Text

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility: SUSQUEHANNA Date of Examination: 8/09-8/13 2004 Exam Level (circle one): RO Operating Test No.: N/A Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

System / JPM Title Type Safety Code* Function 202002 A2.05 3.1/3.1 D, A, S 1 64.OP.007.151Reset the Fluid Drive Scoop Tube Lock (OP-164-001) 261000 A3.01 3.2i3.3 9 Perform a Manual Startup of the SGTS in Accordance With OP-070-001 264000 A4.04 3.713.7 6 Manually Synchronize Diesel Generator Ato 4.16KV Bus I A from Panel OC653 in Accordance With OP-024-001 295028 EA1.03 3.9/3.9 7 Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions) 295037 EA1. I 1 3.543.6 5 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-001) 259001 A2.07 3.713.8 2 Perform Switching Feedwater Level Control 45.OP.013.151 (OP-145-001) 295018 AA1.03 3.3/3.4 N, A, s 8 Place Standby RBCCW Pump In Service IAW OP-114-001 (Pump casing drain line leak develops) 206000 A4.13 4.1/4.0 D, E, A, S 4 Recovery from a Manual Closure of HPCl Isolation Valves With an Initiation Signal Present With a Steam Leak Developing. (OP-152-001)

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 212000 A I .01 2.8/2.9 E M, R, A 7 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 201002 K1.06 3.2/3.3 EIA, M 1 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator,

-l (L)ow-Power, (R)CA, (E/A)Emergency/Abnormal, (E)SF NUREG-1021, Draft Rev 9 Susquehanna Facsimile 2004 NRC Exam A s Given

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility: SUSQUEHANNA Date of Examination: 8/09-8/13 2004 1 Exam Level (circle one): SR0-I Operating Test No.: N/A System / JPM Title Type Safety Code* Function 202002 A2.05 3.V3.1 I 64.OP.007.151 Reset the Fluid Drive Scoop Tube Lock (OP-I 64-001) 261000 A3.01 3.213.3 9 Perform a Manual Startup of the SGTS in Accordance With OP-070-001

~~

264000 A4.04 3.7/3.7 6 Manually Synchronize Diesel Generator "A" to 4.1 6KV Bus 1A from Panel OC653 in Accordance With OP-024-001 295028 EA1.03 3.9/3.9 7 Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions) 295037 EA1. I 1 3.5/3.6 5 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-001) 295018 AA1.03 3.313.4 8 Place Standby RBCCW Pump In Service IAW OP-I 14-001 (Pump casing drain line leak develops)

~

206000 A4.13 4.114.0 D, E, A, S 4 Recovery from a Manual Closure of HPCl Isolation Valves With an initiation Signal Present With a Steam Leak Developing. (OP-152-001)

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 M 6 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 212000 A I .01 2.8/2.9 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 I I 201002 K1.06 3.2/3.3 E/A, M 1 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA, (E/A)Emergency/Abnormal, (E)SF NUREG-1021, Draft Rev 9 Susquehanna Facsimile 2004 NRC Exam As Given

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility: SUSQUEHANNA Date of Examination: 8/09-8/13 2004 I) Exam Level (circle one): SRO-U Operating Test No.: N/A Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

~

System / JPM Title Type Safety Code* Function 261000 A3.01 3.2/3.3 9 Perform a Manual Startup of the SGTS in Accordance With OP-070-001 295037 EA1. I 1 3.93.6 5 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-001)

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 M 6 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 212000 A I .01 2.8/2.9 E M, R, A 7 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 E/A, M 1 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L )ow-Power, (R)CA, (E/A)Emergency/Abnormal, (E)S F NUREG-1021, Draft Rev 9 Susquehanna Facsimile 2004 NRC Exam As Given

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE

--- APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 64.0P.007.151 I 02/11/04 202002 A2.05 3.1/3.1 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Reset A Fluid Drive Scoop Tube Lock IAW OP-I 64-001 Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 10 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory EvaIuat ion :

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9/93)

Page 1 of 1 File No. A14-56 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SIR0 64.0P.007.151

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 64-001, Reactor Recirculation System (Revision 38)

III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

34 Reset Recirculation Scoop Tube Lock L

IV. TASK CONDITIONS A. The plant is in Mode I@ 95 % power.

B. Scoop Tube Lock has occurred on B Recirc MG Set.

C. The condition which caused the Scoop Tube Lock has been corrected.

D. Manual Control has NOT been taken at the positioner V. INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

VI. TASK STANDARD B Recirculation MG Scoop Tube Lock is reset, then re-locked when speed is determined to be increasing rapidly.

VII. TASK SAFETY SIGNIFICANCE Potential Unanticipated positive reactivity addition 2004 NRC Exam As Given

r (

PERFORMAN& CHECKLIST Page 3 of 8 Appl. To/JPM No.: 64.0P.007.151 Student Name:

lstep Action Standard Eva1 Comments EVALUATOR NOTE:

Establish task conditions as directed on attached setup instructions.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

0 When student is ready to begin JPM, place the simulator in RUN.

Simulator Setup Select any MODE 1 100% IC.

0 Place Simulator in RUN 0 Manually runback recirc flow to achieve 95%

power 0 Run batch file RRB.STLBJPM.

0 Depress BReactor Recirc Controller INCREASE pushbutton to ensure controller is saturated.

  • Critical Step #Critical Sequence STCPUA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(,

PERFORMANL, CHECKLIST Page4of8 '

Appl. To/JPM No.: 64.0P.007.151 Student Name:

Step Action Standard Eva1 Comments Simulator Operator During this JPM you will be required to ROLE play as the in plant NPO at the scoop tube positioner.

Select Recirc Screen RR6.

0 Monitor Tachometer Generator Speed 3 - 14032B AND 0 Servo Controller Demand XI-14032B.

As NPO, direct student to change demand until signals are matched.

Obtain a controlled copy of OP-164-001, Reactor Controlled copy obtained.

Recirculation System Select the correct section to perform. Selects section 2.6 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

Review all precautions. Follows all precautions as applicable.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: 64.0P.007.151 Student Name:

Step Action Standard Eva1 Comments ENSURE Reactor Recirculation Pump B Speed Verifies:

Controller SY-B31-1R621B is in MANUAL Reactor Recirculation Pump B Speed Controller SY-B31-1R621B AMBER MANUAL light LIT OBSERVE White indicator light above Scoop Tube B Verifies:

LOCK OR RESET HS-B31-1S03B pushbutton White indicator light above Scoop Tube ILLUMINATED B LOCK OR RESET HS-B31-1S03B pushbutton LIT REMOVE the enclosure cover from the amplifier at Contacts in plant NPO and directs 1CB137B and ESTABLISH communication between removal of enclosure cover and the Control Room and the scoop tube positioner / Establishes communication between amplifier. the Control Room and the scoop tube positioner / amplifier.

EVALUATOR CUE:

Role-play as NPO at scoop tube positioner, report that enclosure cover is removed.

4Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Page 6 of 8

(

PERFORMAN& CHECKLIST Appl. To/JPM No.: 64.0P.007.151 Student Name:

~~

Step Action Standard Comments Restoration Of Scoop Tube Lock Without Having Communicates with in plant NPO, and Taken Manual Control At Positioner adjusts SY-B31-1R621B controller output with the INCREASE and If the scoop tube lockout condition is being reset DECREASE pushbuttons until signals without having taken manual (i.e. hand crank) control match at the positioner 1S I 37B, perform the following steps:

MATCH the controller demand and scoop tube position signals as displayed at 1CB137B on the amplifier digital display (see Attachment B), by increasing or decreasing controller SY-B3 -1R621B output.

EVALUATOR NOTE:

PlCSY group display STDP 83 may be us1 d to help match speeds BOOTH CUE:

0 ROLE play as NPO at scoop tube positioner.

0 Monitor Tach Generator Speed SI-14032B and Servo Controller Demand XI-140328.

0 Direct student to change demand until signals are matched.

%Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

I PERFORMAN& CHECKLIST Page 7 of 8 Appl. To/JPM No.: 64.0P.007.151 Student Name:

Step Action Standard Eva1 Comments FAULT STATEMENT RRP B WILL EXPERIENCE AN UNCONTROLLED SPEED INCREASE AFTER THE SCOOP TUBE LOCK IS RESET.

  • 9 DEPRESS SCOOP TUBE B LOCK OR RESET Depresses and holds for 4-5 seconds HS-B31-1S03B RESET push button 4 to 5 seconds Scoop Tube B Lock Reset pushbutton (to allow position amplifier timer to clear and reset HS-B31-1S03B.

logic to seal in).

IO MONITOR GEN 1B SPEED SI-14032B. Checks:

GEN 1B SPEED SI-14032B Determines speed is rapidly increasing

  • I1 If speed increases rapidly, TRIP scoop tube on Depresses SCOOP TUBE LOCK OR affected generator by depressing SCOOP TUBE RESET HS-B31-1S03B TRIP push LOCK OR RESET HS-B3I-lS03B TRIP push button. button.

Verifies:

GEN 1B SPEED SI-14032B stops rising 12 Notify Shift Supervision. Informs Shift Supervision that RRP B has been locked due to uncontrolled speed increase.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i (

PERFORMANLL CHECKLIST Page 8 of 8 Appl. ToIJPM No.: 64.0P.007.151 Student Name:

Step Action Standard Eva1 Comments 13 At 1C137B REPLACE the cover on the scoop tube Contacts in plant NPO and directs position amplifier. replacing enclosure cover.

EVALUATOR CUE:

That completes this JPM

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS L-A. The plant is in Mode 1 @ 95 YO power.

B. Scoop Tube Lock has occurred on IB Recirc MG Set.

C. The condition which caused the Scoop Tube Lock has been corrected.

D. Manual Control has NOT been taken at the positioner INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS L'

A. The plant is in Mode 1 @ 95 % power.

B. Scoop Tube Lock has occurred on 'B' Recirc MG Set.

C. The condition which caused the Scoop Tube Lock has been corrected.

D. Manual Control has NOT been taken at the positioner INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

2004 NRC Exam As Given 2of2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 70.0P.004.151 0 1/ I 6/04 261000 A3.01 3.2/3.3 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. K/A Task

Title:

Perform a Manual Startup of the SGTS in Accordance With OP-070-001 Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Ap provaI:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 10 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

\--

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 File No. A14-56 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 70.0P.004.151

1. SAFETY CONSIDERATIONS V

A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required andlor posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-070-001, Standby Gas Treatment System (Rev. 19)

AR-029-001 SGTS A FILTER TRAIN FAILED (AI I) (Revision 21) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

.u. NONE IV. TASK CONDITIONS A. Unit 1 is operating in Mode 1.

B. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

V. INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A VI. TASK STANDARD Identifies the FAILED CLOSED SGTS MAKEUP OA DMP FD07551A2 damper and secures SGTS Fan OV109A.

VII. TASK SAFETY SIGNIFICANCE Provides the ability to perform HPCl operability surveillance.

2004 NRC Exam As Given

(

PERFORMANCt CHECKLIST Page 3 of 8 Appl. To/JPM No.: 70.0P.004.151 Student Name:

Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Select any Mode 1 100% IC 0 Run batch file IGBSBGTAFAIL When student is ready to begin JPM, place the simulator in RUN.

Obtain a controlled copy of OP-070-001 Standby Gas Controlled copy obtained.

Treatment System, Select the correct section to perform. Selects section 3.2 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

Review all precautions. Follows all precautions as applicable.

At Panel OC681, DEPRESS SGTS Clg OA Dmp Depresses SGTS CLG OA DMP HD07555A OPEN pushbutton.

HD 07555A OPEN pushbutton.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of I 2004 NRC Exam As Given

PERFORMAN& CHECKLIST Page 4 of 8 i::

Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step Action Standard Eva1 Comments

~

6 OBSERVE SGTS Clg OA Dmp HD07555A OPENS to Verifies:

allow suction flow path for start of SGTS Fan A.

Red Light is LIT and Amber Light is NOT LIT for SGTS CLG OA DMP HD 07555A

  • 7 At Panel OC681, START Standby Gas Treatment Places selector switch for SGTS FAN System A by placing selector switch for SGTS Fan OVI 09A to START OV109A to START. Verifies:

Red Light is LIT and Amber AND White Lights are NOT LIT 8 When Fan starts, OBSERVE flow increases >3000 Verifies:

cfm on SGTS Air Flow FR07553A.

SGTS AIR FLOW FR-07553A increases to greater than 3000 CFM.

EVALUATOR NOTE:

SGTS Fans may not obtain 10,100 cfm due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551A2.

EVALUATOR NOTE:

Flowrate for this JPM should be (-4,800 CFM)

  • Critical Step #Critical Sequence STGP-QA-1250 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

r; PERFORMANCL CHECKLIST Page5of8 Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step Action Standard Eva1 Comments 9 CHECK following positioned as indicated: Verifies:

SGTS Fan Inlet Dmp HD07552A FULL OPEN. Red Light is LIT and Amber Light is NOT LIT for SGTS FAN INLET DMP HD 07552A IO SGTS A Inlet Dmp HD07553A FULL OPEN. Verifies:

Red Light is LIT and Amber Light is NOT LIT for SGTS A INLET DMP HD 07553A EVALUATOR NOTE:

When OA DMP FD 07551A2 reaches FULL OPEN it will FAIL CLOSED causing AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED alarm to actuate. Fan OVI 09A will ALSO fail to trip.

11 SGTS Makeup OA Dmp FD07551A2 Approximately 70 seconds after SGTS MODULATED/OPEN approximately 70 seconds after Fan OV109A started.

SGTS Fan OVI 09A started.

Verifies:

SGTS Makeup OA DMP FD 07551A2 BOTH Red Light and Amber Light LIT

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step Action Standard Eva1 Comments FAULT STATEMENT:

OA DMP FD07551A2 fails CLOSED. Fan OV109A will ALSO fail to trip EVALUATOR NOTE:

Candidate may STOP SGTS FAN OV109A before AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED alarms due to loss of suction flowpath. If the candidate stops the fan at this time, it would not be necessary to perform the remaining steps of the AR.

This is acceptable.

12 Acknowledges AR-029-001 (AI I ) SGTS A FILTER TRAIN FAILED alarm 13 Refers to appropriate alarm response procedure. Selects AR-029-001 (AI 1) SGTS A

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step Action Standard Eva1 Comments

  • I4 If no initiation signal present, CHECK SGTS FAN Checks:

OV109A tripped.

SGTS FAN OV109A red light LIT and Amber light NOT LIT Places control switch for SGTS FAN OV109A to STOP Verifies:

SGTS FAN OVIOSA red light NOT LIT and Amber light LIT 15 CHECK SGTS AIR FLOW & HEPA FlLT PRESS DlFF Determines not applicable since Fan is FR07553A. SGTS AIR FLOW should be tripped approximately 10,100 cfm.

16 CHECK HIC07555A on Panel OC883A is set at 45. Contacts NPO to check HIC07555A is set at 45 EVALUATOR CUE:

Role-play as NPO and acknowledge the request.

Inform candidate that HIC07555A is set at 45 17 CHECK SGTS Fan OV109A supply breaker MCC Determines not applicable.

OBI3601 I, thermal overloads and control power fuse.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

( {'

PERFORMAN& CHECKLIST Page8of8 '

Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step Action Standard Eva1 Comments 18 If fan tripped after starting time delay, CHECK fan Determines not applicable.

integrity.

I9 COMPLY with TS 3.6.4.3 and TR 3.6.1 Informs supervisor to refer to TS 3.6.4.3 and TR 3.6.1.

20 If Zone 3 Secondary Containment Isolation signal Determines not applicable.

present, CONFIRM SGTS FAN OV109A trips when Zone 3 lockout relay XY07553A reset.

EVALUATOR CUE:

This completes the JPM.

  • Critical Step #Critical Sequence STCP-QA-1Z5B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS 1

A. Unit 1 is operating in Mode 1.

B. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A.

2004 NRC Exam As Given 1of2

TASK CONDITIONS

-- A. Unit 1 is operating in Mode 1.

6. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A.

2004 NRC Exam As Given 2of2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE v

APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 24.0P.006.102 1 01/19/04 264000 A4.04 3.7/3.7 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Manually Synchronize Diesel Generator Ato 4.1 6 KV Bus I A from Panel OC653 in Accordance With 0P-024-001 Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Ap provaI :

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 20 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2.(9193)

Page 1 of 1 File No. A14-5B 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 24.0P.006.102

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

It. REFERENCES OP-024-001 Diesel Generator (Revision 40)

III. REACTIVITY MAN1PULATlONS This JPM satisfies the requirements of Operational Activity(s):

NONE

--/

IV. TASK CONDITIONS A. Diesel Generator Awas started manually from 06653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

B. No other diesel generator is operating synchronized to the grid.

C. A NPO is stationed at the diesel.

D. Air intake manifold temperatures are being controlled in AUTOMATIC.

V. INITIATING CUE Manually synchronize Diesel Generator Awith 4.16 KV Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.

VI. TASK STANDARD Diesel Generator Asynchronized to 4.16 KV Bus 1A and loaded to 3600 to 4000 KW without causing any automatic Diesel generator trips to occur.

VII. TASK SAFETY SIGNIFICANCE Verifies operability of a safety related electrical power source.

2004 NRC Exam As Given

( i \

PERFORMANL, CHECKLIST Page 3 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Manually start A D/G IAW OP-024-001 section 2.2 MANUAL START OF DIESEL GENERATOR A(B)(C)(D)(E) FROM PANEL 06653 0 Start A & B ESW pumps 0 Fill out a DG start log for the ADG.

The following conditions should then exist:

0 DG AWatts - 0 0 DG AAmps - 0 0 DG AFreq - -60 Hz DG AVolts - -4,200 VAC 0 Ready to Run Light illuminated 0 DG AGov Mode Sel HS-00055A - DROOP DG AVolt Reg Mode Sel HS-00056A - AUTO DG A to Bus 1A Bkr lA20104 - OPEN 0 DG Ato Bus 1A Synch Sel HS-00039A - OFF 0 The PMS CRT is displaying the DG electrical screen When student is ready to begin JPM, place the simulator in RUN.

1 Obtain a controlled copy of OP-024-001 Diesel Controlled copy obtained.

Generator

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

( '.

PERFORMANCE CHECKLIST Page 4 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments 2 Selects the correct section to perform. Selects section 2.3 EVALUATOR NOTE:

Due to the nature of this JPM, it may be necessary to allow the candidate to check the prerequisites and precautions. This is acceptable.

3 Review the prerequisites. Ensures that all prerequisites have been met.

4 Review the precautions. Follows the precautions as applicable.

EVALUATOR NOTE:

During synchronizing or load changes, increasing voltage adjust will reduce negative (in) WARS and decreasing voltage adjust will reduce positive (out)

WARS.

EVALUATOR NOTE:

When the sync switch is placed in the ON position the synchroscope pointer will start moving (either direction), the white light on each side of the synchroscope will flash off and on as the pointer rotates.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i (

PERFORMANCt CHECKLIST Page 5 of I 1 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments

  • 5 AFTER diesel generator run unloaded 5 minutes or as Inserts Key into DG A to Bus I A Sync required during emergency, Synchronize Diesel Sel HS-00039A switch and places in Generator A to 4.16KV Bus IA, as follows: the ON position.

Place DG A to Bus 1A Sync Sel HS-00039A switch to ON.

  • 6 Adjust DG A Voltage Adjust HS-00053A so red scale Places the DG A Voltage Adjust 4 KV Diff AC Volts Xl-00036 indicates slightly right of HS-00053A switch to the RAISE or 0 and not exceed 35 volts AC. The Green Band on LOWER position as required to achieve XI-00036 is the acceptable area. Green band value on XI-00036.

EVALUATOR NOTE:

The FAST direction on the Synchroscope is clockwise.

7 Adjust DG A Speed Governor HS-00054A so Places DG A Speed Governor Synchroscope XI-00037 rotating in FAST (clockwise) HS-00054A switch to the RAISE or direction at 1 (one) revolution per 60 seconds. LOWER position to cause the Synchroscope XI-00037 pointer to rotate slowly (approximately Irpm) in the FAST (clockwise) direction.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMAN& CHECKLIST Page 6 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

When DG A to Bus 1A Bkr 1A20104 breaker is closed in the next step, the following should occur:

0 Both white lights will remain extinguished and the synchroscope pointer will stop at the 12 o'clock position.

0 The Running Idle light will extinguish and the Running Loaded light illuminates on the Local Panel (OC521A).

+8 Close DG A to Bus I A Bkr 1A20104 when When the Synchroscope XI-00037 synchroscope at or slightly before "12 o'clock" pointer is at or slightly before the 12 position. o'clock position:

Places DG A to Bus 1A Bkr 1A20104 to the closed position Verifies:

Red light LIT and Amber light NOT LIT

+9 Promptly go to RAISE and Slowly increase load to Places DG A Speed Governor 1000 Kw over a 30-45 second period using DG A HS-00054A switch to RAISE over a Speed Governor HS-00054A switch. period of 30-45seconds until DG A Watts XI-00032A meter indicates 1,000 Kw.

  • Critical Step #Critical Sequence STCP-QA-1250 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

{ I)/

PERFORMANL CHECKLIST Page 7 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments

  • IO Promptly Position DG A Voltage Adjust HS-00053A to Places DG A Voltage Adjust maintain 0 to 900 WARS but as close to 0 on positive HS-00053A switch to LOWEWRAISE in side as possible on DG A WARS GVARM on Panel order to maintain 0 to 900 WARS but OC519A and/or PlCSY Format Diesel Generator A. as close to 0 on positive side as possible on PlCSY Format Diesel Generator A 11 Place DG A to Bus 1A Sync Sel HS-00039A switch to Places DG A to Bus 1A Sync Sel OFF. HS-00039A switch to OFF.

12 AT Diesel Engine Control Panel OC521A, Observe Contacts NPO at the Diesel and Running Loaded light ILLUMINATED requests the status of the Running Loaded light Ensure intake air manifold temperatures maintained in accordance with section 2.15 of this procedure at all AND times diesel generator operating.

Instructs NPO to ensure intake air manifold temperatures maintained in accordance with section 2.1 5 of this procedure at all times while diesel generator is operating.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCt CHECKLIST Page 8 of I 1 Appl. TolJPM No.: 24.0P.006.102 Student Name:

Step Standard Eva1 Comments EVALUATOR NOTE:

Role-play the diesel NPO and inform the control room that the Running Loaded light is LIT AND intake air manifold temperatures are being maintained in accordance with section 2.15 of this procedure.

13 IF diesel generator started due to emergency:

- Determines Diesel generator was not started due to an emergency based on Load as required to support plant conditions.

initial conditions.

CAUTION During each increase, anticipated DG output must not exceed present T-IO (T-20)bus load CAUTION If T-I 0 (T-20) Tap Changer Setpoint of Positive (Out) or Negative (In) I000 WARS is reached for 2 20 seconds, Tap Changer will automatically change tap EVALUATOR CUE:

Inform the candidate that 5 minutes has elapsed.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCt CHECKLIST

(~

Page 9 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments

  • I4 IF diesel generator started for test or other than Places DG A Speed Governor emergency condition: HS-00054A switch to RAISE until DG A Watts XI-00032A meter indicates AFTER 5 minutes operation, Slowly increase load to 2000 Kw using DG A Speed Governor HS-00054A 2,000 Kw.

switch.

AND AND Places DG A Voltage Adjust Promptly Adjust WARS to maintain 0 to 900 WARS HS-00053A switch to LOWEWRAISE in but as close to 0 on positive side as possible using order to maintain 0 to 900 WARS but HS-00053A. as close to 0 on positive side as possible on PlCSY Format Diesel Generator A EVALUATOR CUE:

inform the candidate that 10 minutes has elapsed.

  • Critical Step #Critical Sequence STCP-QA-1250 Rev. 2 (9/93)

Page 1 of I 2004 NRC Exam As Given

i PERFORMANkr CHECKLIST Page 10 of 11 (,

Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments 515 AFTER I O minutes operation at 2000 KW, Slowly Places DG A Speed Governor increase load to 3000 KW over a 30-45 second period HS-00054A switch to RAISE over a using DG A HS-00054A. period of 30-45 seconds until DG A Watts XI-00032A meter indicates AND 3,000 KW.

Promptly Adjust WARS to maintain 0 to 900 W A R but as close to 0 on positive side as possible using AND HS-00053A Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A EVALUATOR CUE:

Inform the candidate that 10 minutes has elapsed.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{ i" PERFORM AN^, CHECKLIST Page 11 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step Action Standard Eva1 Comments

+I6 AFTER I O minutes operation at 3000 KW, (A-D DG Places DG A Speed Governor only) Slowly increase load to 3600 to 4000 KW over a HS-00054A switch to RAISE over a 30-45 second period using DG A Speed Governor period of 30-45 seconds until DG A HS-00054A switch. Watts XI-00032A meter indicates AND 3600 to 4000 KW.

Promptly Adjust WARS to maintain 0 to 900 WARS AND but as close to 0 on positive side as possible using Places DG A Voltage Adjust HS-00053A HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A 17 IF diesel generator operated at < 2000 Kw, Perform Determines that this step is not following for 15 minutes for every hour < 2000 KW applicable since the diesel was just and immediately before shutdown: started.

Raise load to 3600 to 4000 KW using HS-O0054A, AND Promptly Adjust WARs to maintain 0 to 900 WARs but as close to 0 on positive side as possible using HS-00053A.

EVALUATOR CUE:

This completes the JPM 4Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS

--- A. Diesel Generator A was started manually from OC653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

B. No other diesel generator is operating synchronized to the grid.

C. A NPO is stationed at the diesel.

D. Air intake manifold temperatures are being controlled in AUTOMATIC.

INITIATING CUE Manually synchronize Diesel Generator A with 4.16 KV Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.

2004 NRC Exam As Given Iof2

TASK CONDITIONS L

A. Diesel Generator A was started manually from 06653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

B. No other diesel generator is operating synchronized to the grid.

C. A NPO is stationed at the diesel.

D. Air intake manifold temperatures are being controlled in AUTOMATIC.

INITIATING CUE Manually synchronize Diesel Generator Awith 4.16 KV Bus 1A and pick up 3600 to 4000 Kw of load IAW OP-024-001, Diesel Generator section 2.3.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE

'-4 APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 34. EO .005.I01 2 01I14104 295028 EAI.03 3.9/3.9 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions)

Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 10 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

v JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

--- STCP-QA-125A Rev. 2.(9/93)

Page 1 of 1 File No. A14-56 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 34.E0.005.101

1. SAFETY CONSIDERATIONS

'v A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

11. REFERENCES ES-134-001, Restoring Drywell Cooling With A LOCA Signal Present Revision 12 III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE L

IV. TASK CONDITIONS A. An ATWS has occurred coincident with a loss of drywell cooling.

B. EO-I00-1 13 is being implemented for level/power control.

C. EO-I00-103 is being executed for primary containment control.

D. All containment isolations and ECCS actions have properly occurred.

E. ES-134-001 is being implemented and is complete through Step 4.2.

F. CIG 90 # header has been restored.

G. MSIVs have been opened IAW ES-I 84-002, REOPENING MSIVS BYPASSING ISOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

VI. TASK STANDARD Drywell Cooling Logic isolations reset and Drywell cooling restored.

VII. TASK SAFETY SIGNIFICANCE Re-establish containment cooling.

2004 NRC Exam As Given

(:

PERFORMANLc CHECKLIST Page 3 of 7 Appl. To/JPM No.: 34.E0.005.101 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

This JPM is to run AFTER JPM 84.0P.001 .I51 has been completed. This will allow for CIG 90#

header to be restored.

This JPM must be performed on the simulator.

Set up the simulator IAW the attached setup instructions.

Place the simulator in Freeze.

Fill out and approve for use a blank copy of ES-134-001 up to step 4.3; mark steps 4.3.2 and 4.3.4 as N/A. Provide this to the candidate for use in completing the task.

When student is ready to begin JPM, place the simulator in RUN.

I Obtain a controlled copy of ES-I 34-001, RESTORING Controlled copy obtained.

DRYWELL COOLING WITH A LOCA SIGNAL PRESENT 2 Review Sections 1.O through 3.0. Review Sections 1.O through 3.0.

3 Check for approval in Section 4.1. Verifies:

Shift Manager approval at step 4.1

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANL CHECKLIST Page 4 of 7 Appl. To/JPM No.: 34.E0.005.101 Student Name:

Step Action Standard Eva1 Comments 4 Verify step 4.2 is marked as complete Verifies:

step 4.2 is marked as complete 5 Selects the correct section to perform. Selects section 4.3 EVALUATOR NOTE:

Candidate may elect to place the control switches to CLOSE for the valves listed in step 6 below. If the candidate places these switches to CLOSE, then it will be Critical that they place the same control switches back to OPEN in step I 7 of this JPM.

6 Ensure the following valves are closed prior to Verifies:

resetting isolation logic:

Amber light -LIT and red light NOT LIT A CLRS CLG WTR OB IS0 VLVS HV-18781Al and for the following valves:

HV-18781A2.

A CLRS CLG WTR OB IS0 VLVS A CLRS CLG WTR IB IS0 VLVS HV-1878281 and HV-18781A1 and HV-18781A2.

HV-18782B2.

A CLRS CLG WTR IB IS0 VLVS B CLRS CLG WTR OB IS0 VLVS HV-I8781B I and HV-18782B1 and HV-I 878282.

HV-18781B2.

B CLRS CLG WTR OB IS0 VLVS B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18781B I and HV-I 878182.

HV-18782A2.

B CLRS CLG WTR IB IS0 VLVS HV-I 8782Al and HV-18782A2.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 ( 9 ~ 3 )

Page 1 of 1 2004 NRC Exam As Given

i' i,' i..

PERFORMANCE CHECKLIST Page 5 of 7 Appl. To/JPM No.: 34.E0.005.101 Student Name:

Step Action Standard Eva1 Comments

=

7 If Containment Instrument Gas has not been restored Based on initial conditions:

by ES-184-002, Ensure the following are closed at Determines that CIG 90# header has Panel 1C601 prior to resetting isolation logic:

been restored.

INSTR GAS TO CONTN IS0 SV-12651.

INSTR GAS CMP IB SUCT IS0 HV-12603.

INSTR GAS CMP OB SUCT IS0 SV-12605.

  • 8 Reset Drywell Cooling (HVAC LOCA Trip IA and 1B) Depresses CHAN A DRWL CLG HS-Logic: 14141A RESET pushbutton.

On IC601 momentarily Depress CHAN A DRWL CLG HS-14141A RESET push button.

9 Observe CHAN A DRWL CLG RESET green IS0 light Verifies:

extinguishes. Green light above the pushbutton NOT LIT.

  • IO On IC601 momentarily Depress CHAN B DRWL CLG Depresses CHAN B DRWL CLG HS-HS-14141B RESET push button. 141418 RESET pushbutton.

11 Observe CHAN B DRWL CLG RESET green IS0 light Verifies:

extinguishes. Green light above the pushbutton NOT LIT.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCt CHECKLIST Page 6 of 7 Appl. To/JPM No.: 34.E0.005.101 Student Name:

Step Action Standard Eva1 Comments

  • I2 On 1C681 Heat and Ventilation Control Panel Depresses CHAN A RBCW IS0 VALVE momentarily Depress Chan A RBCW IS0 VALVE POS RESET HS-14140A.

POS RESET HS-14140A push button.

13 Observe Chan A RBCW IS0 VALVE POS RESET Verifies:

white Is0 light extinguishes.

White light above the pushbutton NOT LIT.

  • I4 On 1C681 Heat and Ventilation Control Panel Depresses CHAN B RBCW IS0 VALVE momentarily Depress Chan B RBCW IS0 VALVE POS RESET HS-14140B.

POS RESET HS-14140B push button.

15 Observe Chan B RBCW IS0 VALVE POS RESET Verifies:

white Is0 light extinguishes.

White light above the pushbutton NOT LIT.

16 If Containment Instrument Gas has not been restored Based on initial conditions:

by ES-I 84-002, Restore CIG in accordance with Determines that CIG 90# header has section 4.4 of this procedure.

been restored.

EVALUATOR NOTE:

Following valves may not open if CIG header pressure is low.

Drywell cooling will occur after the following steps if RBCCW is in service and the drywell cooling swap valves have re-aligned.

  • Critical Step #Critical Sequence STCPUA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i (~

PERFORMAN& CHECKLIST Page 7 of 7 Appl. To/JPM No.: 34.E0.005.101 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

Back in step 6 of this JPM, the Candidate may have placed the control switches to CLOSE for the valves listed in step 17 below. If the candidate placed these switches to CLOSE, then it is Critical that they place the same control switches back to OPEN in step 17 below.

17 On 1C681 Heat and Ventilation Control Panel, Ensure Verifies:

following valves open:

Amber light - NOT LIT and red light LIT A CLRS CLG WTR OB IS0 VLVS HV-18781Al and for the following valves:

HV-18781A2.

A CLRS CLG WTR OB IS0 VLVS A CLRS CLG WTR IB IS0 VLVS HV-18782Bl and HV-18781Al and HV-18781A2.

HV-18782B2.

A CLRS CLG WTR IB IS0 VLVS B CLRS CLG WTR OB IS0 VLVS HV-18781B1 and HV-1878281 and HV-18782B2.

HV-18781B2.

B CLRS CLG WTR OB IS0 VLVS B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18781B1 and HV-18781B2.

HV-18782A2.

B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18782A2.

EVALUATOR NOTE:

That completes this JPM

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS

.- A. An ATWS has occurred coincident with a loss of drywell cooling.

B. EO-100-113 is being implemented for IeveVpower control.

C. EO-100-103 is being executed for primary containment control.

D. All containment isolations and ECCS actions have properly occurred.

E. ES-134-001 is being implemented and is complete through Step 4.2.

F. CIG 90 # header has been restored.

G. MSlVs have been opened IAW ES-184-002, REOPENING MSIVS BYPASSING I SOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS

-1.-

A. An ATWS has occurred coincident with a loss of drywell cooling.

B. EO-100-113 is being implemented for level/power control.

C. EO-1 00-103 is being executed for primary containment control.

D. All containment isolations and ECCS actions have properly occurred.

E. ES-134-001 is being implemented and is complete through Step 4.2.

F. CIG 90 # header has been restored.

G. MSlVs have been opened IAW ES-184-002, REOPENING MSIVS BYPASSING ISOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 84.0P.001 .I51 1 01/15/04 295037 EA1.I 1 3.W3.6 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG IAW OP-184-001 Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head IO Date of Performance: Allowed Time (Min.) Time Taken (Min.)

--- I JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-I25A Rev. 2, (9/93)

Page 1 of 1 File No. A14-58 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 84.0P.001 .I51

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

11. REFERENCES OP-184-001,Main Steam System (Revision 19) 5 Keys for the bypass switches 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

b-NONE IV. TASK CONDITIONS A. An ATWS has occurred coincident with a loss of drywell cooling.

6. MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E. CIG System has isolated due to high drywell pressure; both compressors have tripped.

V. INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

VI. TASK STANDARD MSlV and CIG interlocks Bypassed and CIG System 90# header pressurized.

VII. TASK SAFETY SIGNIFICANCE Protect the containment by providing Normal heat sink capability.

2004 NRC Exam As Given

(,' f\

PERFORMANCk CHECKLIST Page 3 of 9 Appl. To/JPM No.:84.OP.001 .I51 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

0 Set up the simulator IAW attached setup instructions.

Place the simulator in Freeze.

0 When student is ready to begin JPM, place the simulator in RUN.

1 Obtain a controlled copy of OP-184-001. Controlled copy obtained.

2 Selects the correct section to perform. Selects Attachment A of OP-I 84-001 (Hard Card)

EVALUATOR NOTE:

When first switch on IC645 is placed in BYPASS, Annunciator AR-147-D1 will alarm.

3 Bypass MSlV Low Water Level 1 Isolation at IC645 by Placing the following to BYPASS:

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCr CHECKLIST Page 4 of 9 Appl. To/JPM No.:84.OP.001 .I 51 Student Name:

Step Action Standard Eva1 Comments

  • 4 HS-B21-S38A Rx Wtr Lvl 1 MSlV Bypass Logic A. Inserts key into Bypass switch HS-B21-S38A Rx Wtr Lvl IMSlV Bypass Logic A and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT

  • 5 HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C. Inserts key into Bypass switch HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT EVALUATOR NOTE:

When first switch on IC644 is placed in BYPASS, Annunciator AR-148-D1 will alarm.

6 Bypass CIG Low Water Level 1 and High Drywell Pressure Isolation by Placing the following to BYPASS:

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANLL CHECKLIST Page 5 of 9 Appl. To/JPM No.:84.OP.001.I51 Student Name:

Step Action Standard Eva1 Comments

  • 7 At 1C645, HS-12694 Low Lvl 1/Hi Drywell Press CIG Inserts key into Bypass switch Bypass (HV-12603) HS-12694 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT

  • 8 At IC645, HS-12695 Low Lvl 1/Hi Drywell Press CIG Inserts key into Bypass switch Bypass (SV-12651) HS-12695 Low Lvl l/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT

  • 9 At 1C644, HS-12696 Low Lvl l/Hi Drywell Press CIG Inserts key into Bypass switch Bypass (SV-12605) HS-12696 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of1 2004 NRC Exam As Given

(,

Page 6 of 9 Appl. To/JPM No.:84.OP.001 .I51 Student Name:

Step Action Standard Eva1 Comments IO -

IF 1.72# High Drywell Pressure isolation has occurred, Determines that high drywell pressure Restore CIG as follows: does exist either from the initiating cue OR control room indications.

  • I 1 Open lnstr Gas Cmp Suct Is0 HV-12603. Depresses OPEN pushbutton for lnstr Gas Cmp Suct Is0 HV-I2603 and verifies:

Red light LIT Amber light NOT LIT

  • I2 Open lnstr Gas To Contn Is0 SV-1265 Depresses OPEN pushbutton for lnstr Gas To Contn Is0 SV-I2651 and verifies:

Red light LIT Amber light NOT LIT

  • I3 Open lnstr Gas Cmp OB Suct IS0 SV-12605. Depresses OPEN pushbutton for lnstr Gas Cmp Of3 Suct IS0 SV-?2605and verifies:

Red light LIT Amber light NOT LIT

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(:

PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.:84.OP.001.I51 Student Name:

Action Standard Eva1 Comments Reset Instrument Gas Compressor 1K205A and Contacts NPO and directs CIG IK205B at Containment Instrument Gas Control Panel compressors be placed into service 1C239 IAW OP-I 84-001 attachment A step 4.a through 4.f EVALUATOR CUE:

Role-play the NPO and acknowledge the request.

FAULT STATEMENT:

As NPO, REPORT THE CIG COMPRESSORS WILL NOT RESET.

EVALUATOR CUE:

If necessary Role-play the Unit Supervisor and direct the candidate to restore CIG system pressure with any available installed plant system.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{ /I

(:

PERFORMAN& CHECKLIST Page 8 of 9 Appl. To/JPM No.:84.OP.001 .I51 Student Name:

pG Action Standard Eva1 Comments 115 -

IF Instrument Air available, Cross-Tie Instrument Air Verifies:

to CIG 90# Header as follows.

IA 1K107A and IA 1K107B White lights LIT and Amber lights NOT Slowly Open I-A to CIG Cross-Tie 126172 And LIT 126167 IA Pressure PI-12511A - 100 psig Contacts NPO and requests:

Slowly Open I-A to CIG Cross-Tie 126172And126167 EVALUATOR CUE:

Role-play the NPO and acknowledge the request.

BOOTH CUE Insert pfs 2 MRF PC125001 OPEN (opens IA 126167/126172)

EVALUATOR CUE: Acknowledges the report Role-play NPO and contact PCO to inform I-A to CIG Cross-Tie 126172 And 126167 are OPEN

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCL CHECKLIST Page 9 of 9 Appl. To/JPM No.:84.OP.001 . I 51 Student Name:

Step Action Standard Eva1 Comments 16 Verifies 90# CIG header is being pressurized Verifies:

INSTR GAS HDR PRESS PI-I 2612 AND INSTR GAS SUPP PRESS PI-I2642 Slowly rising EVALUATOR CUE:

That completes this JPM

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS

--.--- A. An ATWS has occurred coincident with a loss of drywell cooling.

6. MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E. CIG System has isolated due to high drywell pressure; both compressors have tripped.

INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS u-A. An ATWS has occurred coincident with a loss of drywell cooling.

B. MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E. CIG System has isolated due to high drywell pressure; both compressors have tripped.

INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY L-JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 45.0P.013.151 4 01/11/04 259001 A2.07 3.713.8 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Perform Switchina Feedwater Level Control Completed By: Reviews:

Russ Halm Writer Date InstructorMlriter Date Approval :

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 10 v

Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-1258 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.013.151

--c

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES A. OP-145-001, RFP and RFP Lube Oil System (Rev. 35)

III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

None IV. TASK CONDITIONS A. Unit 1 is in Mode 1 100% power.

B. Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

C. I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

V. INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

VI. TASK STANDARD FW LEVEL Control returned to A channel with NO limiter 1 runback on low RX water level (+I3 inches) and NO turbine trip on high RX water level (+54 inches) occurs.

VII. TASK SAFETY SIGNIFICANCE Incorrect performance of the task could result in excessive moisture to the main turbine due to carryover, or loss of available NPSH to the recirculation pumps due to carryunder.

STCP-QA-1258 Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCt CHECKLIST Page 3 of 7 Appl. To/JPM No.: SlRO 45.0P.013.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

This JPM must be performed in the simulator.

Select a 100% IC Place feedwater level control in SELECT Narrow range Level A Insert BAT FWB.FWLC-BFL The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

When candidate is ready to begin JPM, place the simulator in RUN.

Candidate locates procedure and refers to Obtains procedure appropriate section. OP-145-001, RFP and RFP Lube Oil System section 2. I O .

Reviews prerequisites and precautions. Reviews prerequisites and precautions and Checks:

RX water level A & B within 2 inches of each other on LI-C32-1R606A & B.

  • Critical Step #Critical Sequence STCP-PA-1256 Rev. 2,(9/93)

Page 1 of 1 2004 NRC Exam As Given

(,

PERFORMANCt CHECKLIST Page 4 of 7 Appl. To/JPM No.: S/RO 45.0P.013.151 Student Name:

Step Action Standard Eva1 Comments 3 Verify feed flow/steam flow delta Stable. Observe feed flow/steam flow delta.

Checks XR-I 0602:

CH 3 total FW flow CH 4 total STM flow CH 5 Rx NR level on OR PICSY AND Determines the delta to be stable EVALUATOR NOTE:

Steam flow/feed flow delta and/or RPV water level may change during the next step, requiring adjustments to FW level controller.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMAN& CHECKLIST Page 5 of 7 i Appl. To/JPM No.: S/RO 45.0P.013.151 Student Name:

Step Action Standard Eva1 Comments FAULT STATEMENT REACTOR WATER LEVEL INDICATION WILL DECREASE AT A RATE OF =3 to 5/MIN AFTER THE STUDENT SELECTS THE B FEEDWATER LEVEL.

4 Transfer feedwater level control from A to B level input as follows with the Averaged or Selected HS14268 in SEL 5 Observe feed flow/steam flow delta Check for deviation indication at FW LEVEL CTUDEMAND SIGNAL LIC-C32-1R600 controller.

EVALUATOR NOTE:

Candidate should recognize Reactor Water Level is decreasing at a fast rate.

  • 6 Depress B push button for SELECT LVL A Depress Bpushbutton for SELECT LVL A OR OR B HS-C32-1S01 B HS-C32-1Sol.
  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2,(9/93)

Page 1 of 1 2004 NRC Exam As Given

r' i' PERFORMANL CHECKLIST Page6of7 '.

Appl. To/JPM No.: S/RO 45.0P.013.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

Candidate may recognize Reactor Water Level is decreasing at a PRIOR to attempting to null the FW LEVEL CTLlDEMAND SIGNAL.

7 Null FW LEVEL CTUDEMAND SIGNAL Attempts to NULL the deviation by adjusting LIC-C32-1R600 controller by adjusting tape the tape setpoint on FW LEVEL CTL/DEMAND setpoint. SIGNAL LIC-C32-1R600 controller.

AND Determines FW LEVEL CTUDEMAND SIGNAL LIC-C32-1R600 controller cannot be NULLED.

  • 8 IF deviation cannot be nulled, Transfer back Depress 'Apushbutton for SELECT LVL A OR to A level input as follows: B HS-C32-1Sol.

Depress A push button for SELECT LVL A OR B HS-C32-1Sol.

9 Null FW LEVEL CTUDEMAND SIGNAL Null the FW LEVEL CTUDEMAND SIGNAL LIC-C32-1R600 controller by adjusting tape LIC-C32-1R600 by adjusting the tape setpoint.

setpoint.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

[

PERFORMANCE CHECKLIST Page 7 of 7 Appl. To/J M No.: S/RO 45.0P.013.151 Student Name:

Step Action Standard Eva1 Comments 10 IF necessary, Slowly Return FW LEVEL If necessary slowly return FW LEVEL CTUDEMAND SIGNAL LIC-C32-1R600 CTUDEMAND SIGNAL LIC-C32-1R600 tapeset to 34" tapeset to 3 4 .

11 Informs supervisor of situation Notifies supervisor that B channel was failing low.

EVALUATOR CUE:

Role play the Unit Supervisor and acknowledge the notification.

EVALUATOR CUE:

This completes the JPM.

4eCritical Step #Critical Sequence STCP-QA- 1258 Rev. 2. (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS b A. Unit 1 is in Mode 1 100% power.

B. Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

C. I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

Page 1 of 2 STCP-QA-1258 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS v A. Unit 1 is in Mode 1 100% power.

B. Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

C. I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

Page 2 of 2 STCP-QA-12SB Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE

-- APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 14.0P.006.151 0 07/19/04 295018 AA1.03 3.3/3.4 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Place Standby RBCCW Pump In Service IAW OP-I 14-001 (Pump casing drain line leak develops)

Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 15 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uation:

Evaluator Name:

Signature Typed or Printed Comments:

~--*.-

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 File NO.A14-5B 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 14.0P.006.151

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 14-001 Reactor Building Closed Cooling Water System (RBCCW) (Revision 16)

III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

NONE IV. TASK CONDITIONS

~

A. Both Units are in Mode I@ 100% power.

B. ARBCCW pump is in service, B RBCCW pump is in standby.

C. Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

V. INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

VI. TASK STANDARD A RBCCW pump is again supplying cooling to RBCCW loads, B RBCCW pump is shutdown with suction and discharge path isolated (Casing drain line leak isolated).

VII. TASK SAFETY SIGNIFICANCE Failure to complete the task may result in serious permanent damage to components served by the RBCCW system.

2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 3 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Select any Mode IIC Insert IMF RW11401 1.0 to reduce RBCCW head tank level to 18.5 inches. Monitor on R W I screen.

Freeze simulator Remove leak by inserting DMF RWI1401 0 Snapan IC 0 Assign pfs I MRF RW114001 0 Assign pfs 2 MRF RW114001 100 0 Assign pfs 3 IMF RW114001 0.02 0 Assign pfs 4 MRF RW114002 0 Assign pfs 5 DMF RW114001 0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

When student is ready to begin JPM, place the simulator in RUN.

1 Select the correct section to perform. Selects section 2.2

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i i' PERFORMANCt CHECKLIST Page 4 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Action Standard Eva1 Comments 2 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the student all prerequisit,, have been met.

3 At Panel 1C668, Start standby RBCCW PUMP Depresses RBCCW PP 1P21OB 1P21OB by Depressing START push button. START pushbutton Verifies:

Red light LIT; amber light NOT LIT 4 Observe RBCCW Pump B discharge pressure Contacts NPO at the pump and request between 90-110 psig on local pressure gage a check of RBCCW Pump B discharge PI-I 13068. pressure between 90-110 psig on local pressure gage Pl-I 13066.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump 6 discharge pressure on local pressure gage PI-I 13068 is 96 psig.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCE CHECKLIST Page 5 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments 5 Slowly Close running RBCCW Pump A Dsch 113062. Contact NPO at the pump and request Slowly Close running RBCCW Pump A Dsch valve II3062 EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 1 MRF RWII4001 0 to close RBCCW Pump A Dsch valve I13062 EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump A Dsch valve I13062 has been slowly closed.

6 Stop running RBCCW PUMP 1P210A by Depressing Depresses RBCCW PP 1P21OA STOP STOP push button. pushbutton Verifies:

amber light LIT; Red light NOT LIT

%Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

i (

PERFORMANLL CHECKLIST Page 6 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments 7 Check RBCCW Pump B discharge pressure between Contacts NPO at the pump and 80-95 psig on local gauge PI-I 13068. requests:

Check RBCCW Pump B discharge pressure between 80-95 psig on local gauge PI-I 1306B.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump B discharge pressure between 80-95 psig on local gauge PI-I 1306B is 86 psig.

8 Check RBCCW HX discharge pressure on PI-I 1308, Verifies RBCCW HX DISCH PRESS Panel IC668 stabilizes between 72-82 psig. PI-I 1308 between 72-82 psig.

FAULT STATEMENT WHEN THE RBCCW PUMP A DSCH VALVE 113062 IS OPENED IN THE NEXT STEP, A RBCCW LEAK WILL OCCUR THAT WILL CAUSE AR-123-EO6 RBCCW HEAD TANK HI-LO LEVEL TO ALARM.

  • 9 Open RBCCW Pump A Dsch 113062. Contact NPO at the pump and request reopening of RBCCW Pump A Dsch valve 113062
  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(: (:

PERFORMANCt CHECKLIST Page 7 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 2 MRF RW114001 100 to open RBCCW Pump A Dsch valve 113062 EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump A Dsch valve 113062 has been opened.

BOOTH CUE:

Insert pfs 3 IMF RW114001 0.02 to INITIATE the RBCCW leak EVALUATOR CUE:

AFTER REPORTING THE CLOSING OF report RBCCW Pump A Dsch valve 113062 Role-play the NPO at the RBCCW pumps and report a LARGE leak on the B RBCCW pump casing drain line.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 8 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

~- ~

Step Action Standard Eva1 Comments 10 Acknowledge the alarm and refer to appropriate AR Refers to AR-I 23-E06 RBCCW HEAD procedure TANK HI-LO LEVEL EVALUATOR NOTE:

Candidate may dispatch an NPO to the RBCCW head tank to determine level. If candidate does request local level on RBCCW head tank, report the level as

-18 inches. (Normal level is -40 inches)

EVALUATOR CUE:

Candidate may relay this information to t, ,e Unit Supervisor and request direction. If the candidate requests direction, ask the candidate for their recommendation.

Candidate recommendation should be to:

Restart A RBCCW pump Shutdown B RBCCW pump Isolate B RBCCW pump suction and discharge valves

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

I'

'/

r' PERFORM AN^;^ CHECKLIST Page 9 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

The remaining steps of this JPM are written to support this recommendation. If additional recommendations (for example: initiating makeup to the head tank) are made they will need to be evaluated for appropriateness.

11 Select the correct section to perform. Selects section 2.2 12 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

  • I3 At Panel IC668, Start standby RBCCW PUMP Depresses RBCCW PP 1P2 OA IP21OA by Depressing START push button. START pushbutton Verifies:

Red light LIT; amber light NOT LIT

  • Critical Step #Critical Sequence STCP-aA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANL CHECKLIST Page 10 of 12 i

Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments 14 Observe RBCCW Pump A discharge pressure Contacts NPO at the pump and request between 90-1 I O psig on local pressure gage a check of RBCCW Pump A discharge PI-I 1306A. pressure between 90-1 10 psig on local pressure gage PI-I 1306A.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump A discharge pressure on local pressure gage PI-I 1306A is 96 psig.

  • I5 Slowly Close running RBCCW Pump B Dsch 113068. Contact NPO at the pump and request Slowly Close running RBCCW Pump B Dsch valve I13068 EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 4 MRF RW114002 0 to close RBCCW Pump B Dsch valve I13068

%Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCE CHECKLIST Page 11 of 12 Appl. To/JPM No: 14.0P.006.151 Student Name:

Step Action Standard Evai Comments EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump B Dsch valve 113068 has been slowly closed.

  • I6 Stop running RBCCW PUMP 1P210B by Depressing Depresses RBCCW PP IP21OB STOP STOP push button. pushbutton Verifies:

amber light LIT; Red light NOT LIT 17 Check RBCCW Pump A discharge pressure between Contacts NPO at the pump and 80-95 psig on local gauge PI-I 1306A. requests:

Check RBCCW Pump A discharge pressure between 80-95 psig on local gauge PI-l1306A.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump A discharge pressure between 80-95 psig on local gauge Pl-I 1306A is 86 psig.

18 Check RBCCW HX discharge pressure on PI-I 1308, Verifies RBCCW HX DlSCH PRESS Panel IC668 stabilizes between 72-82 psig. PI-I 1308 between 72-82 psig.

+KCritical Step #Critical Sequence STCP-W-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(:

PERFORMANCt CHECKLIST Page 12 of 12 Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step Action Standard Eva1 Comments

  • I9 Close B RBCCW pump suction valve I13063 Contact NPO at the pumps and request closing of B RBCCW pump suction I valve I13063 EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

When the candidate requests closing of 6 RBCCW pump suction valve 113063:

Insert pfs 5 DMF RW114001 to remove the RBCCW leak.

EVALUATOR CUE:

Role-play NPO at the pump and report BRBCCW pump suction valve I13063 is closed. I EVALUATOR CUE:

If necessary Role-play NPO at the pump and inform Control room that the leak has stopped.

EVALUATOR CUE:

That completes this JPM

%Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS L- A. Both Units are in Mode 1 @ 100% power.

B. ARBCCW pump is in service, B RBCCW pump is in standby.

C. Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS

--- A. Both Units are in Mode 1 @ 100% power.

B. A RBCCW pump is in service, B RBCCW pump is in standby.

C. Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

2004 NRC Exam As Given 2of2

PENNSYLVANIA POWER 8t LIGHT COMPANY JOB PERFORMANCE MEASURE b

APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 52.0P.005.151 1 0 1/ I 6/04 206000 A4.13 4.1/4.0 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. KIA Task

Title:

Recovery from a Manual Closure of HPCl Isolation Valves With an Initiation Signal Present With a Steam Leak Developing. (OP-152-001)

Completed By: Reviews:

Russ Halm Writer Date InstructorNvriter Date Approval:

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 20 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 File No. A14-5B 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 52.0P.005.151

1. SAFETY CONSIDERATIONS L-A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

It. REFERENCES OP-152-001, HPCl System (Revision 30)

AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP (Revision 23)

AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP (Revision 23) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

..~ .

44 HPCl Recovery from Isolation IV. TASK CONDITIONS A. Due to an inadvertent initiation, HPCl isolation valves were manually isolated.

B. After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.

V. INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute VI. TASK STANDARD HPCl is started and begins injecting into the vessel. The steam leak is isolated.

VII. TASK SAFETY SIGNIFICANCE Secondary containment steam leak is isolated.

2004 NRC Exam As Given

i' ;1 PERFORMANCE CHECKLIST Page 3 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Comments EVALUATOR NOTE:

This JPM must be performed in the simulator.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

Setup the simulator IAW the attached setup instructions.

Place the Simulator in FREEZE.

When the student is ready to begin, place the Simulator in RUN.

Obtain a controlled copy of OP-I 52-001 HPCl System Controlled copy obtained.

Selects the correct section to perform. Selects section 2.1 1 Review the prerequisites. Ensures that the prerequisites have been met.

EVALUATOR CUE:

If necessary, inform the student that the prerequisites have been meet.

Review the precautions. Follows applicable precautions.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 4 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments 5 Select appropriate step to begin. Selects Step 2.1 1.7 EVALUATOR NOTE:

Preferable to prevent auxiliary oil pump from running while re-pressurizing steam supply line. Opening auxiliary oil pump breaker will shutdown auxiliary oil pump which will result in stop and control valve closure. Desirable to re-pressurize as soon as possible to avoid large condensation of steam with inability to drain due to HPCl TURBINE STEAM SUPPLY HV-155-F001 open.

6 Observe following status: Verifies RED light NOT LIT and AMBER light LIT for the following HPCI INJECTION HV-155-FO06 CLOSED.

valves:

HPCl MIN FLOW TO SUPP POOL HV-155-FO12 HPCl INJECTION HV-I 55-FO06 CLOSED.

HPCl MIN FLOW TO SUPP POOL HPCI L-0 CLG WTR HV-156-FO59 CLOSED.

HV-155-F012 HPCl STM SUPPLY IB IS0 HV-155-FO02 CLOSED.

HPCl L-0 CLG WTR HV-156-FO59 HPCl STM SUPPLY OB IS0 HV-155-FO03 CLOSED.

HPCl STM SUPPLY IB IS0 HV-155-FO02 HPCl STM SUPPLY OB IS0 HV-155-FO03

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

!, i' PERFORM AN^^ CHECKLIST Page 5 of 14 '

Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments

~~~

7 HPCl AUXILIARY OIL PUMP 1P213 IN OPERATION. Verifies RED light LIT and AMBER light HPCl TURBINE STEAM SUPPLY HV-155-FO01 NOT LIT for the following:

OPEN. HPCl AUXILIARY OIL PUMP 1P213 HPCl TURBINE STEAM SUPPLY HV-155-FOOI t8 Open HPCl TURBINE AUXILIARY OIL PUMP 1P213 Directs NPO to open Breaker BREAKER 1D274031. 1D274031.

EVALUATOR CUE:

Role-play NPO and acknowledge the request.

BOOTH OPERATOR CUE:

Insert pfs 3 MRF DC188128 OPEN to open the Aux Oil Pump breaker.

EVALUATOR CUE:

Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP 1P213 BREAKER 1D274031 is OPEN.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i i, PERFORMANL CHECKLIST Page6of 14 '

Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments 9 Ensure following indicate CLOSED: Verifies RED light NOT LIT and HPCl TURB STOP VLV FV-15612. AMBER light LIT for the following valves:

HPCl TURB CTL VLV FV-1561I.

HPCl TURB STOP VLV FV-15612.

HPCl TURB CTL VLV FV-1561I.

10 Reset HPCl system isolation as follows: Verifies :

Place control switch for HPCl STM SUPPLY IB IS0 HPCl STM SUPPLY IB IS0 HV-155-FO02 in CLOSE position. HV-155-FO02 in CLOSE position.

RED light NOT LIT and AMBER light LIT 11 Place control switch for HPCl STM SUPPLY OB IS0 Verifies:

HV-155-FO03 in CLOSE position.

HPCl STM SUPPLY OB IS0 HV-155-FO03 in CLOSE position.

RED light NOT LIT and AMBER light LIT 12 Ensure control switch for HPCl WARM-UP LINE IS0 Verifies control switch HPCl WARM-UP HV-155-FI 00 in CLOSE position. LINE IS0 HV-155-Fl00 in CLOSE position.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i:

PERFORMANCk CHECKLIST Page 7 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

If the GREEN light above HPCl AUTO IS0 SIG A RESET HS-E41-1S30 is LIT, then steps 13 and 15 are Critical steps.

  • I3 Place HPCl AUTO IS0 SIG A RESET HS-E41-1S30 Obtains key and inserts into HPCl keyswitch to RESET. AUTO IS0 SIG A RESET HS-E41-1S30 keyswitch Places keyswitch to RESET 14 Ensure HPCl IS0 DIV 1 IS0 status light Verifies:

EXTlNGUISHES. HPCl IS0 DIV IIS0 status light NOT LIT

  • I5 Return HPCl AUTO IS0 SIG A RESET HS-E41-1S30 Places HPCl AUTO IS0 SIG A RESET keyswitch to NORM. HS-E41-1S30 keyswitch to NORM
  • I6 Place HPCl AUTO IS0 SIG B RESET HS-E41-1S18 Obtains key and inserts into HPCl keyswitch to RESET. AUTO IS0 SIG B RESET HS-E41-1S18 keyswitch Places keyswitch to RESET
  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i" (,

PERFORMANCt CHECKLIST Page 8 of 14 Appl. TolJPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments 17 Ensure HPCl IS0 DIV 2 IS0 status light Verifies:

EXTlNGUISHES.

HPCl IS0 DIV 2 IS0 status light NOT LIT

  • I8 Return HPCl AUTO IS0 SIG B RESET HS-E41-lS18 Places HPCl AUTO IS0 SIG B RESET keyswitch to NORM. HS-E41-1S I 8 keyswitch to NORM 19 Pressurize steam supply line as follows: Places control switch to OPEN for the following valves:

Open HPCl STM SUPPLY OB IS0 HV-155-FO03.

HPCl STM SUPPLY OB IS0 Open HPCl WARM-UP LINE IS0 HV-155-F100.

HV-155-FOO3.

HPCl WARM-UP LINE IS0 HV-155-FIOO.

Verifies:

Verifies RED light LIT and AMBER light NOT LIT I

  • Critical Step #Critical Sequence STCPQA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

{

PERFORMANCE CHECKLIST Page 9 of 14

/:

Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments t20 WHEN: Checks steamline pressure is rising on Steam line pressurized to reactor pressure, Open (PLE41-I R602) and compares this to any Reactor pressure indicator.

HPCl STM SUPPLY IB IS0 HV-155-FO02.

WHEN steamline pressure is - reactor pressure:

Places control switch to OPEN for HPCl STM SUPPLY IB IS0 HV-155-FO02.

Verifies RED light LIT and AMBER light NOT LIT 21 Close HPCI WARM-UP LINE IS0 HV-155-FIOO. Places control switch to CLOSE for HPCl WARM-UP LINE IS0 HV-155-FIOO Verifies AMBER light LIT and RED light NOT LIT EVALUATOR NOTE:

High drywell pressure coincident with low reactor pressure initiates closure of valves in following step.

When high drywell pressure condition OR low reactor pressure condition clears, valves can be opened.

  • Critical Step #Critical Sequence STCP-Q.A-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i/ i (

PERFORMANCL CHECKLIST Page I O of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments 22 Ensure following valves OPEN: Verifies RED light LIT and AMBER light NOT LIT for the following valves:

HPCl TURB EXH OB VAC BKR HV-155-FO75.

HPCl TURB EXH OB VAC BKR HPCl TURB EXH IB VAC BKR HV-155-FO79.

HV-155-FO75.

HPCl TURB EXH IB VAC BKR HV-I 55-FO79.

23 Ensure following alarms CLEAR: Verify the following alarms CLEAR:

AR-114-CO1 HPCl TURB EXH VAC BKR AR-114-CO1 HPCl TURB EXH VAC HV-155-FO75 NOT FULLY OPEN. BKR HV-155-FO75 NOT FULLY OPEN.

AR-114-DO1 HPCl TURB EXH VAC BKR AR-I 14-DO1 HPCl TURB EXH VAC HV-155-F079 NOT FULLY OPEN. BKR HV-155-FO79 NOT FULLY OPEN.

24 Place HPCl System in service feeding reactor vessel Places HPCl TURBINE FLOW as follows: CONTROL FC-E41-1R600 in MANUAL set for minimum.

Place HPCl TURBINE FLOW CONTROL FC-E41-1R600 in MANUAL set for minimum.

FAULT STATEMENT WHEN THE STOP VLV FV-I5612 AUTOMATICALLY OPENS IN THE NEXT STEP, A STEAM LEAK DEVELOPS IN HPCI EQUIPMENT ROOM.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

>(

PERFORMANCECHECKLIST Page 11 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments

+25 Close HPCl TURBINE AUXILIARY OIL PUMP IP213 Directs NPO to CLOSE Breaker BREAKER 1D274031. 1D274031.

EVALUATOR CUE:

Role-play NPO and acknowledge the request.

BOOTH OPERATOR CUE:

Insert pfs 4 MRF DC188128 CLOSE to CLOSE the Aux Oil Pump breaker.

EVALUATOR CUE:

Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP IP213 BREAKER ID274031 is CLOSED.

26 Observe: Verifies RED light LIT and AMBER light NOT LIT for the following:

HPCl AUXILIARY OIL PUMP 1P213 STARTS.

HPCI AUXILIARY OIL PUMP 1P213 HPCI INJECTION HV-155-FO06 OPENS.

HPCl INJECTION HV-155-FO06

  • Critical Step #Critical Sequence STCP-PA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCt CHECKLIST Page 12 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

~~

Step Action Standard Eva1 Comments EVALUATOR NOTE:

The steam leak should cause the below annunciators to alarm, the candidate should respond to the alarms and isolate the leak by CLOSING HV-155-F002 and F003 HPCl Steam Isolation valves.

EVALUATOR NOTE:

Candidate may CLOSE HV-155-FO02 and F003 HPCl Steam Isolation valves based on degrading plant conditions PRIOR to performing alarm response procedure.

27 Respond to annunciator on AR-114 Acknowledges:

AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP AND AND AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP

  • Critical Step #Critical Sequence STCP-QA-1250 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

i>' i I"'%

PERFORMANb CHECKLIST Page 13 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments 2% Observe STM SUPPLY Isolation valves not closed Checks:

STM SUPPLY IB IS0 HV-155-F002 AND STM SUPPLY OB IS0 HV-155-F003 Red lights LIT Amber lights NOT LIT 4~29 Isolates HPCl steam supply valves. Places control switches STM SUPPLY 16 IS0 HV-155-FO02 AND STM SUPPLY OB IS0 HV-155-FO03 to CLOSE Verifies:

Red lights NOT LIT Amber lights LIT Inform the Unit Supervisor that HPCl is isolated due to a steam leak.

EVALUATOR CUE:

Role-play the Unit Supervisor and acknowledge the report.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANL, CHECKLIST Page 14 of 14 Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step Action Standard Eva1 Comments EVALUATOR CUE:

That completes this JPM

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 ( 9 ~ 3 )

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A. Due to an inadvertent initiation, HPCl has been manually isolated.

B. After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCI is now required to maintain vessel inventory.

INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam As Given 1of2

TASK CONDITIONS

.--- A. Due to an inadvertent initiation, HPCl has been manually isolated.

B. After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.

INITIATING CUE Recover from the HPCI System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE v

APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 57.0P.001 .I02 0 07/22/04 262002 A4.01 2.813.1 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS ID656 and the Alternate power supply IAW with OP-I 57-001 Computer and Vital UPS.

Completed By: Reviews:

Russ Halm 07/22/04 Writer Date InstructorNVriter Date Approval:

Requesting Supv.1C.A. Date Nuclear Trng. Supv. Date Head 25 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of1 File No. A14-5B 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 57.0P.001 .I02

1. SAFETY CONSIDERATIONS

.5..-

A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 57-001 COMPUTER AND VITAL UPS Revision 13 III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A. Unit Iis in a Refueling Outage.

B. Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C. Computer UPS 1D656 is de-energized.

D. Maintenance has been completed and all clearance orders have been removed.

V. INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS 1D656 IAW with OP-I 57-001 Computer and Vital UPS.

VI. TASK STANDARD Computer Distribution Panels 1Y619 and 1Y620 energized, Computer UPS 1D656 energized and Alternate power supply breaker CB-7 closed.

VII. TASK SAFETY SIGNIFICANCE

--- Provides reliable power supply to Vital instrumentation bus.

2004 NRC Exam As Given

i (

PERFORMANCE CHECKLIST Page 3 of 12 Appl. TolJPM No.: 57.0P.001.102 Student Name:

Action Standard Comments EVALUATOR NOTE:

0 This JPM must be performed in the plant.

0 Obtain permission from Shift Manager to perform this JPM.

0 Ensure the following material is available to support performance of this JPM:

0 A copy of the latest revision of OP-I 57-001, Computer and Vital UPS.

1 Obtain a controlled copy of OP-157-001 COMPUTER Controlled copy of OP-I 57-001 AND VITAL UPS COMPUTER AND VITAL UPS obtained.

2 Selects the correct section to perform. Selects section 3.1

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCk CHECKLIST Page 4 of 12 Appl. To/JPM No.: 57.0P.001.102 Student Name:

Step Action Standard Eva1 Comments

~ _ _

Review the prerequisites. Ensures all prerequisites have been met.

DC power available in accordance with OP-I 88-001.

AC power available in accordance with OP-I 05-001.

Following UPS breakers Open:

CB-1 Battery Input Breaker CB-8 Heater Breaker (remains open)

CB-2 System Output Breaker CB-4 Alternate Source AC Input to Static Switch Breaker CB-7 DCS Output Breaker CB-6 Alternate Source AC Input Bkr CL-157-0011 complete EVALUATOR CUE:

All prerequisites have been met Reviews precautions Reviews precautions

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i" PERFORMANkr CHECKLIST Page 5 of 12 i'

Appl. To/JPM No.:57.0P.001 .I02 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

Meter select switches SW3, SW2, SW4, and SW5.

Must be in a position OTHER THAN OFF in order to get indication on A I (SW3), V I (SW2), V3 (SW4) and A3 (SW5). If the candidate requires a reading from any of these meters, provide a response of 0 if the appropriate switch is in a position OTHER THAN OFF.

++5 DEPRESS and HOLD Pre-Charge push button: Depresses and holds the Pre-Charge Pushbutton.

AND OBSERVE Pre-Charge light ILLUMINATES Verifies:

OBSERVE voltage indicated on Voltmeter V2 increases >250 VDC.

Pre-Charge light LIT Voltage indicated on Input Voltage V2 meter increases >250 VDC.

EVALUATOR CUE:

Pre-Charge light LIT Voltage indicated on Input Voltage V2 is 260 VDC.

++CriticalStep #Critical Sequence STCP-OA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

il PERFORMA~L CHECKLIST Page 6 of 12 "

Appl. To/JPM No.: 57.0P.001 .I 02 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

When CB-1 is closed:

PLIO Closed light illuminates.

PL9 Open light extinguishes.

PL17 Static inverter DC ON Sync light illuminates.

Input Voltage V2 increases to battery voltage - 268 VDC 0 Computer UPS inverter voltage V I increases to 208 volts if SW2 is in a position OTHER THAN OFF F I Frequency increases to 60 Hertz.

t 6 CLOSE Battery Input Breaker CB-1 Places CB-1 Battery Input Breaker to close position (Lifts it up).

7 RELEASE Pre-Charge push button. Releases Pre-Charge push button.

8 OBSERVE DC bus voltage on Voltmeter V2 - 268V Checks Input Voltage V2 meter DC.

- 268V DC.

EVALUATOR CUE:

Input Voltage V2 meter is 270V DC.

  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

i' PERFORMANCE CHECKLIST Page 7 of 12 Appl. To/JPM No.: 57.0P.001.102 Student Name:

Action Standard Eva1 Comments 9 OBSERVE inverter output voltage on Voltmeter V I Checks:

-208V AC.

Output Voltage V I Computer UPS Inverter Voltage meter -208V AC.

EVALUATOR CUE:

Output Voltage V I Computer UPS Inverter Voltage meter is 208V AC.

10 OBSERVE Inverter output frequency on Frequency Checks:

Meter F1- 60 HZ.

Frequency F1 meter - 60 HZ.

EVALUATOR CUE:

Frequency F1 meter is 60 HZ.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCE CHECKLIST Page 8 of 12 Appl. To/JPM No.: 57.0P.001 .IO2 Student Name:

Step Action Standard Comments EVALUATOR NOTE:

When CB-6 is closed:

0 PL14 illuminates.

PL13 extinguishes.

PL16 illuminates.

0 V4 Input voltage increases to 480 VAC.

0 Output Voltage V3 Voltmeter increases to 208 VAC if SW4 is in any position OTHER THAN OFF.

0 Frequency F3 meter increases to 60 Hertz.

  • I1 CLOSE Altei late Source AC Input Breaker CB-6. Places CB-6 Alternate Source AC Input Bkr to the close position (Lifts it up) 12 OBSERVE input voltage on Voltmeter V4 - 480V AC. Verifies:

Input Voltage V4 meter 480V AC.

EVALUATOR CUE:

Input Voltage V4 meter is 480V AC.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

f /;

PERFORMAN& CHECKLIST Page 9 of 12 Appl. To/JPM No.: 57.0P.001.102 Student Name:

Step Action Standard Eva1 Comments 13 CHECK output voltage on Voltmeter V3 - 208V AC. Checks:

Output Voltage V3 meter - 208V AC.

EVALUATOR CUE:

Output Voltage V3 meter is 208V AC.

14 CHECK output frequency on Frequency Meter F3 - Checks:

60 HZ.

Frequency F3 meter - 60 HZ.

EVALUATOR CUE:

Frequency F3 meter is 60 HZ.

EVALUATOR NOTE:

When CB-4 is closed:

0 PL8 illuminates.

0 PL7 extinguishes.

0 PL3 Sync Potential light illuminates.

  • I5 CLOSE Alternate Source AC Input to Static Switch Places CB-4 Alternate Source AC Input Breaker CB-4. to Static Switch Breaker to close (Lifts it UP).
  • Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{:

PERFORMANL CHECKLIST Page 10 of 12 Appl. To/JPM No.: 57.0P.001.102 Student Name:

=

Step Action Standard Eva1 Comments 16 CHECK Sync Potential light PL3 ILLUMINATES. Checks:

Sync Potential PL3 light-LIT.

EVALUATOR CUE:

Sync Potential PL3 light-LIT 17 CHECK Manual Bypass Switch selected to NORMAL Verifies:

MODE by observing Normal Mode indicator light PL6 Manual Bypass Switch Normal Mode ILLUMINATED. PL6 light-LIT.

EVALUATOR CUE:

Normal Mode PL6 light-LIT

  • I8 DEPRESS Inverter To Load push button PBI Depresses:

Inverter To Load PBI push button 19 OBSERVE Indicator Light PL1 ILLUMINATES. Verifies:

Inverter Supply PLI light LIT EVALUATOR CUE:

Inverter Supply PL1 light LIT

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Page 11 of 12 Appl. To/JPM No.: 57.0P.001 .I 02 Student Name:

Step Action Standard Eva1 Comments 20 If Alternate Power Source was in Service, Checks:

OBSERVE PL2 EXTINGUISHES. Alternate Supply PL2 light - NOT LIT.

EVALUATOR CUE:

Alternate Supply PL2 light - NO LIT a21 CLOSE Output Breaker CB-2. Places CB-2 System Output Breaker to close (Lifts it up)

EVALUATOR CUE:

If necessary, Role-play the supervisor and inform the candidate that it is desired to close all load breakers on panels 1Y619 and 1Y620 in the next step.

22 CLOSE desired instrument load breakers on Closes all breakers on the following two appropriate panel(s): panels:

Panels 1Y619 and 1Y620 for Computer UPS. 1Y620 120V AC Computer UPS Distribution Panel AND 1Y619 120V AC Computer UPS Distribution Panel a23 On Computer UPS only, CLOSE or CHECK CLOSED Places CB7 DCS Output Breaker to DCS output breaker CB7. close.

  • Critical Step #Critical Sequence STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCE CHECKLIST Page 12 of 12 1(

Appl. To/JPM No.: 57.0P.001 .I02 Student Name:

Step Action Standard Eva1 Comments 24 ENSURE Inverter load indicated on Ammeter A I : Checks:

I 208 amps for Computer Inverter. Computer UPS Inverter Amps A I meter I208 amps EVALUATOR CUE:

Computer UPS Inverter Amps A I ammeter is 50 amps EVALUATOR CUE:

This completes the JPM

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS v

A. Unit 1 is in a Refueling Outage.

B. Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C. Computer UPS 1D656 is de-energized.

D. Maintenance has been completed and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels lY619 and 1Y620 with Computer UPS 1D656 IAW with OP-157-001 Computer and Vital UPS.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS

- Y -

A. Unit 1 is in a Refueling Outage.

B. Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C. Computer UPS 1D656 is de-energized.

D. Maintenance has been completed and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS 1D656 IAW with OP-157-001 Computer and Vital UPS.

\--

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET i--

SIR0 58.0P.006.251 0 0 1107104 212000 A I .01 2.812.9 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. WA Task

Title:

Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 Completed By: Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv.1C.A. Date Nuclear Trng. Supv. Date Head 20 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

-v- JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 File No. A14-5B 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SIR0 58.0P.006.251

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-258-001, RPS System (Rev. 25)

III. REACTIVITY MAN1PULATlONS This JPM satisfies the requirements of Operational Activity(s):

NONE

=-

IV. TASK CONDITIONS A. Reactor Startup preparations are in progress on Unit 2.

B. RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

V. INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

VI. TASK STANDARD RPS MG set A is running and EPA breakers are closed.

VII. TASK SAFETY SIGNIFICANCE Provides a reliable, regulated power source to the reactor protection system.

\--

2004 NRC Exam As Given

i' i PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: 58.0P.006.251 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the plant.

0 Obtain permission from Shift Manager to perform this JPM.

0 Ensure the following material is available to support performance of this JPM:

A copy of the latest revision of OP-258-001, RPS System.

EVALUATOR NOTE:

The following conditions exist:

0 Motor On light (red) is EXTINGUISHED.

e Motor Off light (green) is ILLUMINATED.

0 Generator Output breaker (on the MG Set) is open.

0 The MG voltmeter and ammeter indicate 0.

0 Both EPA breakers (2CBSOO3A-A and 2CBS003A-C) are open.

0 All four red indicating lights on the EPA breakers are extinguished.

1 Obtain a controlled copy of OP-258-001. Controlled copy obtained.

2 Selects the correct section to perform. Selects section 2.1 3 Review the prerequisites. Ensures all prerequisites have been met.

4 Reviews precautions Reviews precautions

=

+Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCt CHECKLIST Page 4 of 10 Appl. To/JPM No.: 58.0P.006.251 Student Name:

Step Action Standard Eva1 Comments 5 Start RPS M-G Set 2S237N2G201A from local Loosens locking device set screw.

control panel 2G201A located on top of M-G Set as follows: Rotates the potentiometer to the full Unlock AND Rotate Voltage Adjust potentiometer to CCW position.

FULL COUNTER-CLOCKWISE position EVALUATOR NOTE:

Motor has automatic reset of thermal overloads. If motor fails to come up to speed, thermal overloads should be allowed time to reset prior to initiating another start sequence.

t6 Depress AND Hold Motor On push button. Depresses and holds the Motor On pushbutton.

7 WHEN Motor On red indicating light ILLUMINATES, Verifies:

Release Motor On push button. The red Motor On light - LIT EVALUATOR CUE:

The red light above the Motor On pushbutton -LIT Releases the Motor On pushbutton 8 Observe M-G Set comes up to speed Verifies:

M-G set begins to rotate by visible observation of shaft or audible noise of shaft beginning to rotate

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i i' PERFORMAN& CHECKLIST Page 5 of 10 Appi. To/JPM No.: 58.0P.006.251 Student Name:

Action Standard Eva1 Comments

~

EVALUATOR CUE:

Shaft is rotating and/or it can be heard to starting to rotate EVALUATOR NOTE:

The Motor On pushbutton must be depressed again in order to reset the overvoltage trip. There is no visible indication that it has reset.

Reset OV relay by Depressing Motor ON push Depresses:

button. Motor On pushbutton.

Adjust voltage output to 120V AC using Voltage Checks:

Adjust potentiometer. RPS M-G Set A Voltmeter to determine existing voltage EVALUATOR CUE:

Inform the candidate that RPS M-G set A Voltmeter is I 1 0 Volts While observing the RPS M-G Set A Voltmeter:

Turns the Voltage Adjust potentiometer clockwise until 120 volts is observed.

EVALUATOR CUE:

inform the candidate that the voltage is 120 Volts Lock Voltage Adjust potentiometer. Tightens the locking set screw on the Voltage adjust potentiometer.

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i' i

\,

PERFORMANL CHECKLIST Page 6 of 10 Appl. To/JPM No.: 58.0P.006.251 Student Name:

Step Action Standard Eva1 Comments

  • I3 Close Generator Output breaker located on local Places the Generator Output breaker to control panel 2G201A. the ON position (Lifts it up).

EVALUATOR NOTE:

When the Generator Output Breaker is closed. the red Motor Gen Power IN light on EPA Panel 2CBS003 A-A will illuminate.

14 Check Input Power Available red light ILLUMINATES Verifies:

at EPA breaker 2CBS003A-A. Motor Gen Power IN red light LIT (on 2CBS003A-A)

EVALUATOR CUE:

Motor Gen Power IN red light LIT 15 Close M-G set EPA breakers per section 2.2 of this procedure.

16 Selects the correct section to perform. Selects section 2.2 EVALUATOR NOTE:

Performance of the next step will require the use of a key for the Keylock switch. These keys are readily available to the operators. They can be obtained from the control room or FUS office if necessary. The use of this key will be SIMULATED for this JPM. (Key would normally be obtained during the pre-job brief).

17 Review the prerequisites. Ensures all prerequisites have been met.

  • Critical Step #Critical Sequence STCP-QA-1250 Rev.2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{'

PERFORMANCECHECKLIST Page 7 of 10 Appl. TolJPM No.: 58.0P.006.251 Student Name:

~~

Step Action Standard Eva1 Comments

  • I8 Close EPA breaker 2CBS003A-A as follows: inserts key into keylock switch AND Momentarily places Oper/Bkr Momentarily Place Oper/Reset Switch to RESET for Trip/Reset switch to RESET.

EPA breaker 2CBS003A-A. (on 2CBS003A-A)

FAULT STATEMENT:

THE UNDERVOLTAGE LIGHT WILL REMAIN LIT IN THE FOLLOWING STEP. THIS WILL REQUIRE THE CANDIDATE TO MOMENTARILY PLACE THE OPEWBKR TRIP/RESET SWITCH TO RESET, A SECOND TIME, FOR EPA BREAKER 2CBSOO3A-A.

19 Confirm overvoltage, undervoltage and Verifies:

underfrequency lights are NOT ILLUMINATED. Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT EVALUATOR CUE:

Overvoltage, and Underfrequency lights are NOT LIT Undervoltage light is LIT

  • 20 IF any of the three lights are ILLUMINATED;

- Momentarily places Oper/Bkr Trip/Reset switch to RESET.

Momentarily Place Oper/Reset Switch to RESET for (on 2CBS003A-A)

EPA breaker 2CBS003A-A.

Verifies Undervoltage light is NOT LIT

  • Critical Step #Critical Sequence STCP-OA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i:

PERFORMANCt CHECKLIST Page 8 of 10 I,(

Appl. To/JPM No.: 58.0P.006.251 Student Name:

Step Action Standard Eva1 Comments EVALUATOR CUE:

Undervoltage light is NOT LIT 521 Place OpedReset Switch to OPER for EPA breaker Places Oper/Bkr Trip/Reset switch to 2CBS003A-A. OPER.

(on 2CBS003A-A) 522 Close EPA breaker 2CBS003A-A. Places RPS MG Set EPA BKR to ON position (Lifts it up)

(on 2CBS003A-A) 23 Check Input Power Available red light ILLUMINATES Verifies:

at EPA breaker 2CBSOO3A-C Motor Gen Power IN red light LIT (on 2CBSOO3A-C)

EVALUATOR CUE:

Motor Gen Power IN red light LIT at EPA breaker 2CBS003A-C EVALUATOR NOTE:

Performance of the next step will require the use of a key for the Keylock switch. These keys are readily available to the operators. They can be obtained from the control room or FUS office if necessary. The use of this key will be SIMULATED for this JPM. (Key would normally be obtained during the pre-job brief).

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i,' j/ t, PERFORMANCr CHECKLIST Page 9 of 10 Appl. To/JPM No.: 58.0P.006.251 Student Name:

Step Action Standard Eva1 Comments 524 Close EPA breaker 2CBS003A-C as follows: Inserts key into keylock switch AND Momentarily places Oper/Bkr Momentarily Place Oper/Reset Switch to Reset for Trip/Reset switch to RESET.

EPA breaker 2CBS003A-C. (on 2CBS003A-C) 25 Confirm overvoltage, undervoltage and Verifies:

underfrequency lights are NOT ILLUMINATED. Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT EVALUATOR CUE:

Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT

  • 26 Place Oper/Reset Switch to OPER for EPA breaker 2CBS003A-C.

Places Oper/Bkr Trip/Reset switch to OPER.

(on 2CBS003A-C) 527 Close Electrical Protection Assembly (EPA) series Places RPS MG Set EPA BKR to ON breaker 2CBSOO3A-C. position (Lifts it up)

(on 2CBS003A-C) 28 At Reactor Control Rod Test Instrument Panel Candidate simulates Contacting Unit 2 2C610, Check Generator A Feed to RPS Bus A white Control room PCO to confirm white light indicating Iight ILLUMINATED. illuminated for Generator A Feed to RPS Bus A.

EVALUATOR CUE:

Role-play Control room PCO and inform candidate that Generator A Feed to RPS Bus A white indicating light is LIT

  • Critical Step #Critical Sequence STCP-QA-12SB Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

0 7

Y-O 0

Y a,

03 m

a I

a 7

TASK CONDITIONS A. Reactor Startup preparations are in progress on Unit 2.

B. RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

2004 NRC Exam As Given 1of2

TASK CONDITIONS 5u-A. Reactor Startup preparations are in progress on Unit 2.

B. RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 56.0P.006.201 0 0 1/07/04 201002 K1.06 3.213.3 Appl. To JPM Number Rev. No. Date NUREG 1123 Sys. No. KIA Task

Title:

Bypass Control Rod at Rod Drive Control Cabinet (RDCC) OP-256-001 Completed By: Russ Halm Reviews:

Writer Date InstructorNVriter Date Approval :

Requesting Supv./C.A. Date Nuclear Trng. Supv. Date Head 10 Date of Performance: Allowed Time (Min.) Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I. Employee #/S.S. #

Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uat ion:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 File No. A14-58 2004 NRC Exam As Given

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE

--_- SlRO 56.0P.006.201 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-256-001, Reactor Manual Control System (RMCS) (Revision 13) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

NONE IV. TASK CONDITIONS A. Unit 2 startup is in progress.

B. It has been determined a fault has occurred with control rod 10-31,requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

V. INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

VI. TASK STANDARD Control rod 10-31 is bypassed and RMCS is restarted.

VII. TASK SAFETY SIGNIFICANCE Potential inadvertent reactivity addition 2004 NRC Exam As Given

1,  :

PERFORMANL CHECKLIST Page 3 Of 7 Appl. To/JPM No.: 56.0P.006.201 Student Name:

Step Action Standard Eva1 Comments EVALUATOR NOTE:

0 This JPM must be performed in the plant.

0 Obtain permission from Shift Manager to perform this JPM.

0 Ensure the following material is available to support performance of this JPM:

0 A copy of the latest revision of OP-256-001.

I Obtain a controlled copy of OP-256-001. Controlled copy obtained.

2 Selects the correct section to perform. Selects section 2.7 3 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the candidate all prerequisites have been met.

4 Review all precautions. Follows all precautions as applicable.

  • 5 Using Fault Location Map on analyzer section of Determines Binary Coordinate Code Rod Drive Control Instrument Panel 2C616, Upper for Control Rod 10-31 is:

Relay Room Determine Binary Coordinate code for 00100 01001 control rod to be bypassed.

EVALUATOR NOTE:

2C616 is located in Upper Relay Room.

Toggle switches are located on lower right hand side of the analyzer section.

%Critical Step #Critical Sequence STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(I PERFORMANCE CHECKLIST Page 4 of 7 Appl. TolJPM No.: 56.0P.006.201 Student Name:

Step Action Standard Eva1 Comments

  • 6 At analyzer section of Panel 2C616, Position Using Bypassed Rod Bypassed Rod Identify switches corresponding to Identity switches, inserts Binary Coordinates in UP position for values of 1 Binary Code 00100 01001 and in DOWN position for values of 0.

EVALUATOR NOTE:

UP position for values of 1 DOWN position for values of 0 7 At Analyzer section of Panel 2C616, position Places Bypassed Switch in UP Bypassed Switch in UP position position.

8 Observe ROD BYPASS light ILLUMINATESat Rod Candidate simulates a call to the Selection Motion Control section of Unit Operating control room and requests the PCO to Benchboard 26651, when the bypassed control rod perform the following:

is selected.

Select bypassed control rod.

Observe ROD BYPASS light ILLUMINATED Observe rod selection pushbutton lamps ILLUMINATED Observe green rod select lamp on full core display NOT ILLUMINATED.

  • Critical Step #Critical Sequence STCP-QA-12.56 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCt CHECKLIST Page 5 of 7 Appl. To/JPM No.: 56.0P.006.201 Student Name:

~~

Step Action Standard Eva1 Comments EVALUATOR CUE:

0 When the candidate indicates he would call the Control Room to verify the Rod Bypass light is illuminated on 2C651 Role-play the control room PCO and inform himlher the Bypassed control rod is SELECTED 0 ROD BYPASS light ILLUMINATED 0 Rod selection pushbutton lamps ILLUMINATED Green rod select lamp on full core display NOT ILLUMINATED.

9 Notify following control rod bypassed: Candidate simulates a call to Reactor Engineering and I & C to notify them Reactor Engineering that the control rod is bypassed.

I&C EVALUATOR CUE:

Role-play Reactor engineering and I &C and acknowledge the report.

IO IF Control Rod bypassed due to a fault or Candidate determines that restarting component failure, Restart RMCS in accordance RMCS is appropriate based on the with section 2.1 of this procedure. JPM initial conditions, which stated there was a fault.

  • Critical Step #Critical Sequence STCP-CIA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

j' i Page 6 of 7 PERFORMANCE CHECKLIST Appl. To/JPM No.: 56.0P.006.201 Student Name:

Step Action Standard Eva1 Comments EVALUATOR CUE:

If necessary, Role-play shift supervision and inform the candidate that it is desired to restart RMCS.

11 Selects the correct section to perform. Selects section 2.1 12 Review the prerequisites. Ensures all prerequisites have been met.

EVALUATOR CUE:

Inform the candidate all prerequisites have been met.

  • I3 At Rod Drive Control Instrument Panel 2C616, Depresses and Holds:

Upper Relay Room, Depress and Hold RDCS RDCS Status Reset pushbutton for Status Reset push button for minimum of 2 minimum of 2 seconds.

seconds.

EVALUATOR NOTE:

LED's in the next step are located at the very bottom of the analyzer panel.

14 Observe Test Counter of Phase Generator Sub Verifies the following:

Test 0, 1, & 2 LED's on analyzer section of Panel 2C616 CYCLING. Sub Test 0, 1, & 2 LED's blinking ON and OFF EVALUATOR CUE:

Sub Test 0,1, & 2 LEDs ARE blinking ON and OFF

  • Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{' 4,'

PERFORMAN'L CHECKLIST Page7of7 'I Appl. To/JPM No.: 56.0P.006.201 Student Name:

Step Action Standard Eva1 Comments 15 Check no lighted LED's on Fault Location Map on Verifies ALL Fault Location Map LED's analyzer section of Panel 2C616. are NOT LIT EVALUATOR CUE:

ALL Fault Location Map LED's are NOT LIT 16 Observe no control rod test failures by allowing Waits 5 minutes and then Verifies ALL Reactor Manual Control System to cycle its tests Fault Location Map LED's are NOT for five minutes. LIT EVALUATOR CUE:

5 minutes has passed and ALL Fault Location Map LED's are NOT LIT EVALUATOR CUE:

This completes the JPM.

%Critical Step #Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A. Unit 2 startup is in progress.

B. It has been determined a fault has occurred with control rod 10-31, requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

2004 NRC Exam As Given Io f 2

TASK CONDITIONS A. Unit 2 startup is in progress.

B. It has been determined a fault has occurred with control rod 10-31, requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

2004 NRC Exam As Given 2 of 2