July 25, 1975 4
Mr. K. R. Coller
-Assistant Director for L
Operating Reactors Division of. Reactor Licensing 7
U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Goller:
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NUMBER 50-219 CYCLE 6 RELOAD INFORMATION Attached is the information for the' Oyster Creek facility which was requested in Enclosure 2 to your letter of June 18, 1975. We recognize the importance of adequate planning and scheduling of licensing action and_ assure you that we will cooperate with the Nuclear Regulatory Com-mission to the extent possible in achieving your obj ective of complete, prompt reviews of the necessary submittals.
As you can see from the attachment, we plan to submit very early that information which may be required to support our next refueling
-at Oyster Creek.
By early submittal, we hope to arrive at a schedule which would permit the resolution of all licensing concerns prior to our scheduled shutdown on April 10, 1976.
This would enable many of our personnel who must participate in the licensing process to concentrate on their other responsibilities in the conduct and support of outage activities.
The information provided in the attachment addresses only our next refueling.
I should also point out that we anticipate a number of licensing submittals prior to the next cycle.
These actions would in-clude' Technical Specification Changes concerned with ECCS, Fuel Cladding Integrity Safety Limit and associated instrument set points, and would be directed at alleviating the present derated condition of Oyster Creek.
We will notify you of the schedule for such submittals as they~become established.
Very trul yours, n
Qls j l}l 5 n !..'<: b Y Ivan R. Fi fro.c, Jr.
Vice President asb Attachment 9604220316 960213 8001 PDR FOIA DEKOK95-258 PDR
~
h J
CYCLE 6 RELOAD INFORMATION 4'
J..
Name of facility: Oyster Creek Nuclear Generating Station.
Scheduled date for next refueling shutdoun: April 10, 1976.
2.
Sdheduled date fbr restart (bitouing refueling: May 22, 1976.
3.
Witt refheting or recumption of operation thereafter require a 4.
If Technical Specificktion Change or other licence amendment?
anauer is yes, uhat'in general, vitt these be?: The analysis of our Cycle 6 licensing requirements has not been complet,ed at this Ou'r review will include the ef fect of refueling upon plant-time.
operation and Technical Specifications associated with ECCS, Fuel Cladding Integrity Safety Limit, Continuous Rod Withdrawal-Error, Maximum In-Sequence Rod Worth.
Schedules for licensing actions required, if any, will be forwarded to you as soon as they become established.
Sbheduled datefe) fdr submitting proposed licensing action and S.
supporting information: The necessary information will'be fur-nished by January 16, 1976 to NRC.
I Important Licensing considerations associated uith refheling, e.g.,
6.
neo or different fuet design or supplier, unrevieved design or performance analysis methods, significant changes in fuel d_esign,
)
The Cycle 6 reload fuel differs from neu operating procedures:
that previously reviewed by NRC only in minor mechanical design No other changes in the abovc items are anticipated at changes.
this time, 1
4
-~