Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Completed Questionnaire Re Standby Diesel Generator Units". Since there have been only a few results, also nearby values are displayed.

Showing below up to 27 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20035A757  + (Forwards Completed Permit Application to Use Nusyn-Noxfish in Emergency Spray Pond to Control Fish.Util Will Continue to Routinely Inspect Spray Pond to Verify That Fish Population Not Reestablished)
  • ML20100J156  + (Forwards Completed Physics Testing Results of Cycle 9 Using Rod Swap Methodology Approved by .Results of Next Unit 1 Use of Rod Swap Technique Will Be Submitted Per)
  • ML20062B808  + (Forwards Completed Procedures SP-A.2,SP-A.4,SP-A.5,SP-A.6 & SP-A.8 as Part of Region 1 Incident Response Suppl.W/O Encl)
  • ML20058F620  + (Forwards Completed Proposal Evaluation Form for Task Order 5, Svc Water Sys Operational Performance Insp-Oconee)
  • NLS8500162, Forwards Completed Questionnaire & Comment Sheet in Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Informal Integrated Living Schedule Planned  + (Forwards Completed Questionnaire & Comment Sheet in Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Informal Integrated Living Schedule Planned)
  • ML20031H148  + (Forwards Completed Questionnaire Included W/Ippolito Re Station Blackout,Unresolved Safety Issue A-44. Inapplicable LERs of Ippolito Ltr Have Been Excluded from Completed Questionnaire)
  • AECM-85-0203, Forwards Completed Questionnaire Indicating Position on Implementation of Integrated Living Schedule,Per Generic Ltr 85-07.Evaluation of Implementing Schedule for Future Outages Will Be Submitted After Unit 1 Refueling  + (Forwards Completed Questionnaire Indicating Position on Implementation of Integrated Living Schedule,Per Generic Ltr 85-07.Evaluation of Implementing Schedule for Future Outages Will Be Submitted After Unit 1 Refueling)
  • ML20128C863  + (Forwards Completed Questionnaire Re 850519 Oil Spill, Submitted on 850605 by T Voltaggio)
  • ML20207B411  + (Forwards Completed Questionnaire Re 860604 Oil Spill)
  • ML20236B684  + (Forwards Completed Questionnaire Re Erosion/Corrosion Experience in Plant Feedwater Lines,Per Dr Muller 870723 Request)
  • ML20234D427  + (Forwards Completed Questionnaire Re Erosion/Corrosion in Feedwater Pipes,Per 870715 Request)
  • ML20237H291  + (Forwards Completed Questionnaire Re Erosion & Corrosion Experience at Plant,Per NRC 870716 Request)
  • ML20043A881  + (Forwards Completed Questionnaire Re NRC Hiring & Periodic Reinvestigation Procedures for Determining Suitability for Sensitive Positions in Response to)
  • ML20086J039  + (Forwards Completed Questionnaire Re Natl Profile on Mixed Waste)
  • ML18093A835  + (Forwards Completed Questionnaire Re Participation in Isap Ii,Per Generic Ltr 88-02.Recommends No Suggestions for Program Improvements or Changes at This Time)
  • ML20009C818  + (Forwards Completed Questionnaire Re Reliability Study of Standby Diesel Generators,Per Kr Goller 771215 Request. Responses to Questionnaire Address Unit 1 Diesel Generators. Requests Results of Reliability Study)
  • ML20009F140  + (Forwards Completed Questionnaire Re Reliability Study of Standby Diesel Generator Units,In Response to NRC 771215 Request)
  • ML20009F427  + (Forwards Completed Questionnaire Re Reliability Study of Standby Diesel Generators)
  • ML20009F145  + (Forwards Completed Questionnaire Re Reliability Study of Standby Diesel Generator Units,In Response to NRC)
  • ML19326C510  + (Forwards Completed Questionnaire Re Reliability of Standby Diesel Generators in Response to NRC 771215 & 780103 Requests for Info)
  • ML20034C630  + (Forwards Completed Questionnaire Re Scientific Misconduct at Nrc.No Reported Alleged Cases of Scientific Misconduct in NRC History Exists)
  • ML20009C350  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units Reliability,In Response to)
  • ML20009F155  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units,In Response to NRC 771215 Request)
  • ML20009F335  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units Reliability,In Response to NRC)
  • ML20009F318  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units Reliability,In Response to NRC)
  • ML20009D316  + (Forwards Completed Questionnaire Re Standby Diesel Generator Reliability)
  • ML17257A499  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units)
  • ML20009F065  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units)
  • ML20030A784  + (Forwards Completed Questionnaire Re Standby Diesel Generator Units)
  • ML20028B687  + (Forwards Completed Questionnaire Re Steam Generator Tube Integrity,In Response to Generic Ltr 82-22, Request for Info Re Steam Generator Tube Integrity)
  • ML20066E405  + (Forwards Completed Questionnaire Re Steam Generator Tube Integrity,Generic Ltr 82-22.Second & Last Questions Applicable Since Initial Criticality Achieved on 821022)
  • ML19210A575  + (Forwards Completed Questionnaire Re Steam Generator Operating History)
  • ML19317G947  + (Forwards Completed Questionnaire Re Steam Generator Operating History)
  • ML20215E284  + (Forwards Completed Questionnaire for Annual Rept to Congress Re Natl Park Svc on Federal Archeology Program,Per 870317 Request.Nrc Does Not Maintain or Restore Any Archeological or Historic Properties Identified During Review Process)
  • SNRC-1716, Forwards Completed Questionnaire for Each Applicable Type of Operational Insp,Audit or Evaluation as Identified,Per Generic Ltr 90-01  + (Forwards Completed Questionnaire for Each Applicable Type of Operational Insp,Audit or Evaluation as Identified,Per Generic Ltr 90-01)
  • ML19323G954  + (Forwards Completed Questionnaire for Epidemiologic Studies on Health Effects of Low Level Ionizing Radiation Exposure Per Dl Ziemann 800304 Request)
  • ML20009F149  + (Forwards Completed Questionnaire for NRC Reliability Study of Diesel Generator,In Response to NRC 771215 Request)
  • ML20009F138  + (Forwards Completed Questionnaire for Reliability Study of Standby Diesel Generator,In Response to NRC 771215 & 780103 Requests)
  • ML20012E009  + (Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey)
  • ML20012A126  + (Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey)
  • ML17319B684  + (Forwards Completed Questionnaire in Response to Generic Ltr 82-22 Re Steam Generator Tube Integrity)
  • ML20090B704  + (Forwards Completed Questionnaire in Response to Generic Ltr 82-22, Congressional Request for Info Re Steam Generator Tube Integrity. No Major Steam Generator Repairs Anticipated in Next 5 Yrs)
  • ELV-01399, Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Input Survey. Info Provides NRC W/Insight on Time Managers Spend on Responding to Insps & Audits  + (Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Input Survey. Info Provides NRC W/Insight on Time Managers Spend on Responding to Insps & Audits)
  • ML20033H283  + (Forwards Completed Questionnaire in Response to Generic Ltr 90-01 Re Voluntary Participation in NRC Regulatory Impact Survey)
  • ML20067B172  + (Forwards Completed Questionnaire in Response to Generic Ltr 82-22 Re Steam Generator Tube Integrity.Info Verbally Provided to C Stahle in 821130 Telcon)
  • ML20072C509  + (Forwards Completed Questionnaire on Backfit Process)
  • ML18086A842  + (Forwards Completed Questionnaire on Diesel Generators)
  • ML20031F306  + (Forwards Completed Questionnaire,Tables 1-3 Re Diesel Generator Operations Data for CY77-CY80,in Response to 810709 Request for Info Concerning Station Blackout, Unresolved Safety Issue A-44)
  • ML20235H490  + (Forwards Completed Questionnaires Re Erosion/Corrosion Experience,Piping Design & Feedwater & Condensate Chemistry. W/10 Oversize Drawings)
  • ML20006B417  + (Forwards Completed Questionnaires for Temporary Instruction 2515/104, Fitness for Duty:Insp of Initial Training Program & Discusses Discrepancies)
  • NRC-90-0037, Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey  + (Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey)
  • ML20137A562  + (Forwards Completed Reactor Checklist for Export License Application)
  • ML20155F374  + (Forwards Completed Reactor Checklist for Use in Review of Requests for Highly Enriched U to Determine Technical & Economic Justification from Mcmaster Univ for Export License Application)