Text

Beaver Valley Power Station

." PA 1277-0004

. $lg;a9=g

,3 (412) 643 8069 FAX GEORGE S. THOMAS

?:::a":::,'::"'*"'

Nuclear Power Division August 8, 1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Heaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 6 Startup Test Report Enclosed is a copy of the Cycle 6 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 6 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria or were evaluated and determined to be within the available margin.

Sincerely,

% ych w5 George S. Thomas Enclosure c: Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator  !

Mr. D. S. Brinkman, Sr. Project Manager l 1

. ~ , . ,f PD 0239 950908 P [ DOCK PDR 05000412 i

-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _