MONTHYEARIR 05000266/19810011981-02-13013 February 1981 IE Insp Repts 50-266/81-01 & 50-301/81-01 on 810102-30.No Noncompliance Noted.Major Areas Inspected:Followup on Items of Noncompliance,Operational Safety Verification & Monthly Maint Observation Project stage: Request ML20008E7351981-03-0202 March 1981 Responds to NRC 801021 & 810122 Requests for Addl Info Re Fire Protection Safety Evaluation Suppl.App R Mod Requirements Are Narrow in Scope & Do Not Assure That Increased Plant Safety Will Be Achieved Project stage: Other ML19247E3141981-03-18018 March 1981 Provides Info Re Fire Protection Mods at Facilities.Items Addressed:Water Damage Protection,Fire Barriers,Ventilation Sys Control Cables,Diesel Generator Air Intake Structure & Containment Bldg Fire Stops Project stage: Other ML19347D5751981-03-18018 March 1981 Requests Extension of Schedule Dates in New Fire Protection Regulations.Requests Exemption from Requirement Forbidding Shift Supervisor to Belong to Fire Brigade.Provides Basis for Both Requests Project stage: Other ML19347D5721981-03-18018 March 1981 Forwards Fire Protection Exemption Request Project stage: Other ML20003E7381981-04-0404 April 1981 Revises Reading of Second Paragraph on Page 7 of . Revised Statement Is Compatible W/Present Facility Fire Protection Organization Excluding Maint Group Personnel as Fire Brigade Members Project stage: Other ML20003G9571981-04-23023 April 1981 Informs That Fee for Fire Protection Mods Not Justified Per 10CFR170.22 Project stage: Other ML20004D4481981-06-0505 June 1981 Responds to NRC Re Fee for Approval of Licensee 810423 Request for Time Extension for Fire Protection Mods. Payment of Fee Should Not Be Required Since Request Was Not in Form of Amend to OL Project stage: Request ML20005A6041981-06-23023 June 1981 Advises That Applicant Disagrees W/Denial of Request for Exemption to 10CFR50 App R, Section Iii.H.Duty Operating Supervisor Designated as Fire Brigade Leader.Util Will Revise Circulating Water Pumphouse Mod for Item 3.2.2 Project stage: Request ML20030A9371981-07-24024 July 1981 Notifies That Util Will Periodically Test Inservice Hydostatic Fire Hoses Per NFPA 1962 & Requirements of 10CFR50 App E Section Iii.E Project stage: Other ML17275B3781981-08-11011 August 1981 Responds to 810724 Request for Clarification of Requirements Re Fire Hose Hydrostatic Testing.Util Commitment to Purchase New Fire Hose Is in Accordance W/Requirements of NEPA 1961 Code Project stage: Approval ML20031D3361981-10-0202 October 1981 Provides Status of Fire Protection Mods for Facility. Detectors Will Be Installed in Unit 1 Containment During Refueling Outage Which Begins 811009 & in Unit 2 During Spring 1982 Outage Project stage: Other ML20040E6821982-01-29029 January 1982 Requests Mod to 810318 Submittal Requesting Extension of Schedule Date Re Fire Protection to Revise Commitment Dates to 820630 & 820131,respectively Project stage: Other ML20041D8461982-02-18018 February 1982 Ack Receipt of Modifying 10CFR,App R Fire Protection Exemption Request.Evaluation of Request Will Be Forthcoming Project stage: Other ML20052F8051982-05-0404 May 1982 Advises That Commission Has Granted Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c). Revision of Generic Ltr 81-12 Encl Project stage: Approval ML20052F8091982-05-0404 May 1982 Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c) Project stage: Approval 1981-06-23
[Table View] |
Text
.
O 1
Wisconsin Electnc eom coww 231 W. MICHIGAN P.O. BOX 2046. MILWAUKEE, WI 53201 March 18, 1981 Mr. Samuel J. Chilk Secretary of the Commission U.
S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Deal Mr. Chilk:
DOCKET NOS. 50-266 AND 50-301 FIRE PROTECTION EXEMPTION REQUEST POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 The enclosed original and two copies of a letter to Mr. Harold R.
Denton dated March 18, 1981, constitutes a request, pursuant to 10 CFR Part 50.12, for exemption from certain of the requirements of 10 CFR Part 50.48 with respect to the Point Beach Nuclear Plant, Unit Nos. 1 and 2.
Very truly yours, O
Sol Burstein Executive Vice President Enclosures Copy to: NRC Resident Inspector 6l