Forwards Fire Protection Improvement Plan Designed to Effect Complete Program Recovery,Per 910819 Working Meeting W/Nrc
ML20079H548
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/04/1991
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9110110185
Download: ML20079H548 (13)


Text

-

t,,%

a w,ns1

,i rr.,e.

. i 4,

..c, J[

Wi.,nn h

v..,#,-.. a o,,

m e r, October 4, 1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Centlement In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - FIRE FROTECTION IMPROVEMEN1 P1AN A working meeting between TVA and NRC was held on August 19, 1991, at Sequoyah to discuss the problems TVA had identified relstive to Sequoyah's fire protection program. As TVA committed during this meeting, Enclosure 1 provides the fire protection improvement plan desigaed to effect complete program recovery. contains the commitments speciried in the improvement plant these commitments supersede previously submitted individual commitments.. Quarterly status reports will also be submitted as committed in the working meeting.

If you have any questions concerning this submittal, please telephone M. A. Cooper at (615) 843-8422.

Sincerely, a pK.

J L. Wilson i

Enclosures cet See page 2 X

9110110185 911004

\\g1 s

PDR ADOCK 05000327 i

I F

PDR l

I k

i l

2 U.S. Nuclear-Regulatory Conunission October 4 1991 cc (Encionures):

Mr. D. E. LnBt.cgo. Project Manager U.S. Nuclear haulatory Conunission One White Flint. North 11555 Rockville Pike Rockville Maryland 208$2-NRG Resident inspector Sequoyah Nucicar Plant 2600 Igou Ferry Road Soddy-Daisy. Tennessee 37379 Mr. 11 A. Wilson, Project Chief U.S. Nuclear Regulatory Consnission Region 11 101 Marietta Street. !N. Suite 2900 Atlanta Georgia 30323 l

l.

l t

l 1

l '.

-._;. _,. _. -......., =. _

_.-2.

.,.... _, _.. ~ _.. - _... -. _. _ _ _. _ _ _.... _ _.... _.

-,-.~.

1%Cl.0 SURF: 1 SS1 910930 801 FIRE PROTECTION IMPROVEMENT PLAN SEQUOYAH NUCLEAR PLANT This plan contains the major work activities required to correct utility identificd weaknosses in the firo protection program at Sequoyah Nuclear Plant (5 011).

The plan is divided up into four phason with targoted completio.: datos.

Although exact duration of soma activitics can only be estimated at this timo due to undefined scope it is anticipated the activition can be finalized within the timo framo of their ar kned phase.

'It in the mission of thin improvement plan and the desires of TVA Management to ensure that all weaknesson in tho SON firo protection program be adequatoly identified and corrected.

The phase dates are intended to supersede any previously mado schedules in that all commitments and identified weaknesses will now be prioritized and impicmo' tod by the Firo protection Improvement Plan Task Forco.

Status reports on 7mprovement plan progress will be provided per Attachment A.

0 e

l-1) 9/30/91 Rev. 3 l

L 1

PHASE I-TARGETED COMPLETION DATE APRIL 1,1992 1-1

-Establish walkdown procedure for purpose of updating the rire liazard - Analysis (FRA) report.

The plan should includes a.

Incorporate permanent combustibio storage locations.

b.

Develop plan and update calculation for Tire llazard

Analysis, c.

Identify resources to perform routine field verification of SQN TliA.

1-2

-Develop action plan to resolve and close GL 88-04 on fire rated mechanical and electrical seal concerns.

1-3

-Review remaining open fire protection-related CAQRs and SCARS that - have taken credit for-compensatory actions to ensure there-is traceability to the source document and the compensatory measure is-in-place.

1 -Review Document Control Change Management (DCCM) to ensure programmatic deficiencies do not exist with the _ current process for Design Document amendments.

1-5

-Establich program where the Appendix R Coordinator attends the 10% and/or 50% and/or 80% design review meetings.

1-6

-Perform System 26 hydraulic performance evaluation and

_ provide the_._following itemst a.

Required pressures and flows for each flow control valve for sprinkler system serving safety-related areas.

b.

The minimum flow demand back to the pump over the most hydraulically remote route (s).

c.

Calculations for test results to show " alert" range or different levels of deterioration.

d.

Calculations to be verified by qualified individual in area of fire suppression hydraulics.

e.

Review the backpressure control valve response times and the elevated pressures the system is operated under, f.

. Develop and implement action plan to complete the corrective action identified in CAQR SQP900036 (overpressurization and subsequent leak in HPFP piping).

This corrective action to include a review of corrosion in HPFP-piping plant wide.

2) l

f 1-7

-Comploto the installation and testing of the now System 13 i

'ontral alarm system and ensure human f actors are incorporated 11to the system operation.

l 1-8

-Correct previously identified failures to adequatoly consider fire-protection (Appendicos A and R) in the design change process.

1-9

-Dovolop a list of functional responsibilities for all

- positions that are directly involved with Iiro protection-related activition.

11uclear Engincoring positions identiflod are Hochanical and Electrical Design personnel and Appendix R Coordinator.

1-10 -Dovolop'adoquate training to selected lie personnel to assist them in obtaining and maintaining a high lovel of proficiency in fire protection and Appendix R requirements.

1 1-11 -Updato calca SQlf-APPR-1 and SQlf-APPR-2 and ensure they aro updatod on a periodic basis.

1-12 -Dovolop a comprohansivo and recurrent training plan for firo

{

- operations-personnel related to the operational aspects of firo protection systems and features.

1-13 -Dovolop a site-specific fire protection training plan for Technical Support and 11uclear Engincoring ongincors that havn direct or indirecti responsibility for fire protection systems and features.

1-14 -Roview and upgrado as necessary firo protection-related training provided to all sito personnel.

Consider th's use of routine safety meetings and/or. block training.to accomplish tho training.

1-15 -Evaluato and reviso the permit process to insure firo protection impairmont tracking and problem resolution.

1-16 -Dovolop Site Sta.1dard Practico SSP-12.15 to replaco PHYSI-13, "Firo Protection Program," and to include the following:

a.

Incorporate AI-15, " Torch cutting, Welding, open Flamo, Grinding and Spark Producing Work Permit," and ' change responsibility for permit authorization

-to Firo operations croup.

l b.

- Identify specific requirements to be ovaluated prior _to removing any firo protection system or firo-rated barrior from servico..

3) l i

@ T-fMMrT---aw:59 9,

_g.

n.

y e+-ep-ay--

ng-e-

er

(-.iew t w

,g

,+-fpg p.,

y 9..

7vap.w g 3y g gs p-w.mA.wwmys,-%pegy.eg,r-

,,qw we ww.a.w.y he* s ywg4=g-,a-.yw wytm4*pw.M--M+--te'T'eg-wweepe.gy wpr -

~.. - -,. - -

'c.

Combino permits for removal of fire protection systems and broaching panotration fire barriors into a single permit process, if appropriato.

d.

Identify all areas where fire wrap has boon installed and aroas whern credit has boon taken for 20 foot separation with no intervening combustibles.

I 1-17 -Idontify and reviso as necessary all SQN proceduros that directly impact fire protection or those that are directly impacted by fire protections i

a.

01carly identify disciplinos responsible for proceduro maintenanco and implomontation, b.

Identify and track procedures for biennial review.

c.

Expedito review of preceduros overduo f or biennial review or f or near-term por f ormance.

-d.

Evaluato surveil'.anco instructions to datormine the appropriato organization that should be performing the

.aurveillance.

o.-

Review firo protection-related procedures for clarity and

-implomontation.of Technical Specification requirements.

Initiato revisions as required.

i r

f.

Evaluate fire protection-rolated procedur'en for performance of redundant tasks.

g.

Roviou all firo protection-related procedures to ensure all proceduro change requests have boon incorporated into tho-latest revisions.

h.

Procedures with noted deficiencias will be reviewed and revised as necessary prior:to next porformancol 1-18 -Rovino prn-fire plans to reflect current fire brigado organization, capabilities and tactics.

1-19 -Incorporate the Firo Protection Engineer (FPE) in the review process for Work Roquests and modifications.

1-2 0- -Rovine' SI-167,

" Fire - heador Valvo Lineup Inspection", to

.includo - only Toch Spec fire protection, valves and SI-654, "Firo Heador Valve Scalc-Inspection",-to identify all other valves.

1-21 -Roviso 0-S0-26-1 to promptly drain down each firo protection

- systein -af ter actuation.

4)

o b

1-22 -Comploto the mechanical cleaning of main HPFP piping.

1-23 -Evaluato present requirements for upgrading the present radio l

communications and repeater system for the Tiro Operations Unit.

r 1-24 -Upgrado and retrain Operations Fire Brigado members.

1-25_-Roviso appropriate fire protection procedures to add stepa that ensure that plant personnel are aware of the requirement to-have 2 of the 3 pressuro control valvos in service whilo operating the !!PFP fire pumps. (i.e.

0-SO-26-1, SI-122, SI-SFT-026-002.0, 50-180, etc.)

1-26 -Develop methodology for ovaluating and datormining appropriato compensatory measures for various fire protection impairments. _ consider the followings-a.

Appendix R List i

1):

Fire wrap areas 2) 20 foot separation with no intervening combustiblen 3)

Verification of Appondix E Table 10 information b.

Coordination of pormits 1)

Transic,nt Firo Loads 2)

Breaches 3)

Hot Work

)

4)

Other fire protection impairments l

1-27 -comploto the following correctivo actions in response to the following Incident Investigations or other corrective action

-programs:

II-S-91-029' Walkdown the fire suppression sprinkler system por SI-241.0,

.1 and -.2 to verify the survoillanco instruction, installed equipment and drawings are identical.

r II-S-91-041 Complete walkdowns of control and auxiliary building non-poured masonry walls to ensure a complete, _ functional fire barrior is in placo.

II-S-91-049 Review and reviso training. and proceduros to increase the control of Transient Fire Loads, s

II-S-91-055 Reviso procedures and training for personnel performing fire barrior inspections.

i l=

5)

__. _- _. ~ _,, _ _ _ _. _ _. _. _ _. _ _. - _ _. _ _ _ - _. _ _ _ -. _.

1-28 -Ensure SQN maintains the capability to perform correctivo and prevontivo maintenance on fire protection features including panotration coal repairs and fire door repairs in timely manner.

1-29 -Review SMI-J-317-18,

" Appendix R Casualty procedure", to ensuro required equipment is easily identified, properly stored for accessibility, and inventorlod on a regular _ basis.

1-30 -Following resulta of prosent study, initiato DCl4 to provido dodicated water nupply syntom and split the !!PFP and RSW loads under-pcli 607.

1-31 -Roview,-entogorizo, prioritize outstanding AllI Firo/All Risk

-innues.

Prepare 5Q11 position and an upgraded implomontation schedule-if necessary.

]

1-52 -Arrango long-term Fire Protection audits and evaluat

  • e.

to ensure the Sequoyah 11uclear Plant (SQll)

Firo Protoetion Program remains improving and offectivo.

1-

~

d I.

i PHASE II TARGETED COMPLETION DATE OCTOBER 1,1992 2-1

-Perform independent Fire Protection assessment to assess actions ta..on in Phase I

are properly implomonted and etfactivo.

2-2

-Implement - revised specification G-40 requirement to show cable routing leg using DCA sketches with required zones and tolerancos called out.

IF walkdown is required, coordinato with FHA walkdown.

2-3

-Ensure SQl1 fi' o protection design and site specific t

implementing instruction (for design)

'idequately reflect design criteria and General Engincoring Specifications issued from corporate Nuclear Engineering.

2 -Review SQll-Q-List versus respectivo engineering drawings to ensure

- all-fire protection components are correctly classified.

J 2-5

-Evaluata system modifications to enable performance of a main drain test and to assist in tho draining of the system following actuation.

2-6

-Incorporato Safety Function Position Statements (SFPSs) into a controlled QA record and en4ure they are updated on a periodic basis.

2-7

-Recheck and or revise calculation. SQlf-CSS-02 3 to ensure.

interactions are adequately and consistently dispositioned.

2-8

-Complete Appendix R analysis'of the turbine trip logic.

[

2-9'

-Review a valid. sample of DCNs and evaluate the nood to perform field walkdown for Appendix R considerations on all Design Change Notices (DCNs) and establish futuro policy.

2-10 -Perform plant walkdown procedure to update Fire Haznrd Analysis (FMA).

2-11 -Develop program and train modifications personnel in basic Appendix-R requirements.

2-12 -Revise 0-SI-SFT-026-002.0 to incorporate the following; a.

The-demands of all of the standpipo and sprinkler systems should be identified and documented.

L 7)=

l-

~

9 Im commitments and requirements for operation of the b

f.,.

system with a

single impairanent and the type of T

irapairy and any requirements for feed via the two 8

.' te.

inch supt hesders should be identified and documented.

2 ES A

'rhe acceptance criteria should be based upon the flow and y]

pressu e rcequired at various points in the system and not

(

9 upon a single point.

i 1

A q,

x d

Other items to be considered for thic revision are the

i trending of data to identify degradation, use of " alert" f4 '

( g.g f vclues to identify an adverse trend and pocsibilities for

,;s o t;esting of each sprinkler and standpipe cystem to a '

n

,s>:

Q

.o;stions.

a>

7tely quantify the flows and pressures at various E

13 -Develop pre-fire plans and tu veillance instructions for

.c

, ;/

plant ancillery Alildings.

2-14 -Upgrade the Preventive Maintenance (PM) program for fire protection related hardware.

as 3-15 -Review fire protection design documantnt3cn (i.e.

' W; compartmentation drawings, General Design Criteria, etc.) for accuracy and completeness.

2-16 -Recommend to SQN plant management the permanent fire protection organization requirements for Sequoyah Nuc? Par Plant 3QN) based on program needs and requirements, s

=

r I

8)

d PHASE IU-TARGETED COMPLETION DATE OCTOBER 1,1993 3-1

-Perform independent Firo Protection assessment to anness actions taken in Phase II are properly. implemented and offectivo.

3-2

-Issue revised Fire Hazard Analysis.

3 -Perforr

.s-cycle analysis on liigh Pressure Fire Protation components and provido replacement recommendations.

3-4

-Review provioes commitment items for -effectiveness and completeness to ensure improvement program has

'equately s

addressed and implemented proposed corrective actions.

8 b

9)

PHASE IV-TARGETED COMPLETION DECEMBER 1, d94 4-1.

-Perform independent Fire Protection assessment to assens actions taken in Phase III are properly implemented and effective.

4-2

-Complete evaluation of the mechanical and electrical fire barrier penetration seals in accordance with the guidelines established in NRC IE Notice 88-04.

The documentation of this evaluation shall be placed in the plant's formal retrieval system that documents NRC IE Notice evaluations.

4-3

~~ssue remaining updated design documentation to support final compilation into the Sequoyah huclear Plant (SQN)

Fire Protection Report and establish a

process to maintain documentation current.

9/30)Go

/

j

~

Fire Pro ion Manager Date kD&I0 9halv i

Proje Engfneer Date 0

0 PlTilt7)ianager Datb

~9/

l

/

1~

ll)LYork Efd'>! S ?

/

Sitd'fice President Date 10)

ATTACHMENT A STATUS REPORTS Wookly status reports will be providea to the sito Vice President.

NRC rocidents will bo periodicelly informed of program status.

Quarterly report to be issued.

Semi-annual progran-offectivenons reviews to be conducted by an off-cito organization.

RIMS, MR 2F-C 11) i

.c-&

v

,,.y w.

e..m rr mv e -

v-

,hc gr

  • 14?'

r t

4-

ENCLOSURE 2 List. of Conunilments

~

1.

Completo fire Protection Improvement Plan. Phase-T, b) April 1, 1992.

2.

Complete Firo Protection Improvement Plan, Phase II., by 0ctober 1, 1992.

3.- Complete Fire Protection Improvement Plan, Phase III, by October 1.-1993.

4... Completo Fire Protection Improvement Plan, Phase'!V, by December 1, 1994.

PLO90204/15r l

l g..

lf a

f I

s i

v'

(

y 17M'e aw 474gq 9

.e,,-,

-wme-yy wa-.yw-@_w y

q

= + -..-,.-S y-+

upanae-y-y---ya--wwT 3er - - - - * ' '7-4-ww-WWTw"w

--P'*tw

'q p-T g'-

y,v t" MYW-

-TF i73ur F-W F

'