"54l4C Telephone (412) 393-6000 NuckaiGroup PA Dox 4 Shippngport. PA 15077-0004 November 20, 1986
- 0. S. Nuclear Regulatory Commission 7 Attn:
R. W. Starostecki, Director.
Division of Project & Res. Programs Region 1 631 Park Avenue King of Prussia, PA 19406 t
Reference:
Beaver 1 Valley Power Station, Unit No. 1 Docket'No. 50-334, License No. DPR-66 Cycle 6 Startup Report l
Gentlemen:.
Attached is a copy of!the Beaver Valley Power Station Unit No.
1 Cycle 6
Startup
- Report, provided in accordance with Technical Specification 6.9.1.
The standard Westinghouse reload core startup physics tests were performed to verify the actual reload core parameters were within acceptable design limits.
The results of each test are summarized including a comparison to predicted design values and applicable technical specifications.
(The parameters measured were within the acceptance criteria, therefore, the reload core design has been verified.
Very truly yours,
- Akn, J. D. Sieber Vice-President Nuclear Operations
)'
8612090221 861120
\\
DR ADOCK 05000 4
g\\
a L---
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 t
Cycle 6 Startup Report l'
Page 2 cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555
+
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn:
Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
- Mail Stop 340 -
i l