and 2 and a description of their preparation and analysis.

A detailed discussion is provided for Zion 2 which describes the features presently installed and/or modifications planned to ensure alternate safe shutdown capability for a single fire in any fire zone.

A similar analysis has been completed for Zion 1.

l r

h

$0$KOhoo@{g l

PDR

y

~

H. R. Denton June 7, 1982 Preparation of this submittal on associated circuits has required a very large effort.

The NRC's specification in reference (b) of a deadline for Zion's submittal in advance o f the July 1 date provided to the rest of the industry has limited the degree of review that could be applied to the report.

As a result, Common-wealth Edison is continuing to review the report to verify its accuracy, with the intent of correcting, modifying, or improving the report as appropriate.

In particular, it is anticipated that a detailed Unit 1 discussion would prove useful to the NRC staff.

Commonwealth Edison will provide this material by August 1, 1982.

Commonwealth Edison has endeavored to be responsive to the NRC staf f throughout the conduct of the fire protection review.

Descriptions of our proposed modifications to meet the requirements of Appendix R to 10 CFR 50.48 have been provided in submittals dated 4/30/80, 5/28/80, 9/30/80, 11/24/80, 3/18/80, 6/01/81, 6/02/81, 7/14/81, and 4/16/82.

In addition, several conference calls have been held with members of the NRC staff and their consultants.

Commonwealth Edison believes that in light of this record, the NRC's statement regarding civil penalties contained in reference (b) is inappropriate and unnecessary.

Three (3) copies of the report are provided for your use.

Please address questions regarding this matter to this office.

Very truly yours, Yk l

F.

G.

Lentine Nuclear Licensing Administrator 1m Enclosure 4277N