I.,
Public Service Electric and Gas Company Steven E. Miltenberger Vice President -
Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4199 Nuclear Operations February 18, 1988 NLR-N88025 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
INTEGRATED SAFETY ASSESSMENT PROGRAM II; SURVEY RESPONSE SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311 AND 50-354 In response to Generic Letter 88-02, Public Service Electric and Gas Company (PSE&G) hereby forwards the attached completed questionnaire relative to participation in the subject program.
In accordance with the Generic Letter, this response is an indication of PSE&G's interest in the program and is not an explicit commitment to participate.
Should there be any questions regarding the attached, please do not hesitate to contact us.
Attachment
~-cc:::-:-=~~-.;-,----;::;;;~1-0~~,
(
8805240256 880218
\\
Sincerely,
Document Control Desk 2
C Mr. G. W. Rivenbark USNRC Licensing Project Manager -
Hope Creek Mr. R. w. Borchardt USNRC Senior Resident Inspector -
Hope Creek Mr. D. C. Fischer USNRC Licensing Project Manager -
Salem Mr. T. J. Kenny USNRC Senior Resident Inspector -
Salem Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 02-18-88
ATTACHMENT Integrated Safety Assessment Prcgram (ISAF) TI Response Fonnat to Generic Letter 88-02 Facility Name: Salem/Hope Creek L'tility: Public Service Electric and Gas Co.
Individual Contact Name:
Bruce E. Hall
~~~~~~~~~~~- Phone Number: (609)339-3224 An expression of interest will not be considered a coR111itment tc participate on the part of the utility.
- 1.
Would you be interested in.,participating in ISAP II? If so, in what time frame?
Yes -
6/89 Salem 1 and 2 Yes -
1/90 Hope Creek
- 2.
Do you believe that an industry/NRC seminar consisting of a brief discussion by NRC followed by a question and answer period would be beneficial prior to making a decision?
Yes
- 3.
Would you be interested in a one-on-one meeting with the ~PC to discuss your particular facility or facilities?
Possibly, it would depend upon the object~ves of the meeting.
The need for such meetings*
should be determined subsequent to the industry/NRC seminar.
- 4.
If you remain ur.decided regarding participation, what additional information do you need in order to make a decision?
- 5.
Do you have any potential concerns about participating in !~AP II?*
Yes, that the program losses focus and consumes significant resources unnecessarily.
Some issues are still generic and should be addressed as an industry as opposed to each utility trying to resolve the problem.
- 6.
Do you have any suggestions for prograM improvements or changes?
Not at this time.
- .~
\\.;
ATTACHMENT Integrated Safety Assessment Program (ISAF) TI Response Format to Generic Letter 88-02 Facility Name: Salem/Hope Creek Utility: Public Service Electric and Gas Co.
Individual Contact Name:
Bruce E. Hall Phone Number: (609)339-3224
~~~~~~~~~~~-
An expression of interest will not be considered a commitment tc participate on the part of the utility.
- 1.
Would you be interested in....participating in ISAP II? If so, in what time frame?
Yes -
6/89 Salem 1 and 2 Yes -
1/90 Hope Creek
- 2.
Do you believe that an industry/NRC seminar consisting of a brief discussion by NRC followed by a question and answer period would be beneficial prior to making a decision?
Yes
- 3.
Would you be interested in a one-on-one meeting with the ~!PC to discuss your particular facility or facilities?
Possibly, it would depend upon the object~ves of the meeting.
The need for such meetings should be determined subsequent to the industry/NRG seminar.
- 4.
If you remain undecided regarding participation, what additional information do you need in order to make a decision?
- 5.
Do you have any potential concerns about participating in !~AP II?
Yes, that the program losses focus and consumes significant resources unnecessarily.
Some issues are still generic and should be addressed as an industry as opposed to each utility trying to resolve the problem.
- 6.
Do you have any suggestions for progra~ improvements or changes?
Not at this time.