AVER \\GE DAILY UNIT POWER LEVEL DOCKET NO.
50-202 Nine Mile Pt. #1 UNIT DATE 1/5/79 CO\\lPLETED BY T.J. Perkins TELEPilONE 315 343-2110 Ext. 1312 DECDiBER 510NTil DAY AVER AGF. DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL Oth e-Net t gg we.3,,,
I 553 17 532 2
554 18 532 3
555 19 530 4
552 20 526 5
552 526 2:
6 552 22 516 7
550 23 523 547 8
24 517 9
545 25 520 10 543 26 518 545 27 516 543 1,
2g 515 13 542 29 509 538 14 30 508 15 536 3
508 16 532 INSTRUCTIONS On this format,hst the aserage daily unit power lesciin.\\lwe-Net for each day in the reporimp month. Compute to the nearest whole megawatt.
e> I77 7901160307 m.u.: _.
_.,__m____
-e OPERATING DATA REPORT DOCKET NO.
50-220 DATE 12/8/78 y
COMPLETED 11Y _T.J.
Perkins TELEPfl0NE 315 343-2110 OPERATING STATUS I. Unit Name:
Nine Mile Point. Unit #1 Notes
- 2. Reporting Period: 12/1/78 - 12/31/78
- 3. Licensed Thenna! Power (MWt):
1850
- 4. Nameplate Rating (Gross M Ne):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Sf aximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,!f Any (Net MWe):
End of Cycle Coastdown
- 10. Reasons For Restrictions,If Any:
This Month
. Yr.-to-Date Cumulatise
- 11. I!ours In Reporting Period 744 8760 80,352
- 12. Numbu Of flours Reactor Was Critical 744 8403.8 59.473.0
- 13. Reactor Reserve Shutdown llours 0
0 1204
- 14. Ilours Generator On.Line 744 8332.6 57.022.8
- 15. Unit Resene Shutdown flours 0
0 20.2
- 16. Gross Thermal Energy Generated (MWII) 1,221,140 13,918,752 92,354,761
- 17. Gross Electrical Energy Generated (MWil) 411,629 4,622,474 30.404,186 18 Net Electrical Energy Generated (MWII) 396,976 4,467,453 29,444,376
- 19. Unit Senice Factor 100 95.1 74.9
- 20. Unit Availability Factor 100 95.1 74.9
- 21. Unit Capacity Factor (Using MDC Net) 87.5 83.6 60.1
- 22. Unit Capacity Factor (Using DER Net) 86.1 82.3 59.1
- 23. Unit Forced Outage Rate 0
1.4 10.1
- 24. Shutdowns Scheduled Oser Ne.st 6 Months (Type. Date.and Duration of Each):
March 4, 1979 Annuel Shutdcan. Overhaul and Refuel
- 25. If Shut Dowa At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Ccmmercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77 )
g.
f UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-220
+
UNIT N AME Nine Mile Pt. #1 DATE 1/5/79 REPORT MONTil DECDiBER COMPLETED fly T.J. Perkins TELEPflONE 315 343-2110 Ext. 1312
=
~
=_
e8 3 to d 6
,.s a Licensee gg s%
Cause & Correctise 2e
=
No.
Date y,
j
,g g y Event a?
- s. '
Auion to
=
$5 3 5 =!
Report =
$0 5L Present Recurrence H
y d
121 5
4.0 1-i-1 Reduced load to' change condensate demin. #13
(
l 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions O
S: Scheduled A L juipment Failure (Lxplain) 1-Manual for Prepaution of Data Ilolaintenance or Test 2 Manual Scrain.
Entry Sheets 1.n 1.icensee C. Refueling 3-Autoinatie Stram.
thent Repori t1.1:R) File t NtlRI.G-D-Regulatory Restriction 4-Other ( Explain) 0161) r r
1 -Operator Training & l.ieense Examination F Administrative 5
G.Oper a tional lis tor ( E xplain )
thhibit I - Same Source
('l/77 )
Il-Olhe r ( E xplain )
I 5
P NIAGARA M0 HAWK POWER CORPORATION HINE fille POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE December 1978 The station operated continuously during the month of December with an average capacity factor of 87.5%. The cumulative totals for 1978 are 95.1% availability and 83.6% capacity.
The monthly operating history is as follows:
December 1-4 flaintained load at approximately 570 MWe with reactor recirculation flow at an all rods out configuration until reaching 100% recirculation flow on December 4.
December 5-31 End of cycle coastdown in progress; coastdown rate approximately 5 MW(t) per day.
On December 22, reduced load from 538 MWe to 500 MWe for a coadensate demineralizer change, returning to 530 MWe upon completion.
On December 31, the last reporting day of the month and year, generator output was 521 MWe.