Forwards Completed Questionnaire for NRC Reliability Study of Diesel Generator,In Response to NRC 771215 Request
ML20009F149
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/24/1978
From: Niav Hughes
TENNESSEE VALLEY AUTHORITY
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20009F148 List:
References
NUDOCS 8107290249
Download: ML20009F149 (3)


Text

.

~"

' TENNESSEE VALLEY AUTHCRITY CH A TTA N.CC 3 A. TEP.IS f;E 37401 4

~,. L.;,,

g/yganuary 24, 1978' j-J pp 7073 s (f#"'ye:4,('

d:li A3 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cotanission

' N' ;

11h Washington, DC 20555 Centlemen:

QUESTION AIRE FOR NRC RELIABILITY STUDY OF STANDBY DIESEL GENERATOR UNITS In response to Karl R. Goller's letter dated Decem~er 15, 1977, on u

this subject, we are enclosing the completed questionnaire.

l

^

A supplemental report will be st.bmitted on those items for which we could not readily obtain information.

Very truly yours, TENNESSEE VALLEY,UTHORITY A

N. B. Hughes, Jr.

Manager of Power Enclosure l

I D

49 810720 F

M 05000259 i

PDR 780310270

- An Equal occartunity Emp; oyer l

.t 0

id s,

i

..q Are any foreton cases such as propane, freon, halon, carbon S.

-')

. dioxide, etc. storea in the: Diesel Engine room?

-,R Yes No X or adjacent buildings? Yes X No 4

Il If yes, (other than hand portable fire extinguishers), then identify gases and give approximate tank size.

3 Volume (V1 ) Tons

.f

.., Gases

-s if x

17 tons p

Liquid coo - U1 and 2 y

6 tons 3

Liquid CO, - U3

.I Does control system autenatically bypass, in emer9ency 1

T.

,]

starting, any engine temcorarily out of service for

-maintenance? Yes No X

.4 If yes, then how many failures to ' bypass have occured?

j y

k Does the c,ontrol system automatically override the test U.

g

. mode under emergency conoitions? Yes X

No j

Have repetitive mechanical f ailures occurred in any ccmoonent part

  • gl f

.V..or subsystem of tne engine, gene,rator, or switcn gear, ecc.?

-I Yes X No

0..

0 Air start motor system

.If yes, then which part or subsystem?

}

.a

.How many failures?

UN

,f

.I Give nature of failure. Forcinn material in air start system gets 1.

in valves and air start motor vancs.

I

'-!'t*

}

Would periodic (yearly or other) evaluation and/or testing A

W.

(

'by "outside experts' contribute sicnificantly to the diesel-generator reliability? Yes No X

}

a We have developed.

Give brief reasons for the answer.

(

a good maintenance program with trained personnel.

Vendors are contacted upon necu casts.

,2 T

st

.(;

T,.

7 i1 c

c-

~_

g -,;

-..., m m...

'7

[.

f,I 4..

m- -*

a s

.h 2

Give the accumulated time-load ocerating record for each e

j x,

1.

diesel-generator unit frca installation to the present

'i (Running Hours):

j suppicmental report if

..f Preoperational test Date data exists.

.f

Engine Sury. Testing & :

cnergency iotai 4..k 4

Serial No. :

Nintenance Hrs. :

and Other Hours :

No Load : Loaded :

Service Hrs. :

h:#

' ~h

)

j 4

'T c'2

.)

-t

.Y T

."h 757.

Surveillance test load (percent of continuous rating) y,k,l 2.

I Give the projected or olanned tice-loaf 60eration for

3. -each diesel-generator unit curing the next 12 :::ontns. - Approximate

-y

!j c.ergency' iotal

.y

Surveillance 4 h(s
liaintenance Hrs. :

and other :

Hours Service Hrs. :

.i 18 5

.W 13 ry Provide the following sunma'r'y o'f the peric'dic surveillance' testing

~ ~

"'I U

4.

m exp.erience:

-.g g.

g

. Starting date of surveillance testing (OL date) U3 - 11/21/75 Y

A.

b.

Periodic test interval Monthly U1 and 2 - 262 U3 - 113 Total number of surveillsnce tests nerformed c.

7 (see Abnormal occurrence j

m 4.

Total number of tegt failures Reports)

'h 5

~~

failure to accept ic;d 0 _.

0 Tailure to start failures due to coerator error e

'

  • failure to carry loaa 4

failure due to equionent not being operative during emergency 2

I

____ conditions o

3

.:j Supply a copy of the surveil' lance test procedures with this e.

't.j completed questiorinaire. - (attached) o

-m

e'l:

-tu k

.=. = :.a.. :. z. ; ;- _: :..:: ?.~.

.....N.... ; _..~...:

......r'.'. C* ~

' M ;-- = --. ' -