Forwards Cycle 6 Startup Test Rept Submitted in Accordance W/Tech Specs Section 6.7.A.1
ML19274D222
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/05/1979
From: Denise Edwards
VERMONT YANKEE NUCLEAR POWER CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19274D223 List:
References
WVY-79-4, NUDOCS 7901160301
Download: ML19274D222 (1)


Text

..

AVER \\GE DAILY UNIT POWER LEVEL DOCKET NO.

50-202 Nine Mile Pt. #1 UNIT DATE 1/5/79 CO\\lPLETED BY T.J. Perkins TELEPilONE 315 343-2110 Ext. 1312 DECDiBER 510NTil DAY AVER AGF. DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL Oth e-Net t gg we.3,,,

I 553 17 532 2

554 18 532 3

555 19 530 4

552 20 526 5

552 526 2:

6 552 22 516 7

550 23 523 547 8

24 517 9

545 25 520 10 543 26 518 545 27 516 543 1,

2g 515 13 542 29 509 538 14 30 508 15 536 3

508 16 532 INSTRUCTIONS On this format,hst the aserage daily unit power lesciin.\\lwe-Net for each day in the reporimp month. Compute to the nearest whole megawatt.

e> I77 7901160307 m.u.: _.

_.,__m____

-e OPERATING DATA REPORT DOCKET NO.

50-220 DATE 12/8/78 y

COMPLETED 11Y _T.J.

Perkins TELEPfl0NE 315 343-2110 OPERATING STATUS I. Unit Name:

Nine Mile Point. Unit #1 Notes

2. Reporting Period: 12/1/78 - 12/31/78
3. Licensed Thenna! Power (MWt):

1850

4. Nameplate Rating (Gross M Ne):

640

5. Design Electrical Rating (Net MWe):

620

6. Sf aximum Dependable Capacity (Gross MWe):

630

7. Maximum Dependable Capacity (Net MWe):

610

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,!f Any (Net MWe):

End of Cycle Coastdown

10. Reasons For Restrictions,If Any:

This Month

. Yr.-to-Date Cumulatise

11. I!ours In Reporting Period 744 8760 80,352
12. Numbu Of flours Reactor Was Critical 744 8403.8 59.473.0
13. Reactor Reserve Shutdown llours 0

0 1204

14. Ilours Generator On.Line 744 8332.6 57.022.8
15. Unit Resene Shutdown flours 0

0 20.2

16. Gross Thermal Energy Generated (MWII) 1,221,140 13,918,752 92,354,761
17. Gross Electrical Energy Generated (MWil) 411,629 4,622,474 30.404,186 18 Net Electrical Energy Generated (MWII) 396,976 4,467,453 29,444,376
19. Unit Senice Factor 100 95.1 74.9
20. Unit Availability Factor 100 95.1 74.9
21. Unit Capacity Factor (Using MDC Net) 87.5 83.6 60.1
22. Unit Capacity Factor (Using DER Net) 86.1 82.3 59.1
23. Unit Forced Outage Rate 0

1.4 10.1

24. Shutdowns Scheduled Oser Ne.st 6 Months (Type. Date.and Duration of Each):

March 4, 1979 Annuel Shutdcan. Overhaul and Refuel

25. If Shut Dowa At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Ccmmercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77 )

g.

f UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-220

+

UNIT N AME Nine Mile Pt. #1 DATE 1/5/79 REPORT MONTil DECDiBER COMPLETED fly T.J. Perkins TELEPflONE 315 343-2110 Ext. 1312

=

~

=_

e8 3 to d 6

,.s a Licensee gg s%

Cause & Correctise 2e

=

No.

Date y,

j

,g g y Event a?

s. '

Auion to

=

$5 3 5 =!

Report =

$0 5L Present Recurrence H

y d

121 5

4.0 1-i-1 Reduced load to' change condensate demin. #13

(

l 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions O

S: Scheduled A L juipment Failure (Lxplain) 1-Manual for Prepaution of Data Ilolaintenance or Test 2 Manual Scrain.

Entry Sheets 1.n 1.icensee C. Refueling 3-Autoinatie Stram.

thent Repori t1.1:R) File t NtlRI.G-D-Regulatory Restriction 4-Other ( Explain) 0161) r r

1 -Operator Training & l.ieense Examination F Administrative 5

G.Oper a tional lis tor ( E xplain )

thhibit I - Same Source

('l/77 )

Il-Olhe r ( E xplain )

I 5

P NIAGARA M0 HAWK POWER CORPORATION HINE fille POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE December 1978 The station operated continuously during the month of December with an average capacity factor of 87.5%. The cumulative totals for 1978 are 95.1% availability and 83.6% capacity.

The monthly operating history is as follows:

December 1-4 flaintained load at approximately 570 MWe with reactor recirculation flow at an all rods out configuration until reaching 100% recirculation flow on December 4.

December 5-31 End of cycle coastdown in progress; coastdown rate approximately 5 MW(t) per day.

On December 22, reduced load from 538 MWe to 500 MWe for a coadensate demineralizer change, returning to 530 MWe upon completion.

On December 31, the last reporting day of the month and year, generator output was 521 MWe.