Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082S840 + (Forwards Cycle 6 Reload & COLR)
- ML20107F384 + (Forwards Cycle 6 Reload Info for Facility Requested in)
- ML20214U305 + (Forwards Cycle 6 Startup Physics Test Rept. Per Tech Spec 6.9.1.Std Westinghouse Reload Core Startup Physics Tests Verified That Actual Reload Core Parameters within Acceptable Design Limits)
- ML19274D222 + (Forwards Cycle 6 Startup Test Rept Submitted in Accordance W/Tech Specs Section 6.7.A.1)
- ML19274D223 + (Forwards Cycle 6 Startup Test Rept Submitted in Accordance W/Tech Specs Section 6.7.A.1)
- ML20087G873 + (Forwards Cycle 6 Startup Test Rept Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 6 Reload Core Design)
- ML20211F433 + (Forwards Cycle 6 Startup Test Rept for Seabrook Station, Unit 1, IAW Requirements of TS 6.8.1.1)
- JAFP-83-1163, Forwards Cycle 6 Startup Test Rept, Per Reg Guide 10.1 & Tech Spec 6.9.A.1.b + (Forwards Cycle 6 Startup Test Rept, Per Reg Guide 10.1 & Tech Spec 6.9.A.1.b)
- ML19254D889 + (Forwards Cycle 7 Startup Physics Test Rept)
- ML20248B267 + (Forwards Cycle 7 Startup Physics Test Rept,Indian Point Unit 3)
- ML14184A114 + (Forwards Cycle 7 Startup Physics Test Results)
- ML14184A115 + (Forwards Cycle 7 Startup Physics Test Results.)
- ML20210R793 + (Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1)
- ML17312B206 + (Forwards Cycle 7 Steam Generator Evaluation Rept Which Discusses Latest Eddy Current Testing Exam Results Along W/Methodologies Used to Determine Appropriate Cycle Length)
- ML20043B192 + (Forwards Cycle 8 & Cycle 2 Core Operating Limits Rept,Per Tech Spec 6.9.1.14)
- ML19327B320 + (Forwards Cycle 8 Core Surveillance Rept for Reduced Temp Operation.No Key Analysis Parameters Would Become More Limiting During Cycle 8 Operation W/Reduced Temp Conditions than Values Assumed in Applicable Safety Analysis)
- ML20246N150 + (Forwards Cycle 8 Radial Peaking Factor Limit Rept & Graph, Max (Fqt X Prel) Vs Core Height During Normal Operation)
- ML18093A441 + (Forwards Cycle 8 Radial Peaking Factor Limit Rept Per Tech Spec Section 6.9.1.9.Rept Prepared by Westinghouse in Accordance w/WCAP-8403, Power Distribution Control & Load Following Procedures. Util Concurs W/Rept)
- ML20077H061 + (Forwards Cycle 8 Reload Rept. Rept Contains Tech Spec Changes,Changes to Core Operating Limits Rept & Marked Up FSAR Chapters)
- JAFP-87-0441, Forwards Cycle 8 Startup Test Rept,Per Reg Guide 10.1 & Tech Spec 6.9.A.1 + (Forwards Cycle 8 Startup Test Rept,Per Reg Guide 10.1 & Tech Spec 6.9.A.1)
- 3F0394-04, Forwards Cycle 9 COLR, Rev 1 & Pressure & Temp Limits Rept, Rev 0 to Support Implementation of Crystal River,Unit 3 Improved Ts.Rev 1 to COLR Includes Mod to EOC Moderator Temp Coefficient Limit + (Forwards Cycle 9 COLR, Rev 1 & Pressure & Temp Limits Rept, Rev 0 to Support Implementation of Crystal River,Unit 3 Improved Ts.Rev 1 to COLR Includes Mod to EOC Moderator Temp Coefficient Limit)
- ML18094A306 + (Forwards Cycle 9 Radial Peaking Factor Limit Rept.Concurs W/ Rept in Accordance W/Westinghouse Methodology, Power Distribution Control & Loading Following Procedures, WCAP-8385)
- ML20202F872 + (Forwards Cycle 9 Radial Peaking Factor Rept,Per Tech Spec 6.9.1.7.F(xy) Unrodded Peaking Factor Changed from 1.66 (Cycle 8) to 1.70 for Cycle 9.Change to Tech Specs Section 5 Re Fuel Assembly Weight Will Be Submitted)
- ML20198R012 + (Forwards Cycle 9 Update to Songs,Units 2 & 3 TS Bases. Changes to TS Bases Implemented Without Prior NRC Approval Provided to NRC on Frequency Consistent w/10CFR50.71(e))
- ML18016A706 + (Forwards Cycle 9 to COLR IAW TS 6.9.1.6.4.Rev Incorporates Changes Necessary as Result of Cycle 9 Core Changes.Previous Info Submitted to Staff with Regards to Cycle 8 Colr,Rev 1, Is Being Corrected)
- HNP-98-166, Forwards Cycle 9 to COLR IAW TS 6.9.1.6.4.Rev Incorporates Changes Necessary as Result of Cycle 9 Core Changes.Previous Info Submitted to Staff with Regards to Cycle 8 Colr,Rev 1, Is Being Corrected + (Forwards Cycle 9 to COLR IAW TS 6.9.1.6.4.Rev Incorporates Changes Necessary as Result of Cycle 9 Core Changes.Previous Info Submitted to Staff with Regards to Cycle 8 Colr,Rev 1, Is Being Corrected)
- ML19241B287 + (Forwards Cycle III Startup Test Rept)
- ML19241B288 + (Forwards Cycle III Startup Test Rept)
- ML20104A345 + (Forwards Cycle IV Irradiated Fuel Insp Following Cycle IV Operation Nov-Dec 1978)
- ML20049H623 + (Forwards Cycle IX Startup Test Rept Per Tech Spec 6.7.A.1)
- ML13330B291 + (Forwards Cycle X Mods Design Descriptions for Recirculation Sys Re ESF Single Failure Analysis)
- NG-97-0703, Forwards Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan Changes & Commitment Changes for Period 951001-970301 + (Forwards Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan Changes & Commitment Changes for Period 951001-970301)
- ML20214V704 + (Forwards Cygna Energy Svc 870522,28 & 0601 Ltrs Re Snow Loads That Should Be Combined W/Nrc Spectra Seismic Loads, Load Data Necessary for Evaluation of Vapor Container & VC column-to-shell Connection,Per SEP Topic III-7.B)
- ML20214T248 + (Forwards Cygna Energy Svcs in Support of Util Response Questions Raised by Technical Consultant,M Russell of Eg&G.Reactor & Pressurizer Head Vent Piping Analysis Performed by Util.Problem Acceptable,Per Telcon)
- ML20116K657 + (Forwards Cygna Ltr Summarizing Status of Cygna Overall Conclusions for All Four Phases of Independent Assessment Program)
- ML20199H469 + (Forwards Cygna Preliminary Description of Open Items & Generic Issues Presented at 850314 Meeting W/Util)
- ML20100L550 + (Forwards Cygna Response in Opposition to Case Third Motion for Summary Disposition Re Lack of Independence &/Or Credibility of Cygna & Affidavit of Cygna Witness Nh Williams.Related Correspondence)
- ML20135C058 + (Forwards Cygna Response to Board Memorandum Re Cygna Independence.W/O Encl.Related Correspondence)
- ML20003C268 + (Forwards D & B Leach Re Regulations on Recycled Contaminated Metals)
- ML19350D459 + (Forwards D & L Kellner 810226 Complaint Re ASLB Rule Requiring Intervenor Wishing to cross-ezamine Witness to Be Present for Duration of Testimony.Requests Response)
- ML17345A415 + (Forwards D Auerbach Expressing Concerns Re 880816 Spill of 3,200 Gallons of Radioactive Coolant Due to Leaking Pump Valve & Util Violations & Fines,For Response)
- ML20080A988 + (Forwards D Bement 830617 Memo Re FEMA Supplemental Interim Finding on Offsite Radiological Emergency Planning & Preparedness,In Response to NRC 830413 Request)
- ML19289G135 + (Forwards D Browning 790404 Questions Re Fl Nuclear Power Situation.Requests Necessary Info for Reply)
- ML19341A977 + (Forwards D Carlson Re Emergency Planning Around Facilities.Requests Response)
- ML20239A528 + (Forwards D Clark Memo to Author & R Southwick Rept Summarizing Hearings Held in May & June by State of CA Puc on Proposed Power Reactor)
- ML20041C352 + (Forwards D Collins .Ltr Should Be Treated as Motion to Withdraw Contested Contentions 1-4.Util & NRC Do Not Object to Withdrawal)
- ML20234B624 + (Forwards D Cook Memo Re Personen Book Planned on Bodega)
- ML20054F705 + (Forwards D Davidoff & L Czech Testimony & Exhibit.State Radiological Emergency Plan Will Be Mailed Separately)
- ML19310A635 + (Forwards D Davis 800420 Postcard Expressing Concern Re State of Repair of Facility.Requests NRC Response.Doe to D Davis Encl)
- ML20247N608 + (Forwards D Ellison Ltr Confirming 860108 Conversations.Info Re Potential Misconduct of NRC Employees Requested)
- ML20235F302 + (Forwards D Feinberg Notice of Deposition for Scheduled 870928 Deposition.Original Case File of Feinberg Investigation Requested to Deposition.Related Correspondence.W/O Encl)
- ML19309E463 + (Forwards D Funderud to President Carter for Reply.Ltr Misdirected to DOE)