ML20077H061

From kanterella
Jump to navigation Jump to search
Forwards Cycle 8 Reload Rept. Rept Contains Tech Spec Changes,Changes to Core Operating Limits Rept & Marked Up FSAR Chapters
ML20077H061
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/26/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077H063 List:
References
NUDOCS 9107050080
Download: ML20077H061 (3)


Text

1 ll l

/u, n.n r nm., 9 s ham h h av 1%!,a twn Dri! \ *

  • I' n"I' A po g , por

{ hplwly \ (

  • X 'l 10
  • ua + we ,

I 'I!EIE O I DUKEPOWER June 26, 1991 i

U. S. liuclear Regulatory Commission '

ATTN: Document control Desk l Washington, D. C. 20555 1

Subject:

McGuire Nuclear Station, Unit 1 Docket Number 50-369 Cycle 8 Reload Submittal Attached is the Reload Report to support the startup of McGuire Unit 1 Cycle 8. This report contains Technical Specification changes (Attachment I), changes to the Coro operating Limits Report (COLR) (Attachment II), and markups of the appropriate Final Safety Analysis Report (FSAR) chapters (Attachment III). Attachments II and III are provided for your information and use to assist in the review of the Technical Specification amendment. Design information relative to McGuire Unit 1 Cycle 8 appears in Attachment IV. -

The changes presented in this report reflect the first time Duke has performed the reload safety analysis at one of its Westinghouse units. Cycle 8 is also the first use of B & W Fuel Company fuel in a complete reload batch at McGuire.

A copy of this amendment request has been provided to the State of North Carolina.

Please note that this Technical Specification amendment request is required for the startup of McGuire Unit 1 Cycle 8, which is scheduled for November, 1991. If there are any concerns identified during the review please notify us as soon as possible, so that we may_ assist in resolving them in a timely manner.

If there are any quest' ions, please call Scott Gewehr at (704) 373-7581.

Very truly yours, h.

M. S. Tuckman rrsubl/ sag

%)

'f \

. . _ - - - - - - _ . - . - - _ . _ . - . . _ . . = - _ . - . . . -. . - . - - - . - . - -.. _ _ --_

U. S. Nuclear Regulatory Commission June 26, 1991 Page 2 cc: Mr. T. A. Road, Project Manager Offico of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 9113, OWFN Washington, D. C. 20555 Mr. S. D. Ebnetor, Regional Administrator U.S. Nuclear Rogulatory Commission - Region II 101 Mariotta Stroot, NW - Suito 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Radiation Protretion Branch Division of Facility Services Department of Iluman Services 701 Barbour Drivo Raleigh, North Carolina 27603-2008

,. yeweiw,,-c,-----w-

  • m m w er - v er m e v w- w--'"e e w---*< e--v- T ~' ' * ' ' ' " ' * * ' '" " * " " *" " " ~ " ' '

1 U. S. liuclear Regulatory Commission June 26, 1991 Pago 3 M. S. Tuckman, being duly sworn, r atos that he is Vice-President i of Duke Power Company; and that ..i is authorized on the part of said Company to sign and file with the liuclear Regulatory Commission this revision to the McGuire liuclear Station Technical Specifications, Appendix A to Facility Operating License lios. IIPF-9 and llPF-17; and that all statements and matters set forth therein are true and correct to the best of his knowledge, e

f

) '

T bww i M. S. Tuckman, Vico-President Subscribed and sworn to before me this 26th day of June, 1991.

/' //

.Y.sbl. / < ,7 %hn t l',/[

.)

ifntayyPublic  :

My coramission expires: ,

/V NO

\

j

. ( /V?$

V r ene-2,w.7,-y.- %v --.-,...-,,,,,www.,-.w-,,r-r,,.-v_.

e--...s,-w.,e-e,-,www.r= .--+,we---,--~.w=-w.,.r----.-w, .,w-- ,-,..-r-,-ww.*,w .