ML033100054

From kanterella
Jump to navigation Jump to search
Final Section B Operating
ML033100054
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/03/2003
From: Gosekamp M
Entergy Nuclear Vermont Yankee
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-271/03-301
Download: ML033100054 (80)


Text

.. Form ES-301-2 ES-301 Control Room/ln-Plant Systems

-Outline Facility: Vermont Yankee Date of Examination: 10/3/03 Exam Level (circle one): / SRO(I) / SRO(U) Operating Test No.: 1 11 M Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

Type Safety System / JPM Title Code* Function 1 a. Perform Weekly Operable Control Rod Check (Stuck Rod)

(20107F) 1 1 b. Parallel Main Generator to Grid (24507) ID, L, S 4

c. RPV venting via the MSIVs (20043) D, s 3
d. Bypass Reactor Building HVAC Trips (20041) D, c 5 I e. Transfer MCC 89A from the Maintenance Tie to RUPS (26209) D, S 6 I f. Core Spray Pump Surveillance (20901F) 2
g. Initiate Manual Scram (OE 3107 Appendix F) (20023F) M, S, A 7 h.

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i. Place Standby CRD FCV in Service 1 (Loss of CRD Regulating Function) (20106)
j. Respond to High Service Water Strainer D/P (27601) D 8
k. Startup RPS Motor Generator (21202F) D, A 7
  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

.. Form ES-301-2 ES-301 Control Room/ln-Plant Systems

-0 utIine Facility: Vermont Yankee Date of Examination: 10/3/03 Exam Level (circle one): / SRO(I) / SRO(U) Operating Test No.: 1 W Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

I System / JPM Title

a. Perform Weekly Operable Control Rod Check (Stuck Rod) 1 (20107F) 1 b. Parallel Main Generator to Grid (24507) 4 I c. RPV venting via the MSlVs (20043) D, S 3
d. Bypass Reactor Building HVAC Trips (20041) 5
e. Transfer MCC 89A from the Maintenance Tie to RUPS (26209)
f. Core Spray Pump Surveillance (20901F) 2
g. Initiate Manual Scram (OE 3107 Appendix F) (20023F) 7 I h. Swap SJAE Suction Valves (516) (27106)

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 9

i. Place Standby CRD FCV in Service 1 (Loss of CRD Regulating Function) (20106)
j. Respond to High Service Water Strainer D/P (27601) D l 8
k. Startup RPS Motor Generator (21202F)
  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

JPM-20107F Rev. 5, 09/03 Page 1 of 9 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task ldentification:

Title:

Perform Weekly Operable Control Rod Check Failure Mode: Stuck Control Rod

Reference:

OP-4111 Control Rod Drive Svstem Surveillance Task Number: 201 0020201 Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Method of Testing: Simulation __ Performance X Discuss Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Reviewed by:

Approved by:

Date

JPM-20107F Rev. 5, 09/03 Page 2 of 9 Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him t o ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task ? 'I Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are t o perform the actions.

You are requested t o "talk throuqh" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions: Normal Rx operation, 9 0 % power. The previous crew started the Weekly Operable Control Rod Check.

lnitiatina Cues: The CRS directs you t o complete the Weekly Operable Control Rod Check per OP 41 11 on control rods 06-1 5 and 18-03 which were not previously done.

Task Standards: Rod 06-1 5 and 18-03 satisfactorily cycled.

Required Materials: OP-41 1 1 Control Rod Drive System Surveillance VYOPF 41 11.02 ON 31 4 3 Stuck Control Rod Simulator Setup: IC-20 ERFlS Printer ON, Preinsert MALFUNCTION RD021803. Ensure CRD flows are in the Green Band Reduce Reactor power t o 90% with recirc flow RE stated no control rod blocks are expected Drive water pressure adjusted to 250 psig Mark rods 06-15 and 18-03 with asterisks on VYOPF 41 11.02

JPM-20107F Rev. 5, 09/03 Page 3 of 9 Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure OP-4111 and review admin limits, precautions and prerequisites reviewed.

Standard: OP-41 11 obtained section A, admin limits, precautions and prerequisites reviewed.

Interim Cue: Prerequisites are complete.

SATNNSAT Step 2: Verify RBM channels are operable.

Standard: No rod blocks, verifies detector bypass lights out when rods are selected.

SATNNSAT Step 3: Demand and print control rod positions display (CRD) t o document initial control rod position.

Standard: Select "CRD" display on ERFIS, ensure printer is on, and print display.

Interim Cue: The operator does not need t o wait for printout t o continue surveillance. When asked, no rod sequence exchange is planned.

SATNNSAT *Step 4: Select rod 06-15.

Standard: Energize rod select power, depress rod select pushbutton for 06-1 5.

SATNNSAT Step 5: Verify rod 06-15 selected.

Standard: Verify rod select pushbutton for rod 06-1 5 is illuminated.

SAT/U NSAT Step 6: Verify no adjacent control rod t o rod 06-15 is presently at position 46.

Standard: Verify rods 06-1 1, 10-1 1, 10-15, 10-1 9, 06-1 9, and 02-1 9 are not at position 46 using full core display or ERFIS printout.

JPM-20107F Rev. 5, 09/03 Page 4 of 9 Evaluation Performance Steps SATlUNSAT *Step 7: Drive rod 06-15 t o position 46.

Standard: Momentarily place rod movement control switch t o the "Rod in position .

SATNNSAT *Step 8: Verify rod 06-15 position decreases t o position 46.

Standard: Verify rod 06-15 position is at 46 using full core or 4 rod position display on CRP 9-5.

SATlU NSAT *Step 9: Withdraw rod 06-15 t o position 48.

Standard: Momentarily place rod movement control switch t o the "rod out notch" position.

SATlUNSAT Step I O : Ensure rod 06-15 is at position 48.

Standard: Verify rod 06-15 position is at 48 using full core or 4 rod display on CRP 9-5.

SAT/UNSAT Step 1 1 : Performs coupling check when control rod is at position 48.

Standard: Out notch override and notch out 3-5 seconds.

Check alarm typer-cup check SAT SATlUNSAT *Step 12: Initial VYOPF 41 11.02 for rod 06-15.

Standard: Initials recorded on form for rod 06-15.

SATlUNSAT *Step 13: Select rod 18-03 at least 2-3 seconds after settle light extinguis hes.

Standard: > 2-3 seconds after settle light extinguishes depress rod select pushbutton for 06-1 5. (OP 4 1 1 1, Precaution 8)

SATlUNSAT Step 14: Verify rod 18-03 selected.

Standard: Verify rod select pushbutton for 18-03-is illuminated.

JPM-20107F Rev. 5, 09/03 Page 5 of 9 SATNNSAT Step 15: Verifv no adjacent control rod to rod 18-03 is presentlv at position 46.

Standard: Verify rods 22-03, 22-07, 18-07, and 14-07 are not a t position 4 6 using full core display or ERFIS printout.

SAT/UNSAT *Step 16: Attempt to drive rod 18-03 to position 4 6 .

Standard: Momentarily place rod movement control switch t o "rod in" position.

SATNNSAT *Step 17: Recognize failure of rod 18-03 to move to position 46.

Standard: Observe rod 18-03 at position 48 on full core or 4 rod display.

SATNNSAT Step 18: Inform Control Room Supervisor of 18-03 failure to move.

Standard: Control Room Supervisor informed.

Interim Cue: CRS acknowledges your report, has entered ON 3 1 4 3 and will direct your actions for rod 18-03 which is stuck.

Interim Cue: CRS directs you t o confirm no rod block panel alarms are present on CRP 9-5 alarms5- D-2, 5-D-6, 5-D-7, 5-M-7, 5-N-1, and 5-N-2.

SAT/U NSAT Step 20: Verifv no rod block exists.

Standard: Verify no rod block in by observing annunciators 5-D-2, 5-D-6, 5-D-7, 5-M-7, 5-M-8, 5-N-1, 5-N-2 clear.

SAT/UNSAT Step 2 1 : Report no rod block exists.

Standard: CRO reports t o CRS no rod blocks are present.

Interim Cue: CRS directs you t o attempt a one notch insert and withdraw of rod 18-03 observing drive flow, drive pressure, and settle

JPM-20107F Rev. 5, 09/03 Page 6 of 9 SAT/UNSAT *Step 21: Attempt a one notch insert and withdrawal of rod 18-03 observing drive flow, drive pressure, settle,drive in, and drive out lights liahts.

Standard: Momentarily place rod movement control switch t o "rod in" then "rod out" position and verify on CRP 9-5:

Drive pressure, DPI-3-303, normal (green band)

Drive flow, FI-3-310, less than normal Settle, drive in, drive out lights sequence normally SAT/UNSAT Step 22: Report to CRS all conditions are normal except drive flow was observed to be low.

Interim Cue: CRS acknowledges your report and directs you t o increase drive water DP in I O -

5 0 psig, not exceed 3 5 0 psig drive water D/P.

SATAJNSAT *Step 23: Raise drive water DP bv 10 to 50 psim Standard: Adjust CRD-PCV-20 on CRP 9-5 t o raise drive water DP by 10 t o 5 0 psig as indicated on DPI-3-303.

Note: Operator may refer t o OP 21 1 1 section A step I1 or because of ON entry he may perform this step from memory NOTE: REMOVE MALFUNCTION RD020615 AT THIS TIME (PRIOR TO NEXT STEP).

SAT/UNSAT *Step 24: Attempt to insert rod 18-03 one notch.

Standard: Momentarily place rod movement control switch t o "rod in" position.

Note: If drive water pressure is raised too much the control rod will double or triple notch and the mispositioned control rod procedure will also be entered if required.

JPM-20107F Rev. 5, 0 9 / 0 3 Page 7 of 9 SAT/UNSAT Step 25: Verify rod 18-03 at position 46.

Standard: Observe rod 18-03 at position 4 6 by full core or 4 rod display and report t o CRS.

Interim Cue: CRS acknowledges your report and directs you t o return rod 18-03 t o position 48.

SAT/UNSAT Step 26: Return rod 18-03 to position 48.

Standard: Momentarily place rod movement control switch t o "rod out" position.

SAT/U NSAT Step 27: Verify rod 18-03 at position 48.

Standard: Observe rod 06-1 5 at position 48 by full core or 4 rod display and report t o CRS.

Interim Cue: CRS acknowledges your report and directs you t o exercise rod 18-03 t o position 46 and back t o position 48 t w o times.

SAT/U NSAT Step 28: Exercise rod 18-03 To position 46 and back to position 48.

Standard: Repeat steps 24, 25, ,26, and 27 above.

SAT/UNSAT Step 29: Exercise rod 18-03 To position 46 and back to position 48.

Standard: Repeat steps 24, 25, ,26, and 27 above.

Report t o the CRS that rod 18-03 has been exercised t o position 46 twice and is at position 48

JPM-20107F Rev. 5, 09/03 Page 8 of 9 Evaluation Performance Steps Interim Cue: The CRS acknowledges your report and directs you t o return drive water D/P t o 2 5 0 t o 275 psid.

SAT/UNSAT Step 30: Return drive water DP to normal.

Standard: Adjust CRD-PCV-20 t o lower drive water DP t o 2 5 0 t o 275 psid. (Green band on DPI-3-303.) and report t o CRS Interim Cue: The CRS acknowledges you report and directs you t o exercise rod 18-03 t o position 4 6 and back t o position 4 8 t w o times a t normal drive water D/P.

SAT/UNSAT Step 29: Exercise rod 18-03 two times at normal drive water D/P.

Standard: Repeat step 24,25,26, and 27 above.

Interim Cue: When operator desires t o continue surveillance, advise that no further action's required for this JPM.

TIME FINISH:

Terminating Cue: Rod 06-1 5 and 18-03 successfully exercised.

Evaluators Comments:

JPM-20107F Rev. 5, 09/03 Page 9 of 9 System: 201003 K/A's: A2.01 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM ;and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR:41.5 / 45.6)

Stuck rod R03.4 SRO 3.6 System Generic K/A's:

Rev. 5, 09/03 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions: Normal Rx operation, 90% power. The previous crew started the Weekly Operable Control Rod Check.

Initiating Cues: The CRS directs you t o complete the Weekly Operable Control Rod Check per OP 41 11 on control rods 06-1 5 and 18-03 which were not previously done.

JPM 24507 Rev. 2,09103 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Synchronize Turbine Generator With Output Grid At Min. Load Failure Mode: N/A

Reference:

OP 0 105, Reactor Operations Task Number: 2450050101 Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes - No Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

JPM 24507 Rev. 2,09/03 Page 2 of 6 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "DOyou understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Plant startup is underway. Turbine is operating at 1800 RPM. The generator acceleration relay is reset.

Initiatinp Cues:

CRS directs you to synchronize turbine generator to grid and load it to approximately 20% per OP 0105, Section 3.C.

Task Standards:

Turbine generator is synchronized to grid at minimum load.

Required Materials:

OP 0105, Reactor Operations Completed VYOPF 0 105.05 up to and including Phase 3B Simulator Setup:

IC-7, reset the Acceleration Relay/Scram.

I .

JPM 24507 Rev. 2,09/03 Page 3 of 6 Evaluation Performance Steps TIME START:

NOTE: All actions performed on CRP 9-7 unless otherwise indicated.

SAT/UNSAT Step 1: Obtain Procedure OP 0105.

Standard: OP 0105 obtained, Phase 3 admin limits and precautions reviewed.

~

Interim Cue: Provide operator with completed VYOPF 0105.05.

SATPUNSAT Step 2: Check OPEN the exciter field breaker.

Standard: Operator observes exciter field breaker green light ON and red light OFF.

SATPUNSAT Step 3: Check voltage regulator transfer control is in MANUAL position.

Standard: Operator observes voltage regulator transfer control is positioned to MANUAL.

SATPUNSAT Step 4: Check that the exciter is in minimum volts position by lowering DC voltage until the LOWER white light is energized.

Standard: Operator observes LOWER white light ON.

SATPUNSAT *Step 5: Close the exciter field breaker.

Standard: Operator positions exciter field breaker hand switch to CLOSE.

Operator observes exciter field breaker red light on, green light off SATPUNSAT Step 6: With the voltage regulator in MANUAL, brinp the Generator Stator voltage from minimum (approximately 20,000 volts) to rated value of approximately 22,000 volts by going to Raise with the manual DC control switch on EI-9-7-8.

Standard: Operator verifies voltage regulator in MANUAL and then positions Manual DC Control (DC voltage adjust) switch to RAISE until generator stator voltage is approximately 22,000 volts as indicated on EI-9-7-8.

SATPUNSAT Standard: Operator positions the AC Voltage Adjust switch to null the regulator transfer indication on EI-9-7-12.

SATPUNSAT Step 8: b. Switch the Voltage Regulator Transfer switch to AUTO.

Standard: Operator positions the Voltage Regulator Transfer switch to AUTO.

JPM 24507 Rev. 2,09/03 Page 4 of 6 SATAJNSAT Step 9: Null the deviation between the AC and DC regulators using: the DC voltage adiust switch and the Voltage Regulator Mismatch meter.

Standard: Operator positions the DC Voltage Adjust switch to null the AC and DC regulators as observed on the Voltage Regulator Mismatch meter EI-9 12.

SATAJNSAT Step 10 Prepare to svnchronize by coordinating with VELCO and performing the Switching and Tagging Order as follows:.

Standard: Operator contacts VELCO and requests permission to open BKR 8 1- 1T, BKR- 1T, close T1-MOD, and place reclosure switches to OFF, Interim Cue: Inform Operator that switching order has been issued as requested.

SATPUNSAT *Step 11 Place reclosure switches to OFF for 81-1T and lT, Open BKR 81-1T Open BKR-1T

. Close T1-MOD Standard: Operator performs the following:

calls the A 0 to position 8 1- 1T and 1T reclosure switches to OFF

- positions BKR 8 1- 1T and BKR- 1T hand switches to OPEN and verifies breaker green lights on and red lights off

- positionsTlMOD handswitch to CLOSE, and verifies MOD green light off and red light on Interim Cue: When asked, inform operator the reclosure switches are OFF. A 0 reports local visual observation of breakers as requested.

SATAJNSAT *Step 12: Place breaker switch in synchroscope socket and turn the synchroscope on.

Standard: Operator places breaker switch in synchroscope socket and turns the synchroscope to ON. Verifies the meter begins to rotate slowly.

SATAJNSAT *Step 13: Load the generator as follows:

a. Adiust Penerator output voltage (incoming) to be equal to or slightlv higher than line voltage (running), using the AC voltage adiust switch.

Standard: Operator positions AC Voltage Adjust switch to adjust incoming generator output voltage to be equal to or slightly higher than line voltage by comparing the voltage meters on either side of the synchroscope.

SATKJNSAT *Sten 14: b. Adiust the turbine generator speed so that the synchroscope needle is moving slowlv in the FAST direction.

Standard: Operator intermittently positions Speed Load Changer to either RAISE or LOWER to maintain the synchroscope needle moving slowly in the FAST direction.

JPM 24507 Rev. 2,09103 Page 5 of 6 SATKJNSAT *Step 15: When the synchroscope is between 5 minutes to 12 and 12 oclock, close BKR 81-1T.

Standard: Operator observes synchroscope needle rotating slowly in fast direction and when needle position is between 5 minutes to 12 and 12 oclock, operator positions breaker 8 1-1T hand switch to CLOSE.

Operator verifies breaker 81-1T red light on and green light off.

SATAJNSAT *Step 16: Immediately pickup 25-50 MWE on the Penerator by going to RAISE on the speed load changer.

Standard: Operator immediately positions Speed Load Changer hand switch to RAISE until megawatts indicates 25 -50 MWE on meter 9-7-7.

SAT/UNSAT Step 17: When BKR 81-1T is closed and generator is at desired load, synchronize and close BKR-1T.

Standard: Operator observes synchroscope needle not rotating and positions breaker 1-1T hand switch to CLOSE and observes breaker red light ON and green light OFF.

SATPUNSAT Step 18: Turn synchroscope off and remove breaker switch from socket.

Standard: Operator positions synchroscope to OFF and removes breaker switch from socket.

SATRJNSAT Step 19: Per VELCO, place reclosure switch for 1T to INST and 81-1T to SYNC CK.

Standard: Contact A 0 in switchyard to place 1T in INST and 8 1-1T to SYNC CK.

~~~

Interim Cue: A 0 reports switches in INST and SYNC CK.

SATNNSAT Step 20: If exhaust hood temperatures are > 125 F. remain at 25 to 50 MWE to allow the exhaust hoods to cool below 125 F (time required may be about 5 minutes).

Standard: Operator maintains load at 25-50 MWE until exhaust hoods temperature drops to below 125°F as indicated on Recorder 110-2 Interim Cue: When operator checks temperature, Inform him that exhaust hoods temperature are below 125°F.

JPM 24507 Rev. 2,09/03 Page 6 of 6

  • Critical Step TIME FINISH:

Terminating Cue: The Turbine generator is synchronized to grid at approximately 20% load.

Evaluators Comments:

System: 245000 KIA's: A4.02 Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

A4.02 Generator controls RO 3.1 SRO 2.9 A4.05 Generator megawatt output R02.7 SR02.7 A4.06 Turbine speed RO 2.7 SR02.6 Generic: WA's:

Rev. 2,09/03 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

Plant startup is underway. Turbine is operating at 1800 RPM. The generator acceleration relay is reset.

Initiating Cues:

CRS directs you to synchronize turbine generator to grid and load it to approximately 20% per OP 0105, Section 3.C.

JPM-20043 Rev. 4, 09/03 Page 1 of 7 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task ldentification:

Title:

RPV Venting via MSlVs

Reference:

OE 3107 Appendix CC Task Number: N/A Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Method of Testing: Simulation __ Performance X Discuss Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Tr Reviewed by:

Approved by:

Date

JPM-20043 Rev. 4, 09/03 Page 2 of 7 Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him t o ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are t o perform the actions.

You are requested t o "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions: A plant transient has occurred and the crew has entered EOP 5.

RPV/ED. SRVs C,B, & D have failed t o open. MSIV's are shut.

Initiating Cues: The SM directs you t o perform RPV/ED defeating interlocks using the MSlVs per OE 3107 Appendix CC. The TSC concurs with this action.

Task Standards: MSlVs in one steam line open and the reactor is being vented through a turbine bypass valve.

Required Materials: OE 3107 Appendix CC Simulator Setup: Any IC.

Insert malfunction RP03, spurious Group I isolation, then remove.

Backup the Group's isolation.

Insert malfunctions to simulate a very slow depressurization through 1 SRV AD-03 A,B,C,D AD-06 A,B,C,D AD-01 A at 50% Simulator operator t o adjust t o maintain reactor pressure 800 t o 1000 pisg and slowly lowering. If the operator is slow, make the leak smaller, if fast this value should be just right.

JPM-20043 Rev. 4, 09/03 Page 3 of 7 Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure OE 3 1 0 7 Appendix CC and review prerequisites.

Standard: Operator obtains procedure and reviews prerequisites.

Interim Cue: All prerequisites are met. The operator will go to the EOP tool box in the back of the simulator control room and get the 6 jumpers with banana plugs, screw driver, and electrical tape .

SATlUNSAT Step 2: Verify closed MS-80A, B, C, D.

Standard: On CRP 9-3 verify closed by, Green light ON Red light OFF, the following valves:

MSIV-80A MS IV-80B MSIV-80C MSIV-80D SATNNSAT Step 3: Verify closed MS-86A. B, C, D.

Standard: On CRP 9-3 verify closed by, Green light ON Red light OFF, the following valves:

MSIV-86A MSIV-86B MSIV-86C MSIV-86D SATlU NSAT Step 4: Verify closed RV-39.

Standard: On CRP 9-4 check closed RV-39 Green light ON and Red light OFF.

SATAJNSAT Step 5: Verify closed RV-40.

Standard: On CRP 9-4 check closed RV-40 Green light ON and Red light OFF.

JPM-20043 Rev. 4, 09/03 Page 4 of 7 SAT/UNSAT Step 6: Verifv closed MS-74.

Standard: On CRP 9-3 check closed MS-74 Green light ON and Red light OFF.

SAT/UNSAT Step 7: Verifv closed MS-77.

Standard: On CRP 9-4 check closed MS-77 Green light ON and Red light OFF.

SAT/UNSAT Step 8: Verifv closed MS-79.

Standard: On CRP 9-4 check closed MS-79 Green light ON and Red light OFF.

AT/UNSAT Step 9: Verifv closed MS-78.

Standard: On CRP 9-4 check closed MS-78 Green light ON and Red light OFF.

SAT/UNSAT *Step IO: Defeat PClS Group 1 isolation interlocks for MS-74.

Standard: Lift and tape lead AA-3 in CRP 9-1 5 and install jumper from A A - I 3 t o AA-24 in CRP 9-1 7.

SAT/UNSAT *Step 11: Defeat PClS Group 1 isolation interlocks for MS-77.

Standard: Lift and tape lead DD-15 in CRP 9-1 5 and install jumper from DD-34 t o DD-40 in CRP 9-1 7.

SATlU NSAT *Step 12: Defeat PClS Group 1 isolation interlocks for MS-80A,B,C,D.

Standard: Install jumpers from AA-20 t o AA-23 and BB-20 t o BB-23 in CRP 9-41 SAT/UNSAT *Step 13: Defeat PClS Group 1 isolation interlocks for MS-86A,B,C,D.

Standard: Install jumpers from AA-20 t o AA-23 and BB-20 t o BB-23 in CRP 9-42

JPM-20043 Rev. 4, 0 9 / 0 3 Page 5 of 7 Evaluation Performance Steps SAT/UNSAT *Step 14: Open one of the outboard isolation valves, MS-86A,B,C,D.

Standard: On CRP 9-3 Position ONE of the following control switches t o OPEN:

MSlV 86A MSlV 86B MSlV 86C MSlV 86D SAT/UNSAT Step 15: Verifv steam line drain valve MS-79 is CLOSED.

Standard: Verify on CRP 9-3 MS-79 CLOSED by Green light ON and Red light OFF.

SAT/UNSAT *Step 16: Open MS-74.

Standard: Position control switch for MS-74 t o OPEN on CRP 9-3.

SAT/UNSAT Step 17: Verifv OPEN MS-74.

Standard: On CRP 9-3 verify MS-74 OPEN by Red light ON and Green light OFF.

SAT/UNSAT *Step 18: Open MS-77.

Standard: Position control switch for MS-77 t o OPEN on CRP 9-3.

SAT/UNSAT Step 19: Verifv OPEN MS-77.

Standard: On CRP 9-3 verify MS-77 OPEN by Red light ON and Green light OFF.

~

Note: When MS-77 is opened main steam line pressure will begin increasing SAT/UNSAT Step 20: Raise MPR/EPR set points t o prevent bypass valve opening.

Standard: If main steam line pressure is >920 psig or any bypass valve is open the operator goes t o raise on the EPR and MPR pressure control setpoint adjust switches on CRP-9-7 until all bypass valves are shut.

JPM-20043 Rev. 4, 09/03 Page 6 of 7 Evaluation Performance Steps SATNNSAT Step 21 : OPEN MS-78.

Standard: On CRP 9-3 operator positions MS 7 8 control switch t o open.

SAT/UNSAT Step 22: Verify OPEN MS-78.

Standard: On CRP 9-3 operator verifies MS-78 OPEN by Red light ON and Green light OFF.

SATNNSAT Step 23: Verify Rx pressure and steam line pressure within 50 psiq of each other.

Standard: A t CRP 9-7, using PI-101-2 main steam pressure and at CRP 9-5 using PI-2-3-56A or 2-3-56B, operator verifies upstream and downstream steam pressures are within 5 0 psid.

Note: The operator may need t o increase EPR/MPR setpoint t o prevent opening, BPVs in this step.

SAT/UNSAT *Step 24: Open the inboard MSlV in the same line as the open outboard MSIV.

Standard: Position the inboard MSlV control switch on CRP 9-4 to OPEN in the same line as opened in Step 14.

MSlV 80A MSlV 80B MSlV 80C MSlV 80D SAT/UNSAT Step 25: Verify OPEN MS-80A, B, C, D in the same line as the open outboard MSIV.

Standard: On CPR 9-4 verify open by, Red light ON Green light OFF, the MSlV in Step 22:

MS IV-80A MSIV-80B MSIV-80C MSIV-80D

JPM-20043 Rev. 4, 09/03 Page 7 of 7 Evaluation Performance Steps SAT/UNSAT Step 26: If MTS 2 is tripped THEN attemDt to reset MTS 2.

Standard: MTS 2 is the low condenser vacuum trip on CRP 9-7 Vacuum is still better than the trip setpoint, no action is required.

SAT/UNSAT *Step 27: OPEN a bypass valve as necessary to vent the RPV.

Standard: On the CRP 9-7 operate BPOJ control switch t o the raise position until BPVs start open.

SAT/UNSAT Step 28: Verify BPV OPEN Standard: Verify BPV # I green light and red light ON a t CRP 9-7 and BPV # I position indicator on CRP 9-7 indicates open.

TIME FINISH:

Terminating Cue: MSlVs open in one line and the reactor being vented through the turbine bypass valves.

Evaluators Comments:

System: 239001 K/A's: K1.06, K3.09, K4.01, K4.07, A I .08,A2.03

Rev.4, 09/03 Page 1 of 1 Initial Conditions: A plant transient has occurred and the crew has entered EOP 5.

RPV/ED. SRVs C,B, & D have failed to open. MSIVs are shut.

Initiating Cues: The SM directs you t o perform RPV/ED defeating interlocks using the MSlVs per OE 3107 Appendix CC. The TSC concurs with this action.

JPM-20041 Rev. 5, 09/03 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Bypassing Reactor Building Non-Rad HVAC Trips

Reference:

OE 31 07 Appendix AA, Rev 15 Task Number: N/A Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes - No 2 Time Critical: Yes __ No 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation __ Performance 2 Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL __ Time Required:

dP/L?

Date

JPM-20041 Rev. 5, 09/03 Page 2 of 6 Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him t o ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are t o perform the actions.

You are requested t o "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions: A primary system break has occurred in the Reactor Building and the CRS has entered EOP-4 on high temperature. Reactor Building HVAC has tripped on low Reactor water level.

lnitiatinn Cues: The Control Room Supervisor directs you t o bypass RB HVAC trips and restart RB HVAC per OE 3107 Appendix AA.

Task Standards: RB HVAC trips bypassed and RB HVAC running.

Required Materials: OE 3107 Appendix AA Simulator Setup: Works with OE 3107 App F, JPM 20023F

JPM-20041 Rev. 5, 09/03 Page 3 of 6 Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure OE 3107 Appendix AA Standard: OE 31 07 Appendix AA, obtained.

Interim Cue: I f asked inform the operator that power is available t o RB HVAC. Operator may confirm power available at CR 9-25 SAT/UNSAT Step 2: Obtain Jumpers.

Standard: Operator obtains 2 jumpers with banana plugs from the EOP tool box in the Control Room.

J PM-2004 1 Rev. 5, 09/03 Page 4 of 6 SATNNSAT *Step 3: Place Group 111 Isolation Valves to Close..

Standard: Operator places control switches that are in the open position to close.

CRP 9-3 CRP 9-26 AC-8, DRYWELL PURGE HVAC-9, RB VENT SUPPLY AC-7A, DRYWELL VENT HVAC-IO, RB VENT SUPPLY AC-6A, DRYWELL 3" VENT HVAC-12, RB VENT EXHAUST AC-20, N2 MAKE-UP HVAC-11, RB VENT EXHAUST AC-IO, TORUS PURGE RB supplylexhaust fans off RSF-1A off REF-1A O f f RSF-1B off REF-I B O f f CRP 9-25 SBGT REF-2A on REF-2B on AC-7B, TORUS VENT CRP 9-47 AC-GB, TORUS 3" VENT VG-26, CAM SUPPLY INBD AC-9, AIR PURGE SUPPLY VG-76A, CAM RETURN INBD AC-22B, DRYWELL MAKE-UP VG-23, CAM SUPPLY OUTBD SGT-6, VENT TO SBGT VG-76B, CAM RETURN OUTBD AC-23, N2 PURGE SUPPLY AC-7, VENT TO RTF-5 CAD Panel "A" AC-22A, TORUS MAKE-UP NG I I A , 12A. 13A CA-38A, CTMT COMPR SUCT VG 22A, 9A CA-38B, CTMT COMPR SUCT

JPM-20041 Rev. 5, 09/03 Page 5 of 6 SATIUNSAT Step 4: Ensure the Reset Permissive Lights Are Lit.

Standard: On CRP 9-5, operator checks Group Ill Sys I and Sys 2 red Reset Permissive Lights are ON (lower right section of vertical panel).

Interim Cue: Permissive lights are lit.

SAT/UNSAT *Step 5 : Install Jumpers.

Standard: Operator installs the following jumpers:

- CRP 9-15: EE6 t o EE9

- CRP 9-17: BBIO t o BBI 1 SAT/UNSAT *Step 6: Reset the PClS Logic When the Signal has CLeared.

Standard: On CRP 9-5 (upper right section of benchboard), operator positions System Is01 Reset Switch t o INBD and then OUTBD.

Interim Cue: Reset switch moves t o the INBD position, OUTBD position and then returns t o normal.

SAT/UNSAT *Step 7: Open Reactor Building Ventilation Isolation Valves.(OP 21 92 step C)

Standard: On CRP 9-26, operator places the following control switches t o OPEN:

HVAC-9 HVAC-11 HVAC-10 HVAC-12 SATAJNSAT Step 8: Verify Reactor Building Ventilation Isolation Valves are Open.

Standard: ON CRP 9-26, operator verifies red light ON and Green light OFF for each Reactor Building Ventilation Isolation Valve.

Interim Cue: If the A 0 is dispatched t o start reactor building ventilation before HVAC 9,10,1 1,I2 are opened, he should request they are positionedherified open. OP 21 9 2 section C.1 .a. (Simulator operator acting as AO)

JPM-20041 Rev. 5, 09/03 Page 6 of 6 Note: Step 7 and Step 8 actions will likely be done simultaneously.

SAT/UNSAT Step 9: Start Reactor Building HVAC system per OP 2192.

Standard: Direct A 0 t o start RB HVAC per OP 2192.

Interim Cue: Direct booth operator t o restart Reactor Building ventilation. Inform the operator that the A 0 has started RB HVAC per OP 2192 and Standby Gas Treatment will be secured by another operator.

TIME FINISH:

Terminating Cue: Appendix AA implemented, HVAC trips bypassed HVAC-9, I O , 1 1,12 OPEN, and RB HVAC started.

Evaluators Comments:

System: 2 9 5 0 3 2 EA1.03 Ability to operate and/or monitor the following as they apply to HIGH SECONDARY CONTAINMENT AREA TEMPERATURE :

(CFR: 41.7 / 45.6)

Secondary containment ventilation. RO 3.7 SRO 3.7 System Generic K/A's:

Rev.5, 09/03 Page 1 of 1 Initial Conditions: A primary system break has occurred in the Reactor Building and the CRS has entered EOP-4 on high temperature. Reactor Building HVAC has tripped on low Reactor water level.

lnitiatinn Cues: The Control Room Supervisor directs you t o bypass RB HVAC trips and restart RB HVAC per OE 3107 Appendix AA.

JPM 26209 Rev. 2,09/03 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Transfer MCC-89A Power From The Maintenance Tie To RUPS Failure Mode: N/A

Reference:

OP 2143,480 And Lower Voltage AC System (Except Vital, Inst. AC, And Lighting Panels), Rev 42 Task Number: 2627320101 Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes X No -

Time Critical: Yes - No Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Date Reviewed by:

SRO Licens-&Certified Reviewer Approved by:

Date

  • . JPM 26209 Rev. 2,09103 Page 2 of 6 Directions: Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any YJnsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "DOyou understand the task?"

Read to the Derson being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

MCC-89A is powered from the maintenance tie.

Initiating Cues:

The CRS directs you to transfer MCC-89A power from the maintenance tie to RUPS and startup UPS 1A IAW OP 2143 Section K.

Task Standards:

Transfer of MCC-89 power from the maintenance tie to the RUPS is complete.

Required Materials:

OP 2143 Simulator Setup:

Any IC, MCC-89A, powered from maintenance tie. Check following IDAs:

Place MCC 89A on Main Tie Shutdown UPS Verify:

EDR 05 CLOSE EDR 07 CLOSE EDR 10 CLOSE EDR 11 OPEN

JPM 26209 Rev. 2,09/03 Page 3 of 6 Evaluation Performance Steps TIME START:

SATNNSAT Step 1: Obtain Procedure OP 2143, review Admin Limits and Precautions and proceeds to section K.

Standard: OP 2143 obtained, admin limits and precautions reviewed.

Interim Cue: The reactor building is accessible.

SATNNSAT *Step 2: At MCC-89A open the FEED from MCC 9B maintenance tie breaker.

Standard: Operator directs an A 0 (Simulator operator) to open feed from MCC 9B maintenance tie breaker.

Interim Cue: Direct booth operator to take EDR 07 to open Maintenance Tie breaker at MCC-89A is open SAT/UNSAT Step 3: Lock closed control cabinet door.

Standard: Operator directs an A 0 to shut control cabinet door and lock door for feed from MCC 9B.

Interim Cue: MCC-89A control cabinet is shut and locked.

No booth operator actions SATNNSAT *Step 4: At MCC-89A close the feed from UPS-1A output tie breaker.

Standard: Operator directs an A 0 (Simulator operator) to position UPS-1A feed switch at MCC-89A to CLOSED Interim Cue: Direct booth operator to take EDR 11 to close The feed from UPS-1A output tie breaker at MCC-89A is closed.

Note: Completion of task will require transition to Procedure Steps D4 and D5. JPM Steps 2 and 4 were previously completed.

JPM 26209 Rev. 2,09/03 Page 4 of 6 Evaluation Performance Steps SATNNSAT Step 5: Position UPS A control switch on CRP 9-3 to OFF for approximately one second then release it.

Standard: Operator positions UPS A control switch to OFF for approximatelyone second then releases it on CRP 9-3.

SATWNSAT SteD 6: If ECCS signal is present, position the UPS feeder trip kevlock switch on CRP 9-32 to BLOCK.

Standard: Operator verifies an ECCS signal is NOT PRESENT. No action required.

SATIUNSAT Step 7:At Bus-9 close the UPS-1A supplv breaker.

Standard: Operator directs an A 0 at Bus-9 to position the UPS- 1A supply breaker hand switch to CLOSE.

Interim Cue: Direct booth operator to verify EDR 10 is closed UPS-1A supply breaker is shut at Bus 9 SATNNSAT Step 7a: At MCC-89A open the FEED from MCC 9B maintenance tie breaker.

Standard: This step previously completed.

SATNNSAT Step 7b: Lock closed control cabinet door.

Standard: This step previously completed SAT/UNSAT Step 7c: At MCC-89A close the feed from UPS-1A output tie breaker.

Standard: This step previously completed SATNNSAT Step 8: Verify UPS 1A local control cabinet breakers closed.

Standard: Operator directs A 0 to verify the following breakers closed on UPS 1A control cabinet:

- Input AC Circuit Breaker

- Output AC Circuit Breaker

- DC Circuit Breaker Interim Cue: All local control cabinet breakers at the UPS control cabinate are closed.

JPM 26209 Rev. 2,09103 Page 5 of 6

~

Interim Cue: If operator asks the UPS will be started from the control room.

SATNNSAT *Step 9: Position UPS-1A control selector switch on CRP 9-3 to ON for approximately one second and then release it.

Standard: Operator positions UPS A control switch to ON for approximately one second and then releases it on CRP 9-3.

Interim Cue: If asked, CRS directs the CRP 9-3 switch be used.

Evaluation Performance Steps SATAJNSAT Step 10: Monitor UPS for unusual conditions, such as excessive noise or vibration, as it starts and comes UP to speed.

Standard: Operator directs an A 0 to monitor UPS for unusual conditions as it starts and comes up to speed.

Interim Cue: Inform operator that UPS is running SAT.

SATAJNSAT Step 11: Verifv MCC-89A bus voltage 435 to 506 VAC from CRP 9-3.

Standard: Operator verifies MCC-89A bus voltage is approximately480 VAC by observing MCC-89A volt meter on CFW 9-3.

SATNNSAT Step 12: Once UPS MG is up to speed and producing rated voltage, locally press the FAILURE RESET pushbutton on the UPS control panel to reset the TFR relav and clear all remaining alarm conditions.

Standard: Operator directs A 0 to press FAILURE RESET pushbutton on local UPS control panel.

JPM 26209 Rev. 2,09/03 Page 6 of 6 TIME FINISH:

Terminating Cue: Transfer of MCC-89 power from the maintenance tie to the RUPS is complete.

Evaluators Comments:

~ ~

System: 2622002 WA's: A4.01 Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

Transfer from alternative source to preferred source RO 2.8 SRO 3.1

Rev. 2,09103 Page 1 of 1 Student Handout Initial Conditions:

MCC-89A is powered from the maintenance tie.

Initiatine Cues:

The CRS directs you to transfer MCC-89A power from the maintenance tie to RUPS and startup UPS 1A IAW OP 2143 Section K.

P M - 20901F Rev. 1,09/03 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Perform Core Spray "A" Quarterly Full Flow Test Failure Mode: Minimum Flow Valve Fails Shut

Reference:

OP 4123, Core Spray System Surveillance, Rev. 34 Task Number: 2090010201 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom __ Simulator X Plant -

Performance Expected Completion Time: 24 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

JPM- 20901F Rev. 1,09/03 Page 2 of 5 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "DOyou understand the task?"

Read to the person beine evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk-through"the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is operating at power during normal operations.

InitiatinP Cues:

You have been directed by the CRS to perform the Core Spray Quarterly Full Flow Test on the "A" Core Spray Pump.

Task Standards:

"A"Core Spray Quarterly Full Flow Test performed satisfactorily.

Required Materials:

OP 4123, Core Spray System Surveillance (latest revision)

Form VYOPF 4123.01 (latest revision) with Steps 1 & 2 data filled in Simulator Setup:

0 Any at power IC 0 Run Event Trigger CS JPM ET, CS JPM SCN. This event trigger will cause the Minimum Flow Valve (CS-SA) to stroke shut once the Core Spray "A" control switch is taken to START.

0 Ensure Reactor feed pumps A & C are running

JPM- 20901F Rev. 1,09/03 Page 3 of 5 Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure, review administrative limits, precautions and pre-requisites Standard: OP 4123 Section A obtained, administrative limits, precautions, and prerequisites reviewed

~

Interim Cue: If asked, inform operator that prerequisites are done.

SATLJNSAT Step 2: Notify RP of test gauge installation and core spray full flow test.

Standard: Rp notified SAT/UNSAT Step 3: Install safety class temporary test pauges on A Core Spray suction and discharge piping, fill and vent the system, system walkdown and dedicated operator for PCIS valves IAW Step C.2.

Standard: Operator directs that temporary test gauges be installed and verified LAW procedure Step C.2.

Interim Cue: Inform Operator that Step C.2 is completed and:

S/N- VY-1 Suction Pressure Test Gauge 12/1/-3 calibration due date S/N- VY-2 Discharge Pressure Test Gauge 12/1/03 calibration due date The "A" Core Spray System is filled and vented The "A" Core Spray piping and component inspection is complete A dedicated operator is stationed for CS-806A and CS-807A SAT/UNSAT Step 4: Prompt CRS to declare Core Sprav Subsystem "A" inoperable, and to enter either LCO 3.5.A.2 or 3.5.A.6 Standard: Operator prompts CRS to declare Core Spray "A"inop, and to enter 3.5.A.2 Interim Cue: As CRS, acknowledge prompt to declare Core Spray "A" inop and to enter 3.5.A.2.

JPM- 20901F Rev. 1,09/03 Page 4 of 5 SATRJNSAT *Step 5: Start Core Spray Pump "A" Standard: Operator places Core Spray Pump "A" hand switch to START on CRP 9-3 horizontal panel, and observes red light On, green light Off above pump start switch.

SAT/UNSAT Step 6: Verify Core Spray Pump "A" running Standard: Operator identifies Red light On, Green light Off above Core Spray Pump "A"control switch.

SAT/UNSAT Step 7: Verify Minimum Flow Valve CS-SA remains open Standard: Operator identifies CS-SA stroked shut on pump start and reports to CRS.

Interim Cue: If informed as the CRS that the CS-SA valve has failed shut, acknowledge the report.

SATRJNSAT

Standard: Operator secures pump by taking Core Spray "A" hand switch to STOP.

If the operator has not secured the pump and checks RRU operation, this step in UNSAT.

SAT/UNSAT Step 9: Verify Core Spray Pump "A" secured.

Standard: Operator verifies pump secured by observation of green light ON, red light OFF, on CRP 9-3 and/or zero pump amps.

JPM- 20901F Rev. 1,09/03 Page 5 of 5 TIME FINISH:

Terminating Cue: "A"Core Spray Pump secured after starting once it is noted that the Minimum Flow Valve fails shut.

Evaluator Comments:

System:209001 WA's: A2.02 Ability to (a) predict the impacts of the following on the LOW PRESSURE CORE SPRAY SYSTEM ;and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR: 41.5 / 45.6)

Valve closures RO 3.2 SRO 3.2 Generic WA's:

Rev. 1,09/03 Page 1 of 1 Student Handout Initial Conditions:

The plant is operating at power during normal operations.

Initiating Cues:

You have been directed by the CRS to perform the Core Spray Quarterly Full Flow Test on the "A" Core Spray Pump.

JPM- 20023F Rev. 7,09103 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Initiate a Manual Scram (OE 3 107 Appendix F)

Failure Mode: RPS Can Not be Reset

Reference:

OE 3 107 Appendix F, Initiation of a Manual Scram (Rev. 15)

Task Number: 2000200501 Task Performance: AO/RO/SRO __ RO/SRO Only X SE Only -

Sequence Critical: Yes - No Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 12 minutes Evaluation Results:

Performance: PASS - FAIL- Time Required:

Prepared by:

Reviewed by:

Approved by:

ertified Reviewer datiohraining Superintendent

  • Date Date

JPM- 200231; Rev. 7,09/03 Page 2 of 6 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "DOyou understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

A hydraulic ATWS has occurred, and reactor power remains above 2%. EOP-2 has been entered and is being used to control plant parameters. ADS has been inhibited. RPS and ARI/RPT have been initiated.

Initiating Cues:

The CRS has directed you to implement OE 3107 Appendix F (Initiation of a Manual Scram).

Task Standards:

Inward rod motion achieved by inserting a manual scram at CRP 9-5.

Required Materials:

0 OE 3 107 Appendix F, Initiation of Manual Scram (latest revision)

Four long alligator clip jumpers 0 Flathead screwdriver 0 Electrical tape

JPM- 20023F Rev. 7, 09/03 Page 3 of 6 Simulator Setup:

0 Any full-power IC 0 Insert mfRI-12A and mfRD-12B at 87% - Hydraulic ATWS 0 Insert rnfNM-06A7 B, C, and D - AJ?RM INOPS 0 Inhibit ADS 0 Initiate ARVRPT 0 Depress PB-1 on FWLC master controller

JPM- 20023F Rev. 7, 09/03 Page 4 of 6 Evaluation Performance Steps TIME START:

SATIUNSAT Step 1: Obtain procedure and review prerequisites, obtains tools from EOP Tool Box.

Standard: Procedure obtained; pre-requisites reviewed and verified, tools obtained.

SATIUNSAT Step 2: If plant conditions allow, reset the SCRAM Standard: Identify that plant conditions do NOT allow reset of the scram.

SATIUNSAT Step 3: If plant conditions allow, reset ARI/RPT Standard: Operator resets ARI/RPT by depressing the ARVRPT reset pushbuttons at CRP 9-4.

SATKJNSAT Step 4: If reactor pressure is less than 500 psig, then openlcheck open CRD 56, CRD charging water header supply Standard: Operator recognizes reactor pressure is >500 psig and does not perform step.

SATIUNSAT *Step 5: Install the following jumpers at CRP 9-15 RelayIPost # to RelayIPost #

SA-K1OA 1 2 + SA-K11E 1 4 SA-K1OC 1 2 + SA-K11G 1 4 Standard: Jumper alligator clips attached to terminal posts as indicated above Note: OE 3 107 Appendix Figure 1 provided for reference as Attachment A to this JPM

JPM- 20023F Rev. 7,09/03 Page 5 of 6 SATKJNSAT *Step 6: Install the following: iumpers at CRP 9-17 Relay/Post # to Relay/Post #

SA-K1OB / 2 + SA-K11F / 4 SA-K1OD / 2 + SA-K11H / 4 Standard: Jumper alligator clips attached to terminal posts as indicated above SATKJNSAT *Step 7: Reset the Scram Standard: Operator resets the scram by taking the Scram Reset switch at CRP 9-5 to position 2/3 + 1/4 RESET SATKJNSAT Step 8: Confirm or reset ARI/RPT lopic trips Standard: Operator confirms that ARVRPT logic trips are reset by observing ARVRPT annunciators NOT in alarm.

SATRJNSAT Step 9: Reset drift alarms Standard: Operator takes Control Rod Drift Reset switch at CRP 9-5 to RESET SAT/UNSAT Step 10: Open/confirm open CRD 32A/B, 33A/B/C/D Standard: Operator observes red lights on for six valves on lower right hand side of control room panel 9-5 bench board.

SATKJNSAT Step 11: Verify SDV-A and SDV-B are drained or draining by CRP 9-5 or local indication Standard: Operator observes open indication for SDV vent and drain valves Interim Cue: If A 0 contacted to verify local indications of SDV draining, inform Operator that the SDV is draining. If Operator intends to wait until the SDV is completely drained, wait approximately two minutes, then inform Operator as CRS to initiate manual scram.

SATKJNSAT *Step 12: Insert a manual scram Standard: Operator inserts a manual scram by depressing Manual Scram Pushbuttons A and B at CRP 9-5.

JPM- 20023F Rev. 7, 09/03 Page 6 of 6 SATRJNSAT Step 13: Observe inward rod movement and repeat steps 6 through 10 Standard: Operator recognizes inward rod motion and prepares to repeat steps 6 through 10.

Interim Cue: Once Operator identifies inward rod motion and indicates intention to repeat steps 6 through 10, inform Operator that no further actions are required for this JPM.

TIME FINISH:

Terminating Cue: Inward rod motion achieved by reset and initaion of manual scram.

Evaluator Comments:

System: 212000 A4.17 Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

Perform alternate reactivity/ shutdown operations .

Importance RO 4.1 SRO 4.1 System: 295039 EA1.01,.03 Ability to operate and/or monitor the following as they apply to SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN :

(CFR: 41.7 / 45.6)

Reactor Protection System RO4.6" SRO 4.6" ARI/RPT/ATWS: Plant-Specific RO 4.1" SRO 4.1*

System Generic WA's:

Rev. 7,09/03 Page 1 of 1 Tear-Out Sheet Initial Conditions:

A hydraulic ATWS has occurred, and reactor power remains above 2%. EOP-2 has been entered and is being used to control plant parameters. ADS has been inhibited. RE'S and ARVRPT have been initiated.

Initiating Cues:

The CRS has directed you to implement OE 3 107 Appendix F (Initiation of a Manual Scram).

JPM 27 106 Rev. 1,09/03 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Advance Off Gas System, OG-5 16 Valve Transfer.

Failure Mode:

Reference:

OP 2 150, Advanced Off Gas System And Air Evacuation Equipment Task Number: 2717190101 Task Performance: AO/RO/SRO - RO/SRO X SRO Only Sequence Critical: Yes - No X Time Critical: Yes- N o 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation- Performance X Discuss -

Setting: Classroom - S i m u l a t o r X Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

JPM 27 106 Rev. 1,09/03 Page 2 of 5 Directions: Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsatl' classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator DO you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Reactor is at 100% power.

Initiating Cues:

The CRS directs you to swap ejector suction pressure control from OG-5 16A to OG-5 16B per OP 2 150, Section Y.

Task Standards:

Ejector suction pressure control is successfully swapped from OG-5 16A to OG-5 16B.

Required Materials:

OP 2 150, Advanced Off Gas System And Air Evacuation Equipment Simulator Setup:

IC-19 (or any IC with OG-5 16A is service)

(Validated in IC-7. Works with Turbine Generator SAJ and RUPS 89A JPMs)

JPM 27 106 Rev. 1,09/03 Page 3 of 5 Evaluation Performance Steps TIME START:

Note: All Steps performed on CRP 9-6 unless otherwise noted.

SATKJNSAT Step 1: Obtain Procedure OP 2150 and review admin limits, precautions and prerequisites.

Standard: OP 2 150 obtained. Admin limits, precautions and prerequisites reviewed.

Interim Cue: Prerequisites SAT.

SATNNSAT Step 2: Verifv that the second stage eiector steam supp1v valve AS-FCV-2B is open.

Standard: Operator observes valve AS-FCV-2B red light ON and green light OFF.

SATNNSAT Step 3: Verifv that OG-516B is closed.

Standard: Operator observes OG-5 16B green light ON and red light OFF and OG-5 16B controller is set at 0% open.

SATNNSAT *Step 4: Open SJAE B first stage steam supplv valve AS-FCV-1B.

Standard: Operator positions AS-FCV-1B hand switch to OPEN and observes red light ON and green light OFF.

SATNNSAT Step 5: Note the valve position on OG-516A controller.

Standard: Operator notes the valve position on OG-5 16A controller on CRP 9-50.

SATKJNSAT Step 6: Close OG-516A.

Standard: Reduce display to 0 by pressing V or > and V Push SEI-, button on CRP 9-50 PC-OG- 1102A (Operator may use OP 2150 App E to assist him in controller operations)

SAT/UNSAT *Step 7: Place OG-516A control switch to CLOSE.

Standard: Operator positions OG-5 16A control switch to CLOSE.

JPM 27106 Rev. 1,09/03 Page 4 of 5 SATAJNSAT *Step 8: Place OG-516B control switch to OPEN.

Standard: Operator positions OG-5 16B control switch to OPEN.

SATAJNSAT *Step 9: Depress OG-516B RESET push-button.

Standard: Operator depresses OG-5 16B RESET push-button, PC-OG-5 16B, on CRP 9-50.

SATAJNSAT Step 10: Verify reset pushbutton light illuminates.

Standard: Operator verifies reset light for PCV-OG-5 16B, on CPR 9-50.

SATAJNSAT *Ster, 11: Slowlv open OG-516B and adiust so that valve position is equal to previous position of OG-516A.

Standard: Standard:Increase display to previous position of 5 16A value by pressing V or > and VPush SEL button on CRP 9-50 PC-OG-1102A (Operator may use OP 2150 App E to assist him in controller operations)

NOTE: This step may be performed incrementally to prevent excessive flows.

SATLJNSAT Step 12: Close SJAE first stage steam supply AS-FCV-1A.

Standard: Operator positions AS-FSV-1A hand switch to CLOSE and observes green light ON and red light OFF.

TIME FINISH:

Terminating Cue: Ejector suction pressure control is successfully swapped from OG-5 16A to OG-516B.

Evaluators Comments:

JPM 27 106 Rev. 1,09/03 Page 5 of 5 System: 271000 KIA's: A4.01,02,03,04,06,09 Ability to manually operate and/or monitor in the control room:

(CFR 41.7 / 45.5 to 45.8)

Reset system isolations RO 2.8 SR02.8 System flows RO 2.9 SRO 2.9 System temperatures RO 2.8 SR02.8 Condenser vacuum R03.4 SRO 3.5 System indicating lights and alarms RO 3.3 SRO 3.2 Offgas system controls/components RO 3.3 SR03.2

Rev. 1,09/03 Page 1 of 1 Student Handout Initial Conditions:

Reactor is at 100% power.

Initiating Cues:

The CRS directs you to swap ejector suction pressure control from OG-516A to OG-516B per OP 2150, Section Y.

JPM-20106 Rev. 11,09/03 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Place Standby CRD Flow Control Valve in Service

Reference:

ON 3145, Loss of CRD Regulating Function Task Number: 2007280501 Task Performance: AO/RO/SRO RO/SRO - SRO Only -

Sequence Critical: Yes - No Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss Setting: Classroom - Simulator - Plant 3 Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Approved by:

Ger&i&.6?Trainfng Superintendent Date

JPM-20 106 Rev. 11,09/03 Page 2 of 5 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsatl' classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "DOyou understand the task?"

Read to the person beiw evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk thr0ug.h" the procedure, stating the parameters you are verifylng or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Plant at power.

A mechanical failure of the "B" CRD flow control valve has occurred. ON 3 145 has been entered.

Initiating. Cues:

You are the in-plant operator. The CRS directs you to place the "A" CRD FCV in service in accordance with ON 3 145 Step 8.

Task Standards:

The Standby CRD flow control valve in service.

Reauired Materials:

ON 3145

JPM-20106 Rev. 11,09/03 Page 3 of 5 Evaluation Performance Steps TIME START:

SATKJNSAT Step 1: Obtain procedure ON 3145 Step 8 Standard: Procedure obtained, Step 8 reviewed.

~~

Interim Cue: If asked, the in service FCV has failed completely shut .

SATNNSAT Step 2: Shift CRD Flow Controller on CRP 9-5 to MANUAL & Close FCV-3-19B Standard: Operator requests Control Room Operator to shift the CRD Flow Controller to MANUAL and zero valve position FCV-3-19B Interim Cue: Inform Operator that the CRD Flow Controller has been shifted to MANUAL and FCV-3-19B controller output is zero.

SATKJNSAT Step 3: Close inlet and outlet valve to B CRD FCV.

Standard: CRD 68B and 69B valve handles rotated clockwise until valves full shut.

Interim Cue: Handles rotate freely clockwise, valve stems move inward until resistance is felt, and valve handle stops moving.

SATKJNSAT *Step 4: Select FCV to be placed in service at the Local Valve Selector switch.

Standard: Local Valve Selector switch located behind FCV 19A, and taken to FCV-3-19A Interim Cue: The switch handle rotates freely to the FCV-3-19A position.

PM-20 106 Rev. 11,09/03 Page 4 of 5 Evaluation Performance Steps SATKJNSAT *Step 5: Position local 3-way valve (CRD-126) to FCV to be placed in service.

Standard: CRD-126, located on panel behind CRD flow control valves taken to FCV-3-19A (Labled as 207A)

Interim Cue: Valve control knob rotates fieely until resistance is felt with the pointer at the FCV-3-19A position.

SAT/UNSAT *Step 6: Open inlet and outlet valve to Standby CRD FCV.

Standard: CRD-68A and 69A handles rotated counter-clockwise until full open.

Interim Cue: Valve handles rotate freely counter-clockwise and valve stems move outward until resistance is felt and handle stops moving.

SAT/UNSAT Step 7: Notify Control Room to readiust CRD Parameters at CFW 9-5.

Standard: Operator calls Control Room to inform them the alternate FCV has been placed in service and to adjust CRD parameters.

Interim Cue: When operator desires to contact the Control Room, inform him that CRD parameters have been adjusted. If asked, charging header pressure on PI-3-234 is 1450 psig.

Jl'M-20106 Rev. 11,09/03 Page 5 of 5 TIME FINISH:

Terminating Cue: The Standby CRD FCV is placed in service.

Evaluators Comments:

System: WA's: 201001 A2.02 Ability to (a) predict the impacts of the following on the CONTROL ROD DRIVE HYDRAULIC SYSTEM ;and @) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

(CFR: 41.5 / 45.6)

Valveclosures RO 3.2 SRO 3.3 Generic WA's:

Rev. 11,09/03 Page 1 of 1 Student Handout Initial Conditions:

Plant at power.

A mechanical failure of the B CRD flow control valve has occurred. ON 3 145 has been entered.

Initiatine Cues:

You are the in-plant operator. The CRS directs you to place the A CRD FCV in service in accordance with ON 3145 Step 8.

JPM - 27601 1 .

Rev. 2, 09/03 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET

Title:

Respond to Hi SW Strainer AP Failure Mode: N/A

Reference:

Alarm Response Sheet 6-A-6 Task Number: 2767040104 Task Performance: AO/RO/SRO - RO/SRO - SRO Only A 0 Only X Sequence Critical: Yes - No Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: SimulationX Performance - Discuss -

Setting: Classroom - Simulator - Plant 3 Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by: &A? Date Reviewed by:

Approved by: 4

  • inten@t Operations Training Date

JPM - 27601 Rev. 2,09/03 Page 2 of 5 Directions: Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or YJnsat". Comments are required for any YJnsatl' classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate the actions.

You are requested to "talk throuah" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions: Normal Rx operation, 90% power. Alarm 6-A-6, SERV WTR STRN A AP HI, has actuated Initiating Cues: The CRS directs you to respond to the "A" SW high AP alarm using Alarm Response Sheet 6-A-6 Task Standards: SW strainer "A" bypass valve is throttled open and the strainer is in continuous backwash.

Required Materials: Alarm Response Sheet 6-A-6 SERV WTR STRN A AP HI

JPM - 27601 Rev. 2,09/03 Page 3 of 5 Evaluation Performance Steps TIME START:

NOTE: All actions are performed at the intake structure unless otherwise indicated.

SAT/UNSAT Step 1: Obtain Alarm Response Sheet 6-A-6.

Standard: ARS 6-A-6 obtained and reviewed.

SATIUNSAT Step 2: Check SW pressure to ensure system demands are satisfied.

Standard: Operator asks RO to check SW discharge pressure gauge and determine if pressure is satisfactory.

Interim Cue: SW header pressure reads slightly below NORMAL but system demands are currently being met.

SATIUNSAT Step 3: Check local AP indication.

Standard: Operator checks local AP gauge at intake structure, DP1-104-36A.

Interim Cue: Inform operator it reads 9 psid.

SATIUNSAT *Step 4: Place the strainer in continuous backwash Standard: Operator places "A" SW strainer in "continuous".

Interim Cue: Local control switch is in continuous.

JPM - 27601 Rev. 2,09103 Page 4 of 5 Interim Cue: If asked after the strainer is continuously backwashing the D/P remains high.

Evaluation Performance Steps SAT/UNSAT *Step 5: Flush strainer through the drain.

Standard: Operator flushes strainer through the drain by opening valve SP70-1AX.

Interim Cue: Valve turns in counter-clockwise direction until resistance is felt.

Interim Cue: If asked after the strainer drain valve SP70-1AX is opened the D P remains high.

SATKJNSAT *Step 6: Crack open strainer bypass valve.

Standard: Operator cracks open strainer "A"bypass valve, V70- 14B.

Interim Cue: Handwheel turns in the counter-clockwise direction.

SATKJNSAT Step 7: Refer to ON 3148, Loss of Service Water Standard: Operator informs CRS to refer to ON 3148.

Interim Cue: Acknowledge direction.

JPM - 27601 Rev. 2, 09/03 Page 5 of 5 TIME FINISH:

Terminating Cue: Strainer A bypass valve is cracked open and strainer is in continuous backwash.

Evaluators Comments:

System: 295018 WA's: AA1.03 Ability to operate and or monitor the following as they apply to a partial or complete loss of component cooling water Affected systems so as to isolate damaged portions (CFR: 41.7 / 45.6)

RO 3.3 SRO 3.4

Rev. 2, 09/03 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions: Normal Rx operation, 90% power. Alarm 6-A-6, SERV WTR STRN A AP HI, has actuated Initiating Cues: The CRS directs you to respond to the "A" SW high AP alarm using Alarm Response Sheet 6-A-6

JPM-2 1202F Rev. 8,09/03 Page 1 o f 7 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Startup the "A" RPS MG Set Failure Mode: Failure of Output Voltage to Reach 120 VAC

Reference:

OP 2 134, "Reactor Protection Svstem,"

Task Number: 2127040104 Task Performance: AO/RO/SRO - RO/SRO - SRO Only - A 0 Only X Sequence Critical: Yes - No Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss -

Setting: Classroom - Simulator - Plant 3 Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL __ Time Required:

JPM-21202F Rev. 8,09/03 Page 2 of 7 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning perfonnance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "DOyou understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifjmg or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

0 The "A"RPS MG set is being returned to service after brush replacement.

0 There is an Operator waiting in the Control Room to assist you.

0 Maintenance is not available to assist you.

Initiating: Cues:

The CRS directs you to startup the "A" RPS MG set per OP 2134 Section A. Inform the CRS when the MG set is ready to be placed in service.

Task Standards:

0 "A" RPS M/G Set running, producing 118rtl volts.

0 "A"W S M/G Set output breaker shut.

0 Power Panels A-1 and A-2 breakers shut.

Required Materials:

OP 2134, "Reactor Protection System" (latest revision)

JPM-2 1202F Rev. 8, 09/03 Page 3 of 7 Evaluation Performance Steps TIME START:

SATKJNSAT Step 1: Obtain Procedure, review administrative limits, precautions and prerequisites Standard: OP 21 34 obtained, administrative limits, precautions and prerequisites reviewed.

Interim Cue: If asked, all prerequisites have been met.

SATKJNSAT Step 2: At CRP 9-15:

a. RPS "A" Bus NormaYAlt selector switch in either ALT or OFF
b. "A" system power supply circuit breaker SA-CB1A is ON C. The two scram test switches channels AUA2 test 5A-S2A/C are positioned to normal Standard : Contacts Control Room and verifies that all switches and breakers are properly positioned Interim Cue: When requested, inform Operator that OP 2134 Section A step 1 has been verified.

The "A" RPS bus power select switch on CRP 9-15 is in the OFF position SATKJNSAT Step 3: Ensure That Power is Available to the M/G Set From MCC-8A Standard: Contacts Control Room and requests verification that power is available to the M/G Set fiom MCC-SA.

Operator may go to the switchgear room and locally verify MCC SA RPS power available.

Interim Cue: When requested, inform Operator that power is available to RPS M/G set "A" SATKJNSAT Step 4: Ensure M/G Set Generator Output Breaker on the local panel is OFF (MG 3-1A)

Standard: Checks position of MG Output Breaker, observes breaker in the OFF (Down) position Interim Cue: When checked, inform Operator that breaker is in the OFF (Down) position.

JPM-2 1202F Rev. 8,09/03 Page 4 of 7 Evaluation Performance Steps SATPUNSAT Step 5: Ensure the Circuit Breakers on RPS Power Protection Panels A1 and A2 are OFF Standard: Checks position of the RPS Power Protection Panel breakers, observes breakers in the OFF (Down) position Interim Cue: When checked, inform Operator that breakers are in the OFF (Down) position.

SAT/UNSAT *Step 6: Depress the Motor ON Pushbutton on local control panel to start the drive motor Standard: Simulates starting the "A" RPS MG Set by depressing the Motor ON pushbutton. Verifies that "Motor On" red light is ON, and that MG Set is starting and coming up to speed Interim Cue: When simulated, inform Operator that the pushbutton has been depressed and the "Motor On" red light is ON. The MG Set has started and is coming up to speed.

SATPUNSAT Step 7: When the M/G Set is at Operating Speed Check the Output Voltage is 118 f 1Volt Standard: Checks MG Set output voltage on local panel "A-C Volts" meter after MG Set reaches normal operating speed Interim Cue: When checked, inform Operator that output voltage indication has not increased and presently indicates 0 volts.

SAT/UNSAT *Step 8: If the Output Voltape Does not Approach 118 f 1, Depress "Motor On" Pushbutton Again to Reset the Voltape Remlator Standard: Operator depresses the "Motor On" pushbutton a second time Interim Cue: Inform the operator that output voltage is now 116 volts.

SATWNSAT "Step 9: Adjust OutDut voltage Adjust Knob to Achieve f 118 Volts Standard: Operator rotates the Voltage Adjust knob in the clockwise direction to raise IWG output voltage

JPM-21202F Rev. 8,09/03 Page 5 of 7 Evaluation Performance Steps Interim Cue: As the Operator rotates the Voltage Adjust Knob inform the Operator that output voltage is now indicating 118 volts.

SAT/UNSAT *Step 10: Close the M/G Set Generator Output Breaker Standard: Simulates positioning the output breaker to the CLOSED (Up) position

~~

Interim Cue: When simulated, inform Operator that the breaker is in the CLOSED (Up) position.

SATNNSAT Step 11: If Maintenance is available check M/G Output of 118 +/- 1volts as read on the line side of the molded case breaker in the RPS Power Protection Panel PPP-A-1 as read using a portable calibrated meter Standard: Not Applicable Given in Initial Conditions Interim Cue: If asked Maintenance is not available SATNNSAT Step 12: At the RPS Power Protection Panel PPP-A-1 perform the following.

a. Verify POWER I N Lamp is ON
b.
  • Position Panel Output Breaker to OFF ( t o reset it)
c.
  • Protection Panel Output Breaker to ON (to re-energize it)
d. Check that the POWER OUT lamp on RPS Protection Panel PPP-A-1 is LIT Standard: a. Checks "Power In, Motor Gen" red light ON on Panel A-1
b. Simulates placing breaker in OFF
c. Simulates placing breaker in ON
d. Checks that the POWER OUT lamp on PPP-A-1 is LIT

JPM-21202F Rev. 8,09/03 Page 6 of 7 Evaluation Performance Steps Interim Cue: When checked, inform Operator that:

a. Power In, Motor Gen" red light ON
b. When simulated placing breaker in OFF, inform Operator that breaker is in the OFF (Down)position
c. When simulates placing breaker in ON, inform Operator that breaker is in the ON (Up) position
d. When checked, inform Operator that the POWER OUT lamp on PPP-A-1 is LIT.

SATIUNSAT Step 13: At RPS Power Protection Panel PPP-A-2 Derform the following

a. Verifv POWER IN lamp is ON
b.
  • Position Panel Output Breaker to OFF (to reset it)

C.

  • Position Panel Breaker to ON (to re-energize it)
d. Check that the POWER OUT lamp on Protection Panel PPP-A-2 is LIT Standard:
a. Checks "Power In" light is ON
b. Simulates placing breaker to the OFF position C. Simulates placing breaker to the ON position
d. When simulated, inform Operator that breaker is in the ON (Up) position
e. Checks that the POWER OUT lamp on PPP-A-1 is LIT Interim Cue: When checked, inform Operator that the:
a. The "Power In" lamp on is ON
b. The breaker is in the OFF position
c. The breaker is in the ON Position
d. The POWER OUT lamp on PPP-A-2 is LIT

JPM-2 1202F Rev. 8, 09/03 Page 7 of 7 Interim Cue: If asked the RPS A bus power supply selector switch on CRP 9-15 is still in the off position. (The A FWS bus is not on the alternate power supply)

Evaluation Performance Steps SATNNSAT Step 14: Inform CRS that the A RPS MG Set is ready to be placed in service Standard: Makes report to CRS

____ ~~

Interim Cue: Acknowledge report as CRS, and inform Operator that another operator will place the MG Set in service TIME FINISH:

Terminating Cue: A RPS MG Set started and ready to be placed in service (through Step A.12 of OP 2134)

Evaluators Comments:

2Izooo Systemfil.01 Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including:

(CFR: 41.5 / 45.5)

RPS motor-generator output voltage RO 2.8* SRO 2.9 System Generic WAs:

Rev. 11,09/03 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

0 The "A" RPS MG set is being returned to service after brush replacement.

0 There is an Operator waiting in the Control Room to assist you.

0 Maintenance is not available to assist you Initiating Cues:

The CRS directs you to startup the "A"RPS MG set per OP 2134 Section A. Inform the CRS when the MG set is ready to be placed in service.