MONTHYEARTSTF-24-01, Transmittal of TSTF-599, Revision 0, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators2024-03-0404 March 2024 Transmittal of TSTF-599, Revision 0, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators Project stage: Request ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter Project stage: Acceptance Review ML25051A2252025-04-15015 April 2025 Licensee Event Reports: Loss of Offsite Power (LOOP) Events That Resulted in Simultaneous Diesel Generator (DG) Starts 1/1/2000 Through 8/29/2021 to Support TSTF-599 Project stage: Other ML25044A2442025-04-15015 April 2025 Draft Traveler SE of TSTF-599, Rev 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators Project stage: Draft Other ML25119A2872025-05-0505 May 2025 Cover Letter for Final SE of Traveler TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators Project stage: Approval ML25119A2882025-05-0505 May 2025 Final SE of Traveler TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators Project stage: Approval 2024-04-24
[Table View] |