Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12342A377 + (Final Safety Evaluation of Nuclear Energy Institute Topical Report NEI 09-10, Revision 1A, Guidelines for Effective Prevention and Management of System Gas Accumulation, (Cover Letter))
- ML12342A379 + (Final Safety Evaluation of Nuclear Energy Institute Topical Report NEI 09-10, Revision 1a, Guidelines for Effective Prevention and Management of System Gas Accumulation)
- ML17258B074 + (Final Safety Evaluation of SEP Topic IV-2,reactivity Control Sys,Including Functional Design & Protection Against Single Failures.General Design Criterion 25 Re Electrical Failures within Reactivity Control Sys Met)
- ML17206A431 + (Final Safety Evaluation of Technical Specifications Task Force Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement)
- ML16343B008 + (Final Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (Tac No. MF3487))
- ML19325C434 + (Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2)
- ML19176A191 + (Final Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 1))
- ML25119A290 + (Final Safety Evaluation of Traveler Tstf-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators)
- ML25195A103 + (Final Safety Evaluation of X-Energy LLCs XE-100 Licensing Topical Report Mechanistic Source Term Approach Revision 3)
- ML25094A140 + (Final Safety Evaluation of XE-100 Licensing Topical Report Reactor Core Design Methods and Analysis Revision 2)
- ML061280315 + (Final Safety Evaluation on Joint Owners Group Program on Motor-Operated Valve Periodic Verification)
- ML25148A362 + (Final Safety Evaluation to the LRA for Perry Nuclear Power Plant Unit 1)
- ML25062A234 + (Final Safety Evaluation to the SLRA of Virgil C. Summer Nuclear Station, Unit 1, Revision 1)
- ML25021A228 + (Final Safety Evaluation to the SLRA of Virgil C. Summer Nuclear Station, Unit 1)
- ML19176A188 + (Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition)
- ML18065B095 + (Final Scenario,1996 Palisades Emergency Exercise)
- ML053480118 + (Final Scenarios)
- ML22003A075 + (Final Scope of Work and Budget for Calendar Year 2021)
- ML23047A408 + (Final Screen Shots for Foreign Travel Reporting)
- ML14273A259 + (Final Screening and Prioritization Results for Cooper Nuclear Station Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident)
- ML24155A087 + (Final Script Verbal Authorization 1RR06)
- ML041750160 + (Final Section B Operating)
- ML042190301 + (Final Section B Operating)
- ML033160298 + (Final Section B Operating)
- ML033100054 + (Final Section B Operating)
- ML041190221 + (Final Section B Operating (RO & SRO))
- ML042750525 + (Final Section B Operating (RO & SRO) (Folder 3))
- ML041730197 + (Final Section B Operating for Salem, Units 1 and 2)
- ML041750183 + (Final Section C Operating)
- ML042190312 + (Final Section C Operating)
- ML040060065 + (Final Section C Operating)
- ML033100055 + (Final Section C Operating)
- ML032880234 + (Final Section C Operating)
- ML033140118 + (Final Section C Operating)
- ML041190228 + (Final Section C Operating (RO & SRO))
- ML042750526 + (Final Section C Operating (RO & SRO) (Folder 3))
- ML041730201 + (Final Section C Operating for Salem, Units 1 and 2)
- ML040150167 + (Final Section a Administrative Operating Topics)
- ML041750153 + (Final Section a Operating)
- ML033100051 + (Final Section a Operating)
- ML042190271 + (Final Section a Operating)
- ML041400380 + (Final Section a Operating)
- ML033160296 + (Final Section a Operating)
- ML041190213 + (Final Section a Operating (RO & SRO))
- ML042750524 + (Final Section a Operating (RO & SRO) (Folder 3))
- ML041730191 + (Final Section a Operating for Salem, Units 1 and 2)
- IR 05000483/2022404 + (Final Security Baseline Inspection Report 05000483/2022404 (Letter))
- ML20002A039 + (Final Seep Monitoring Evaluation Report, Mexican Hat, Utah, Umtrca Title I Disposal Site, December 2019)
- ML17306A379 + (Final Seismic Hazard Evaluation for Palo Verde Nuclear Generating Station,Wintersburg,Az)
- ML19310A285 + (Final Seismic Response Spectra,Joseph M Farley Nuclear Units 1 & 2,AL Power Co,Containment & Internal Structure)
- ML14035A351 + (Final Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- ML13017A475 + (Final Seismic Walkdown Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- GO2-13-117, Final Seismic Walkdown Summary Report + (Final Seismic Walkdown Summary Report)
- ML22341A080 + (Final Set 2 Request for Additional Information – EPRI Report 3002018337, Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recaptutopical Report)
- ML24023A418 + (Final Sierra Club - Dwm Initial Opening Brief)
- ML100130212 + (Final Signed Waste Shipment Record)