ML042750525

From kanterella
Jump to navigation Jump to search
Final Section B Operating (RO & SRO) (Folder 3)
ML042750525
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/09/2004
From: Roush K
PPL Generation
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-387/04-302, 50-388/04-302
Download: ML042750525 (130)


Text

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility:

SUSQUEHANNA Date of Examination: 8/09-8/13 2004 Exam Level (circle one): RO Operating Test No.:

N/A Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function 202002 A2.05 3.1/3.1 64.OP.007.151 Reset the Fluid Drive Scoop Tube Lock (OP-164-001)

D, A, S 1

261000 A3.01 3.2i3.3 Perform a Manual Startup of the SGTS in Accordance With OP-070-001 9

264000 A4.04 3.713.7 Manually Synchronize Diesel Generator A to 4.16KV Bus I A from Panel OC653 in Accordance With OP-024-001 6

295028 EA1.03 3.9/3.9 Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions) 7 295037 EA1. I 1 3.543.6 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-00 1 )

5 2

259001 A2.07 3.713.8 Perform Switching Feedwater Level Control 45.OP.013.151 (OP-145-001) 29501 8 AA1.03 3.3/3.4 Place Standby RBCCW Pump In Service IAW OP-114-001 (Pump casing drain line leak develops)

N, A, s 8

206000 A4.13 4.1/4.0 Recovery from a Manual Closure of HPCl Isolation Valves With an Initiation Signal Present With a Steam Leak Developing. (OP-152-001)

D, E, A, S 4

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 212000 AI.01 2.8/2.9 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 E M, R, A 7

201 002 K1.06 3.2/3.3 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

EIA, M 1

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator,

--l (L)ow-Power, (R)CA, (E/A)Emergency/Abnormal, (E)SF NUREG-1021, Draft Rev 9 2004 NRC Exam As Given Susquehanna Facsimile

System / JPM Title Type Code*

201 002 K1.06 3.2/3.3 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

E/A, M 1

ES-301 Control Room/ln-Plant Systems Outline Form ES-30 1 -2 Facility:

SUSQUEHANNA Date of Examination: 8/09-8/13 2004 11 Exam Level (circle one): SR0-I Operating Test No.:

N/A Safety Function 202002 A2.05 3.V3.1 64.OP.007.151 Reset the Fluid Drive Scoop Tube Lock (OP-I 64-001)

I 9

261000 A3.01 3.213.3 Perform a Manual Startup of the SGTS in Accordance With OP-070-001

~~

264000 A4.04 3.7/3.7 6

Manually Synchronize Diesel Generator "A" to 4.1 6KV Bus 1A from Panel OC653 in Accordance With OP-024-001 295028 EA1.03 3.9/3.9 Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions) 7 295037 EA1.I1 3.5/3.6 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-001) 5 29501 8 AA1.03 3.313.4 Place Standby RBCCW Pump In Service IAW OP-I 14-001 (Pump casing drain line leak develops) 8 206000 A4.13 4.114.0 Recovery from a Manual Closure of HPCl Isolation Valves With an initiation Signal Present With a Steam Leak Developing. (OP-152-001)

D, E, A, S

~

4 In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 M

6 21 2000 AI.01 2.8/2.9 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 I

I

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA, (E/A)Emergency/Abnormal, (E)SF NUREG-1021, Draft Rev 9 2004 NRC Exam As Given Susquehanna Facsimile

ES-30 1 Control Room/ln-Plant Systems Outline Form ES-30 1 -2 Facility:

SUSQUEHANNA Date of Examination: 8/09-8/13 2004 Bypass Control Rod at Rod Drive Control Cabinet (RDCC) (OP-256-001)

)I Exam Level (circle one): SRO-U Operating Test No.:

N/A Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

System / JPM Title 261 000 A3.01 3.2/3.3 Perform a Manual Startup of the SGTS in Accordance With OP-070-001 295037 EA1. I 1 3.93.6 Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG (OP-I 84-001)

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) 262002 A4.01 2.8/3.1 Place The Vital AC Uninterruptible Power Supply AC System In Service In Accordance With OP-I 57-001 212000 AI.01 2.8/2.9 Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 Type Code*

M E M, R, A E/A, M

~

Safety Function 9

5 6

7 1

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator,

( L )ow-Power, ( R) C A, ( E/A) E me rg e n cy/A b no r mal, (E) S F NUREG-1021, Draft Rev 9 2004 NRC Exam As Given Susquehanna Facsimile

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET 3.1/3.1 S/RO 64.0P.007.151 I

02/11/04 202002 A2.05 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Reset A Fluid Drive Scoop Tube Lock IAW OP-I 64-001 Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Date Head Date of Performance:

JPM Performed By:

10 Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

)

Unsatisfactory Eva I ua t i on :

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9/93)

Page 1 of 1 2004 NRC Exam As Given File No. A14-56

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SIR0 64.0P.007.151

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 64-001, Reactor Recirculation System (Revision 38)

II I. REACTIVITY MAN I P U LATIONS This JPM satisfies the requirements of Operational Activity(s):

34 Reset Recirculation Scoop Tube Lock IV. TASK CONDITIONS L

A.

The plant is in Mode I

@ 95 % power.

B. Scoop Tube Lock has occurred on B Recirc MG Set.

C.

The condition which caused the Scoop Tube Lock has been corrected.

D. Manual Control has NOT been taken at the positioner V. INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

VI. TASK STANDARD B Recirculation MG Scoop Tube Lock is reset, then re-locked when speed is determined to be increasing rapidly.

VII. TASK SAFETY SIGNIFICANCE Potential Unanticipated positive reactivity addition 2004 NRC Exam As Given

Appl. To/JPM No.: 64.0P.007.151 lstep r

PERFORMAN& CHECKLIST Action EVALUATOR NOTE:

Establish task conditions as directed on attached setup instructions.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

When student is ready to begin JPM, place the simulator in RUN.

0 Simulator Setup Select any MODE 1 100% IC.

0 Place Simulator in RUN 0

Manually runback recirc flow to achieve 95%

power 0

Run batch file RRB.STLBJPM.

0 Depress B Reactor Recirc Controller INCREASE pushbutton to ensure controller is saturated.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Eva1

(

Page 3 of 8 Comments STCPUA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 64.0P.007.151 Step

(,

PERFORMANL, CHECKLIST Page4of8 Action Simulator Operator Select Recirc Screen RR6.

0 AND 0

Servo Controller Demand XI-14032B.

As NPO, direct student to change demand until signals are matched.

During this JPM you will be required to ROLE play as the in plant NPO at the scoop tube positioner.

Monitor Tachometer Generator Speed 3-1 4032B Obtain a controlled copy of OP-164-001, Reactor Recirculation System Select the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

Review all precautions.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Controlled copy obtained.

Selects section 2.6 Ensures all prerequisites have been met.

Follows all precautions as applicable.

Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i Appl. To/JPM No.: 64.0P.007.151 Step PERFORMANCE CHECKLIST Action ENSURE Reactor Recirculation Pump B Speed Controller SY-B31-1 R621 B is in MANUAL OBSERVE White indicator light above Scoop Tube B LOCK OR RESET HS-B31-1 S03B pushbutton ILLUMINATED REMOVE the enclosure cover from the amplifier at 1 CB137B and ESTABLISH communication between the Control Room and the scoop tube positioner /

amplifier.

EVALUATOR CUE:

Role-play as NPO at scoop tube positioner, report that enclosure cover is removed.

4Critical Step

  1. Critical Sequence Student Name:

Page 5 of 8 Standard Verifies:

Reactor Recirculation Pump B Speed Controller SY-B31-1 R621 B AMBER MANUAL light LIT Verifies:

White indicator light above Scoop Tube pushbutton LIT B LOCK OR RESET HS-B31-1 S03B Contacts in plant NPO and directs removal of enclosure cover and Establishes communication between the Control Room and the scoop tube positioner / amplifier.

Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 64.0P.007.151 Step PERFORMAN& CHECKLIST

~~

Action Restoration Of Scoop Tube Lock Without Having Taken Manual Control At Positioner If the scoop tube lockout condition is being reset without having taken manual (i.e. hand crank) control at the positioner 1 SI 37B, perform the following steps:

MATCH the controller demand and scoop tube position signals as displayed at 1 CB137B on the amplifier digital display (see Attachment B), by increasing or decreasing controller SY-B3 -1 R621 B output.

EVALUATOR NOTE:

PlCSY group display STDP 83 may be us1 match speeds d to help BOOTH CUE:

0 0

0 ROLE play as NPO at scoop tube positioner.

Monitor Tach Generator Speed SI-14032B and Servo Controller Demand XI-140328.

Direct student to change demand until signals are matched.

%Critical Step

  1. Critical Sequence Student Name:

Standard Communicates with in plant NPO, and adjusts SY-B31-1 R621 B controller output with the INCREASE and DECREASE pushbuttons until signals match

(

Page 6 of 8 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 64.0P.007.151 Step

  • 9 I O
  • I 1

12 PERFORMAN& CHECKLIST Action FAULT STATEMENT RRP B WILL EXPERIENCE AN UNCONTROLLED SPEED INCREASE AFTER THE SCOOP TUBE LOCK IS RESET.

DEPRESS SCOOP TUBE B LOCK OR RESET HS-B31-1 S03B RESET push button - 4 to 5 seconds (to allow position amplifier timer to clear and reset logic to seal in).

MONITOR GEN 1 B SPEED SI-14032B.

If speed increases rapidly, TRIP scoop tube on affected generator by depressing SCOOP TUBE LOCK OR RESET HS-B3I-lS03B TRIP push button.

Notify Shift Supervision.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Depresses and holds for 4-5 seconds Scoop Tube B Lock Reset pushbutton HS-B31-1 S03B.

Checks:

GEN 1 B SPEED SI-14032B Determines speed is rapidly increasing Depresses SCOOP TUBE LOCK OR button.

Verifies:

GEN 1 B SPEED SI-14032B stops rising RESET HS-B31-1S03B TRIP push Informs Shift Supervision that RRP B has been locked due to uncontrolled speed increase.

Eva1 I

Page 7 of 8 Comments STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. ToIJPM No.: 64.0P.007.151 Step Action Standard 13 At 1C137B REPLACE the cover on the scoop tube position amplifier.

replacing enclosure cover.

Contacts in plant NPO and directs

(

Page 8 of 8 i

PERFORMANLL CHECKLIST Student Name:

Eva1 Comments EVALUATOR CUE:

That completes this JPM

  • Critical Step
  1. Critical Sequence STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS L-A.

B.

C.

D.

The plant is in Mode 1 @ 95 YO power.

Scoop Tube Lock has occurred on IB Recirc MG Set.

The condition which caused the Scoop Tube Lock has been corrected.

Manual Control has NOT been taken at the positioner INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

2004 NRC Exam As Given 1 of2

L' TASK CONDITIONS A.

B.

C.

D.

The plant is in Mode 1 @ 95 % power.

Scoop Tube Lock has occurred on 'B' Recirc MG Set.

The condition which caused the Scoop Tube Lock has been corrected.

Manual Control has NOT been taken at the positioner INITIATING CUE Reset the Fluid Drive Scoop Tube Lock.

2004 NRC Exam As Given 2 o f 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 70.0P.004.151 0

1 / I 6/04 261000 A3.01 3.2/3.3 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

K/A Task

Title:

Perform a Manual Startup of the SGTS in Accordance With OP-070-001 Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Ap prova I :

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Head Date of Performance:

JPM Performed By:

\\--

Date Date 10 Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S. #

Performance Evaluation:

(

)

Satisfactory

(

)

Unsatisfactory Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-56

V REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 70.0P.004.151

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required andlor posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-070-001, Standby Gas Treatment System (Rev. 19)

AR-029-001 SGTS A FILTER TRAIN FAILED (AI I)

(Revision 21) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE u

IV. TASK CONDITIONS A. Unit 1 is operating in Mode 1.

B. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

V. INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A VI. TASK STANDARD Identifies the FAILED CLOSED SGTS MAKEUP OA DMP FD07551A2 damper and secures SGTS Fan OV109A.

VII. TASK SAFETY SIGNIFICANCE Provides the ability to perform HPCl operability surveillance.

2004 NRC Exam As Given

Appl. To/JPM No.: 70.0P.004.151

(

PERFORMANC t CHECKLIST Page 3 of 8 Action EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 Select any Mode 1 100% IC 0

Run batch file IGBSBGTAFAIL When student is ready to begin JPM, place the simulator in RUN.

Obtain a controlled copy of OP-070-001 Standby Gas Treatment System, Select the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

Review all precautions.

At Panel OC681, DEPRESS SGTS Clg OA Dmp HD07555A OPEN pushbutton.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Controlled copy obtained.

Selects section 3.2 Ensures all prerequisites have been met.

Follows all precautions as applicable.

Depresses SGTS CLG OA DMP HD 07555A OPEN pushbutton.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of I 2004 NRC Exam As Given

Appl. To/JPM No.: 70.0P.004.151 Step 6

  • 7 8

PERFORMAN& CHECKLIST i::

Page 4 of 8 Action

~

OBSERVE SGTS Clg OA Dmp HD07555A OPENS to allow suction flow path for start of SGTS Fan A.

At Panel OC681, START Standby Gas Treatment System A by placing selector switch for SGTS Fan OV109A to START.

When Fan starts, OBSERVE flow increases >3000 cfm on SGTS Air Flow FR07553A.

EVALUATOR NOTE:

SGTS Fans may not obtain 10,100 cfm due to insufficient suction flow path through SGTS Makeup OA Dmp FD07551A2.

EVALUATOR NOTE:

Flowrate for this JPM should be (-4,800 CFM)

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies:

Red Light is LIT and Amber Light is NOT LIT for SGTS CLG OA DMP HD 07555A Places selector switch for SGTS FAN OVI 09A to START Verifies:

Red Light is LIT and Amber AND White Lights are NOT LIT Verifies:

increases to greater than 3000 CFM.

SGTS AIR FLOW FR-07553A Eva1 Comments STGP-QA-1250 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 70.0P.004.151 Step 9

I O 11 r;

PERFORMANCL CHECKLIST Action CHECK following positioned as indicated:

SGTS Fan Inlet Dmp HD07552A FULL OPEN.

SGTS A Inlet Dmp HD07553A FULL OPEN.

EVALUATOR NOTE:

When OA DMP FD 07551A2 reaches FULL OPEN it will FAIL CLOSED causing AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED alarm to actuate. Fan OVI 09A will ALSO fail to trip.

SGTS Makeup OA Dmp FD07551A2 MODULATED/OPEN approximately 70 seconds after SGTS Fan OVI 09A started.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies:

Red Light is LIT and Amber Light is NOT LIT for SGTS FAN INLET DMP HD 07552A Verifies:

Red Light is LIT and Amber Light is NOT LIT for SGTS A INLET DMP HD 07553A Approximately 70 seconds after SGTS Fan OV109A started.

Verifies:

SGTS Makeup OA DMP FD 07551A2 BOTH Red Light and Amber Light LIT Eva1 Page5of8 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

PERFORMANCE CHECKLIST Refers to appropriate alarm response procedure.

Page 6 of 8 Selects AR-029-001 (AI 1) SGTS A Appl. To/JPM No.: 70.0P.004.151 Step 12 13 Action Student Name:

Standard FAULT STATEMENT:

OA DMP FD07551A2 fails CLOSED. Fan OV109A will ALSO fail to trip EVALUATOR NOTE:

Candidate may STOP SGTS FAN OV109A before alarms due to loss of suction flowpath. If the candidate stops the fan at this time, it would not be necessary to perform the remaining steps of the AR.

This is acceptable.

AR-029-001 (AI 1) SGTS A FILTER TRAIN FAILED Acknowledges AR-029-001 (AI I ) SGTS A FILTER TRAIN FAILED alarm Eva1 Comments

  • Critical Step STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

  1. Critical Sequence

Appl. To/JPM No.: 70.0P.004.151 Step

  • I 4 15 16 17

(

PERFORMANCE CHECKLIST Page 7 of 8 Action If no initiation signal present, CHECK SGTS FAN OV109A tripped.

CHECK SGTS AIR FLOW & HEPA FlLT PRESS DlFF FR07553A. SGTS AIR FLOW should be approximately 10,100 cfm.

CHECK HIC07555A on Panel OC883A is set at 45.

EVALUATOR CUE:

Role-play as NPO and acknowledge the request.

Inform candidate that HIC07555A is set at 45 CHECK SGTS Fan OV109A supply breaker MCC OBI3601 I, thermal overloads and control power fuse.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

SGTS FAN OV109A red light LIT and Amber light NOT LIT Places control switch for SGTS FAN OV109A to STOP Verifies:

SGTS FAN OVIOSA red light NOT LIT and Amber light LIT Determines not applicable since Fan is tripped Contacts NPO to check HIC07555A is set at 45 Determines not applicable.

Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

{'

PERFORMAN& CHECKLIST Page8of8 '

Appl. To/JPM No.: 70.0P.004.151 Student Name:

Step 18 I 9 20 Action If fan tripped after starting time delay, CHECK fan integrity.

COMPLY with TS 3.6.4.3 and TR 3.6.1 If Zone 3 Secondary Containment Isolation signal present, CONFIRM SGTS FAN OV109A trips when Zone 3 lockout relay XY07553A reset.

EVALUATOR CUE:

This completes the JPM.

Standard Determines not applicable.

Informs supervisor to refer to TS 3.6.4.3 and TR 3.6.1.

Determines not applicable.

Eva1 Comments

  • Critical Step
  1. Critical Sequence STCP-QA-1Z5B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A. Unit 1 is operating in Mode 1.

B. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

INITIATING CUE 1

Your Supervisor directs you to Perform a manual startup of SGTS A.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS

-- A. Unit 1 is operating in Mode 1.

6. The HPCl System is to be started up for surveillance.

C. The SGTS is aligned for automatic initiation in accordance with OP-070-001.

D. All prerequisites are met.

INITIATING CUE Your Supervisor directs you to Perform a manual startup of SGTS A.

2004 NRC Exam As Given 2 o f 2

v PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 24.0P.006.102 1

01/19/04 264000 A4.04 3.7/3.7 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Manually Synchronize Diesel Generator A to 4.1 6 KV Bus I A from Panel OC653 in Accord a nce With 0 P-024-00 1 Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Ap p rova I :

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Head Date of Performance :

JPM Performed By:

Date Date 20 Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

)

Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 24.0P.006.102

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

It. REFERENCES OP-024-001 Diesel Generator (Revision 40)

I II. REACTIVITY MAN1 PU LATlO NS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS

--/

A.

B.

C.

D.

Diesel Generator A was started manually from 06653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

No other diesel generator is operating synchronized to the grid.

A NPO is stationed at the diesel.

Air intake manifold temperatures are being controlled in AUTOMATIC.

V. INITIATING CUE Manually synchronize Diesel Generator A with 4.16 KV Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.

VI. TASK STANDARD Diesel Generator A synchronized to 4.16 KV Bus 1A and loaded to 3600 to 4000 KW without causing any automatic Diesel generator trips to occur.

VII. TASK SAFETY SIGNIFICANCE Verifies operability of a safety related electrical power source.

2004 NRC Exam As Given

\\

Page 3 of 11 i

PERFORMANL, CHECKLIST

(

Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step 1

Action EVALUATOR NOTE:

0 0

This JPM must be performed in the simulator.

Manually start A D/G IAW OP-024-001 section 2.2 MANUAL START OF DIESEL GENERATOR A(B)(C)(D)(E) FROM PANEL 06653 Start A & B ESW pumps Fill out a DG start log for the A DG.

0 0

The following conditions should then exist:

0 DG A Watts - 0 0 DG A Amps - 0 0 DG A Freq - -60 Hz 0 Ready to Run Light illuminated 0 DG A Gov Mode Sel HS-00055A - DROOP DG A Volt Reg Mode Sel HS-00056A - AUTO DG A to Bus 1A Bkr lA20104 - OPEN 0 DG A to Bus 1A Synch Sel HS-00039A - OFF 0 The PMS CRT is displaying the DG electrical screen When student is ready to begin JPM, place the simulator in RUN.

Obtain a controlled copy of OP-024-001 Diesel Generator DG A Volts - -4,200 VAC

  • Critical Step
  1. Critical Sequence Standard Controlled copy obtained.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCE CHECKLIST Appl. To/JPM No.: 24.0P.006.102 Step 2

3 4

Action Selects the correct section to perform.

EVALUATOR NOTE:

Due to the nature of this JPM, it may be necessary to allow the candidate to check the prerequisites and precautions. This is acceptable.

Review the prerequisites.

Review the precautions.

EVALUATOR NOTE:

During synchronizing or load changes, increasing voltage adjust will reduce negative (in) WARS and decreasing voltage adjust will reduce positive (out)

WARS.

EVALUATOR NOTE:

When the sync switch is placed in the ON position the synchroscope pointer will start moving (either direction), the white light on each side of the synchroscope will flash off and on as the pointer rotates.

  • Critical Step
  1. Critical Sequence Student Name:

Page 4 of 11 Standard Selects section 2.3 Ensures that all prerequisites have been met.

Follows the precautions as applicable.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

PERFORMANCt CHECKLIST Page 5 of I 1 i

Appl. To/JPM No.: 24.0P.006.102 Step

  • 5
  • 6 7

Action AFTER diesel generator run unloaded 5 minutes or as required during emergency, Synchronize Diesel Generator A to 4.16KV Bus IA, as follows:

Place DG A to Bus 1A Sync Sel HS-00039A switch to ON.

Adjust DG A Voltage Adjust HS-00053A so red scale 4 KV Diff AC Volts Xl-00036 indicates slightly right of 0 and not exceed 35 volts AC. The Green Band on XI-00036 is the acceptable area.

EVALUATOR NOTE:

The FAST direction on the Synchroscope is clockwise.

Adjust DG A Speed Governor HS-00054A so Synchroscope XI-00037 rotating in FAST (clockwise) direction at - 1 (one) revolution per 60 seconds.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Inserts Key into DG A to Bus I A Sync Sel HS-00039A switch and places in the ON position.

Places the DG A Voltage Adjust HS-00053A switch to the RAISE or LOWER position as required to achieve Green band value on XI-00036.

Places DG A Speed Governor HS-00054A switch to the RAISE or LOWER position to cause the Synchroscope XI-00037 pointer to rotate slowly (approximately I rpm) in the FAST (clockwise) direction.

Eva1 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 24.0P.006.102 Step

+8

+9 PERFORMAN& CHECKLIST Page 6 of 11 Action EVALUATOR NOTE:

When DG A to Bus 1A Bkr 1A20104 breaker is closed in the next step, the following should occur:

0 Both white lights will remain extinguished and the synchroscope pointer will stop at the 12 o'clock position.

0 The Running Idle light will extinguish and the Running Loaded light illuminates on the Local Panel (OC521A).

Close DG A to Bus I A Bkr 1A20104 when synchroscope at or slightly before "1 2 o'clock" position.

Promptly go to RAISE and Slowly increase load to 1000 Kw over a 30-45 second period using DG A Speed Governor HS-00054A switch.

  • Critical Step
  1. Critical Sequence Student Name:

Standard When the Synchroscope XI-00037 pointer is at or slightly before the 12 o'clock position:

Places DG A to Bus 1A Bkr 1A20104 to the closed position Verifies:

Red light LIT and Amber light NOT LIT Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates 1,000 Kw.

Eva1 Comments STCP-QA-1250 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

{

I)/

PERFORMANL CHECKLIST Page 7 of 11 Appl. To/JPM No.: 24.0P.006.102 Student Name:

Step

  • I O 11 12 Action Promptly Position DG A Voltage Adjust HS-00053A to maintain 0 to 900 WARS but as close to 0 on positive side as possible on DG A WARS GVARM on Panel OC519A and/or PlCSY Format Diesel Generator A.

Place DG A to Bus 1A Sync Sel HS-00039A switch to OFF.

AT Diesel Engine Control Panel OC521A, Observe Running Loaded light ILLUMINATED Ensure intake air manifold temperatures maintained in accordance with section 2.15 of this procedure at all times diesel generator operating.

  • Critical Step
  1. Critical Sequence Standard Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A Places DG A to Bus 1A Sync Sel HS-00039A switch to OFF.

Contacts NPO at the Diesel and requests the status of the Running Loaded light AND Instructs NPO to ensure intake air manifold temperatures maintained in accordance with section 2.1 5 of this procedure at all times while diesel generator is operating.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. TolJPM No.: 24.0P.006.102 Step 13 PERFORMANCt CHECKLIST EVALUATOR NOTE:

Role-play the diesel NPO and inform the control room that the Running Loaded light is LIT AND intake air manifold temperatures are being maintained in accordance with section 2.1 5 of this procedure.

IF diesel generator started due to emergency:

Load as required to support plant conditions.

CAUTIO N During each increase, anticipated DG output must not exceed present T-IO (T-20) bus load CAUTION If T-I 0 (T-20) Tap Changer Setpoint of Positive (Out) or Negative (In) I000 WARS is reached for 2 20 seconds, Tap Changer will automatically change tap EVALUATOR CUE:

Inform the candidate that 5 minutes has elapsed.

  • Critical Step
  1. Critical Sequence Student Name:

Page 8 of I 1 Standard Determines Diesel generator was not started due to an emergency based on initial conditions.

Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 24.0P.006.102 Step

  • I 4

(

PERFORMANCt CHECKLIST

(~

Page 9 of 11 Action IF diesel generator started for test or other than emergency condition:

AFTER 5 minutes operation, Slowly increase load to 2000 Kw using DG A Speed Governor HS-00054A switch.

AND Promptly Adjust WARS to maintain 0 to 900 WARS but as close to 0 on positive side as possible using HS-00053A.

EVALUATOR CUE:

inform the candidate that 10 minutes has elapsed.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Places DG A Speed Governor HS-00054A switch to RAISE until DG A Watts XI-00032A meter indicates 2,000 Kw.

AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A Eva1 Comments STCP-QA-1250 Rev. 2 (9/93)

Page 1 of I 2004 NRC Exam As Given

Appl. To/JPM No.: 24.0P.006.102 Action AFTER I O minutes operation at 2000 KW, Slowly increase load to 3000 KW over a 30-45 second period using DG A HS-00054A.

AND i

Page 10 of 11 (,

PERFORMANkr CHECKLIST Student Name:

Standard Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates Step 515 Promptly Adjust WARS to maintain 0 to 900 WAR but as close to 0 on positive side as possible using HS-00053A EVALUATOR CUE:

Inform the candidate that 10 minutes has elapsed.

3,000 KW.

AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A

  • Critical Step
  1. Critical Sequence Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{

i" PERFORM AN^, CHECKLIST Appl. To/JPM No.: 24.0P.006.102 Step

+I6 17 Action AFTER I O minutes operation at 3000 KW, (A-D DG only) Slowly increase load to 3600 to 4000 KW over a 30-45 second period using DG A Speed Governor HS-00054A switch.

AND Promptly Adjust WARS to maintain 0 to 900 WARS but as close to 0 on positive side as possible using HS-00053A IF diesel generator operated at < 2000 Kw, Perform following for 15 minutes for every hour < 2000 KW and immediately before shutdown:

Raise load to 3600 to 4000 KW using HS-O0054A, Promptly Adjust WARs to maintain 0 to 900 WARs but as close to 0 on positive side as possible using AND HS-00053A.

EVALUATOR CUE:

This completes the JPM 4Critical Step

  1. Critical Sequence Page 11 of 11 Student Name:

Standard Places DG A Speed Governor HS-00054A switch to RAISE over a period of 30-45 seconds until DG A Watts XI-00032A meter indicates 3600 to 4000 KW.

AND Places DG A Voltage Adjust HS-00053A switch to LOWEWRAISE in order to maintain 0 to 900 WARS but as close to 0 on positive side as possible on PlCSY Format Diesel Generator A Determines that this step is not applicable since the diesel was just started.

Eva1 Comments STCP-QA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A.

B.

C.

D.

Diesel Generator A was started manually from OC653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

No other diesel generator is operating synchronized to the grid.

A NPO is stationed at the diesel.

Air intake manifold temperatures are being controlled in AUTOMATIC.

INITIATING CUE Manually synchronize Diesel Generator A with 4.16 KV Bus 1A and pick up 3600 to 4000 KW of load IAW OP-024-001, Diesel Generator section 2.3.

2004 NRC Exam As Given I of2

TASK CONDITIONS A.

B.

C.

D.

Diesel Generator A was started manually from 06653 in accordance with OP-024-001, Diesel Generator and has been running unloaded for 15 minutes.

No other diesel generator is operating synchronized to the grid.

A NPO is stationed at the diesel.

Air intake manifold temperatures are being controlled in AUTOMATIC.

L INITIATING CUE Manually synchronize Diesel Generator A with 4.16 KV Bus 1A and pick up 3600 to 4000 Kw of load IAW OP-024-001, Diesel Generator section 2.3.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET

'-4 SIR0

34. EO.005. I 01 2

01 I1 4104 295028 EAI.03 3.9/3.9 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Reset Drywell Cooling Isolation and Restore Drywell Cooling IAW ES-134-001 (Control Room Actions)

Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Date Head 10 Date of Performance:

Allowed Time (Min.)

Time Taken (Min.)

v JPM Performed By:

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9/93)

Page 1 of 1 2004 NRC Exam As Given File No. A14-56

'v REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 34.E0.005.101

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

11.

REFERENCES ES-134-001, Restoring Drywell Cooling With A LOCA Signal Present Revision 12 I I I. REACTIVITY MAN I PU LATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS L

A.

An ATWS has occurred coincident with a loss of drywell cooling.

B. EO-I 00-1 13 is being implemented for level/power control.

C. EO-I 00-1 03 is being executed for primary containment control.

D. All containment isolations and ECCS actions have properly occurred.

E.

ES-134-001 is being implemented and is complete through Step 4.2.

F.

CIG 90 # header has been restored.

G. MSIVs have been opened IAW ES-I 84-002, REOPENING MSIVS BYPASSING ISOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

VI. TASK STANDARD Drywell Cooling Logic isolations reset and Drywell cooling restored.

VII. TASK SAFETY SIGNIFICANCE Re-establish containment cooling.

2004 NRC Exam As Given

Appl. To/JPM No.: 34.E0.005.101 Step I

2 3

PERFORMANLc CHECKLIST

(:

Page 3 of 7 Action EVALUATOR NOTE:

This JPM is to run AFTER JPM 84.0P.001.I51 has been completed. This will allow for CIG 90#

header to be restored.

This JPM must be performed on the simulator.

Set up the simulator IAW the attached setup instructions.

Place the simulator in Freeze.

Fill out and approve for use a blank copy of ES-134-001 up to step 4.3; mark steps 4.3.2 and 4.3.4 as N/A. Provide this to the candidate for use in completing the task.

When student is ready to begin JPM, place the simulator in RUN.

Obtain a controlled copy of ES-I 34-001, RESTORING DRYWELL COOLING WITH A LOCA SIGNAL PRESENT Review Sections 1.O through 3.0.

Check for approval in Section 4.1.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Controlled copy obtained.

Review Sections 1.O through 3.0.

Verifies:

Shift Manager approval at step 4.1 Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANL CHECKLIST Page 4 of 7 Appl. To/JPM No.: 34.E0.005.101 Step 4

5 6

Action Verify step 4.2 is marked as complete Selects the correct section to perform.

EVALUATOR NOTE:

Candidate may elect to place the control switches to CLOSE for the valves listed in step 6 below. If the candidate places these switches to CLOSE, then it will be Critical that they place the same control switches back to OPEN in step I 7 of this JPM.

Ensure the following valves are closed prior to resetting isolation logic:

A CLRS CLG WTR OB IS0 VLVS HV-18781Al and A CLRS CLG WTR IB IS0 VLVS HV-1878281 and B CLRS CLG WTR OB IS0 VLVS HV-I8781 BI and B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18781A2.

HV-18782B2.

HV-18781 B2.

HV-18782A2.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies:

step 4.2 is marked as complete Selects section 4.3 Verifies:

Amber light -LIT and red light NOT LIT for the following valves:

A CLRS CLG WTR OB IS0 VLVS HV-18781A1 and HV-18781A2.

A CLRS CLG WTR IB IS0 VLVS HV-18782B1 and HV-I 878282.

B CLRS CLG WTR OB IS0 VLVS HV-18781 B I and HV-I 8781 82.

B CLRS CLG WTR IB IS0 VLVS HV-I 8782Al and HV-18782A2.

Eva1 Comments STCP-QA-1258 Rev. 2 (9~3)

Page 1 of 1 2004 NRC Exam As Given

i' i,'

PERFORMANCE CHECKLIST i..

Page 5 of 7 Appl. To/JPM No.: 34.E0.005.101 Step 7

=

  • 8 9
  • I O 11 Action If Containment Instrument Gas has not been restored by ES-184-002, Ensure the following are closed at Panel 1 C601 prior to resetting isolation logic:

INSTR GAS TO CONTN IS0 SV-12651.

INSTR GAS CMP IB SUCT IS0 HV-12603.

INSTR GAS CMP OB SUCT IS0 SV-12605.

Reset Drywell Cooling (HVAC LOCA Trip I A and 1 B)

Logic:

On IC601 momentarily Depress CHAN A DRWL CLG HS-14141A RESET push button.

Observe CHAN A DRWL CLG RESET green IS0 light extinguishes.

On IC601 momentarily Depress CHAN B DRWL CLG HS-14141B RESET push button.

Observe CHAN B DRWL CLG RESET green IS0 light extinguishes.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Based on initial conditions:

Determines that CIG 90# header has been restored.

Depresses CHAN A DRWL CLG HS-14141A RESET pushbutton.

Verifies:

Green light above the pushbutton NOT LIT.

Depresses CHAN B DRWL CLG HS-141418 RESET pushbutton.

Verifies:

Green light above the pushbutton NOT LIT.

Eva1 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 34.E0.005.101 Step

  • I2 13
  • I4 15 16 PERFORMANCt CHECKLIST Page 6 of 7 Action On 1 C681 Heat and Ventilation Control Panel momentarily Depress Chan A RBCW IS0 VALVE POS RESET HS-14140A push button.

Observe Chan A RBCW IS0 VALVE POS RESET white Is0 light extinguishes.

On 1 C681 Heat and Ventilation Control Panel momentarily Depress Chan B RBCW IS0 VALVE POS RESET HS-14140B push button.

Observe Chan B RBCW IS0 VALVE POS RESET white Is0 light extinguishes.

If Containment Instrument Gas has not been restored by ES-I 84-002, Restore CIG in accordance with section 4.4 of this procedure.

EVALUATOR NOTE:

Following valves may not open if CIG header pressure is low.

Drywell cooling will occur after the following steps if RBCCW is in service and the drywell cooling swap valves have re-aligned.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Depresses CHAN A RBCW IS0 VALVE POS RESET HS-14140A.

Verifies:

White light above the pushbutton NOT LIT.

Depresses CHAN B RBCW IS0 VALVE POS RESET HS-14140B.

Verifies:

White light above the pushbutton NOT LIT.

Based on initial conditions:

Determines that CIG 90# header has been restored.

Eva1 Comments STCPUA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 34.E0.005.101 Step 17 i

PERFORMAN& CHECKLIST Action EVALUATOR NOTE:

Back in step 6 of this JPM, the Candidate may have placed the control switches to CLOSE for the valves listed in step 17 below. If the candidate placed these switches to CLOSE, then it is Critical that they place the same control switches back to OPEN in step 17 below.

On 1 C681 Heat and Ventilation Control Panel, Ensure following valves open:

A CLRS CLG WTR OB IS0 VLVS HV-18781Al and A CLRS CLG WTR IB IS0 VLVS HV-18782Bl and B CLRS CLG WTR OB IS0 VLVS HV-18781 B1 and B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18781A2.

HV-18782B2.

HV-18781 B2.

HV-18782A2.

EVALUATOR NOTE:

That completes this JPM

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies:

Amber light - NOT LIT and red light LIT for the following valves:

A CLRS CLG WTR OB IS0 VLVS HV-18781Al and HV-18781A2.

A CLRS CLG WTR IB IS0 VLVS HV-1878281 and HV-18782B2.

B CLRS CLG WTR OB IS0 VLVS HV-18781 B1 and HV-18781 B2.

B CLRS CLG WTR IB IS0 VLVS HV-18782A1 and HV-18782A2.

Eva1

(~

Page 7 of 7 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A.

An ATWS has occurred coincident with a loss of drywell cooling.

B.

EO-100-113 is being implemented for IeveVpower control.

C.

EO-100-103 is being executed for primary containment control.

D. All containment isolations and ECCS actions have properly occurred.

E.

ES-134-001 is being implemented and is complete through Step 4.2.

F. CIG 90 # header has been restored.

G. MSlVs have been opened IAW ES-184-002, REOPENING MSIVS BYPASSING I SOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS

-1.-

A.

An ATWS has occurred coincident with a loss of drywell cooling.

B.

EO-1 00-1 13 is being implemented for level/power control.

C.

EO-1 00-1 03 is being executed for primary containment control.

D.

All containment isolations and ECCS actions have properly occurred.

E.

ES-134-001 is being implemented and is complete through Step 4.2.

F. CIG 90 # header has been restored.

G. MSlVs have been opened IAW ES-184-002, REOPENING MSIVS BYPASSING I SOLATIONS.

V. INITIATING CUE Your supervisor directs you to Reset Drywell Cooling Logic isolations and restore Drywell Cooling in accordance with ES-134-001, section 4.3.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 84.0P.001.I 51 1

01/15/04 295037 EA1.I 1

3.W3.6 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Bypass MSlV and CIG Interlocks During An ATWS And Restore CIG IAW OP-184-001 Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Date Head Date of Performance:

JPM Performed By:

I I O Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S.

Performance Evaluation:

(

)

Satisfactory

(

)

Unsatisfactory Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-I25A Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given File No. A14-58

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 84.0P.001.I 51

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

11. REFERENCES OP-184-001, Main Steam System (Revision 19) 5 Keys for the bypass switches 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE b-IV. TASK CONDITIONS A.

An ATWS has occurred coincident with a loss of drywell cooling.

6. MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E.

CIG System has isolated due to high drywell pressure; both compressors have tripped.

V. INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

VI. TASK STANDARD MSlV and CIG interlocks Bypassed and CIG System 90# header pressurized.

VII. TASK SAFETY SIGNIFICANCE Protect the containment by providing Normal heat sink capability.

2004 NRC Exam As Given

(,'

Appl. To/JPM No.:84.OP.001.I51 Step 1

2 3

f \\

PERFORMANCk CHECKLIST Page 3 of 9 Action EVALUATOR NOTE:

0 This JPM must be performed in the simulator.

0 The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

Set up the simulator IAW attached setup instructions.

Place the simulator in Freeze.

When student is ready to begin JPM, place the simulator in RUN.

0 0

Obtain a controlled copy of OP-184-001.

Selects the correct section to perform.

EVALUATOR NOTE:

When first switch on IC645 is placed in BYPASS, Annunciator AR-147-D1 will alarm.

Bypass MSlV Low Water Level 1 Isolation at IC645 by Placing the following to BYPASS:

  • Critical Step
  1. Critical Sequence Student Name:

Standard Controlled copy obtained.

Selects Attachment A of OP-I 84-001 (Hard Card)

Eva1 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Page 4 of 9 i

PERFORMANCr CHECKLIST Appl. To/JPM No.:84.OP.001.I 51 Step

  • 4
  • 5 6

Action HS-B21-S38A Rx Wtr Lvl 1 MSlV Bypass Logic A.

HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C.

EVALUATOR NOTE:

When first switch on IC644 is placed in BYPASS, Annunciator AR-148-D1 will alarm.

Bypass CIG Low Water Level 1 and High Drywell Pressure Isolation by Placing the following to BYPASS:

  • Critical Step
  1. Critical Sequence Student Name:

Standard Inserts key into Bypass switch HS-B21-S38A Rx Wtr Lvl I MSlV Bypass Logic A and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT Inserts key into Bypass switch HS-B21-S38C Rx Wtr Lvl 1 MSlV Bypass Logic C and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.:84.OP.001.I51 Step

  • 7
  • 8
  • 9 PERFORMANLL CHECKLIST

(

Page 5 of 9 Action At 1C645, HS-12694 Low Lvl 1/Hi Drywell Press CIG Bypass (HV-12603)

At I C645, HS-12695 Low Lvl 1/Hi Drywell Press CIG Bypass (SV-12651)

At 1C644, HS-12696 Low Lvl l/Hi Drywell Press CIG Bypass (SV-12605)

  • Critical Step
  1. Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given Student Name:

Standard Inserts key into Bypass switch HS-12694 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT Inserts key into Bypass switch HS-12695 Low Lvl l/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT Inserts key into Bypass switch HS-12696 Low Lvl 1/Hi Drywell Press CIG Bypass and Places to BYPASS position.

Verifies:

Green light LIT White light NOT LIT Eva1 Comments

Appl. To/JPM No.:84.OP.001.I51 Step I O

  • I 1
  • I2
  • I3

(,

Page 6 of 9 Action IF 1.72# High Drywell Pressure isolation has occurred, Restore CIG as follows:

Open lnstr Gas Cmp Suct Is0 HV-12603.

Open lnstr Gas To Contn Is0 SV-1265 Open lnstr Gas Cmp OB Suct IS0 SV-12605.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Determines that high drywell pressure does exist either from the initiating cue OR control room indications.

Depresses OPEN pushbutton for lnstr Gas Cmp Suct Is0 HV-I2603 and verifies:

Red light LIT Amber light NOT LIT Depresses OPEN pushbutton for lnstr Gas To Contn Is0 SV-I2651 and verifies:

Red light LIT Amber light NOT LIT Depresses OPEN pushbutton for lnstr Gas Cmp Of3 Suct IS0 SV-?2605 and verifies:

Red light LIT Amber light NOT LIT Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.:84.OP.001.I51 Page 7 of 9

(:

PERFORMANCE CHECKLIST Action Reset Instrument Gas Compressor 1 K205A and I

K205B at Containment Instrument Gas Control Panel 1 C239 EVALUATOR CUE:

Role-play the NPO and acknowledge the request.

FAULT STATEMENT:

As NPO, REPORT THE CIG COMPRESSORS WILL NOT RESET.

EVALUATOR CUE:

If necessary Role-play the Unit Supervisor and direct the candidate to restore CIG system pressure with any available installed plant system.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Contacts NPO and directs CIG compressors be placed into service IAW OP-I 84-001 attachment A step 4.a through 4.f Eva1 Comments STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(:

{

/I PERFORMAN& CHECKLIST Page 8 of 9 Appl. To/JPM No.:84.OP.001.I51 Student Name:

pG 115 Action IF Instrument Air available, Cross-Tie Instrument Air to CIG 90# Header as follows.

Slowly Open I-A to CIG Cross-Tie 1261 72 And 1261 67 EVALUATOR CUE:

Role-play the NPO and acknowledge the request.

BOOTH CUE Insert pfs 2 MRF PC125001 OPEN (opens IA 1261 67/126172)

EVALUATOR CUE:

Role-play NPO and contact PCO to inform I-A to CIG Cross-Tie 1261 72 And 1261 67 are OPEN

  • Critical Step
  1. Critical Sequence Standard Verifies:

IA 1 K107A and IA 1 K107B White lights LIT and Amber lights NOT LIT IA Pressure PI-12511A - 100 psig Contacts NPO and requests:

Slowly Open I-A to CIG Cross-Tie 126172And126167 Acknowledges the report Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.:84.OP.001. I 51 Step 16

(

PERFORMANCL CHECKLIST Page 9 of 9 Student Name:

Action Standard Verifies 90# CIG header is being pressurized Verifies:

EVALUATOR CUE:

That completes this JPM EVALUATOR CUE:

That completes this JPM

  • Critical Step STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

  1. Critical Sequence INSTR GAS HDR PRESS PI-I 261 2 AND INSTR GAS SUPP PRESS PI-I2642 Slowly rising Eva1 Comments

TASK CONDITIONS A.

An ATWS has occurred coincident with a loss of drywell cooling.

6. MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E. CIG System has isolated due to high drywell pressure; both compressors have tripped.

INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

2004 NRC Exam As Given 1 of2

u-TASK CONDITIONS A.

An ATWS has occurred coincident with a loss of drywell cooling.

B.

MSlVs and steam line drains are open.

C. The main condenser is available.

D. RPS power is available.

E. CIG System has isolated due to high drywell pressure; both compressors have tripped.

INITIATING CUE Your Supervisor directs you to Bypass MSlV and CIG interlocks by restoring Instrument Gas Compressor operation and CIG System pressure IAW appropriate Hard card.

2004 NRC Exam As Given 2 of 2

L-PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 45.0P.013.151 4

01/11/04 259001 A2.07 3.713.8 Appl. To JPM Number Rev. No.

Date NUREG 11 23 Sys. No.

WA Task

Title:

Perform Switchina Feedwater Level Control Completed By:

Reviews:

Russ Halm Writer Date InstructorMlriter Approval :

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Head Date Date v

Date of Performance:

10 Allowed Time (Min.)

Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

)

Unsatisfactory Eva luat i on :

Evaluator Name:

Sig natu re Typed or Printed Comments:

STCP-QA-1258 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0P.013.151

1.

SAFETY CONSIDERATIONS c

A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES A. OP-145-001, RFP and RFP Lube Oil System (Rev. 35)

I I I. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

None IV. TASK CONDITIONS A. Unit 1 is in Mode 1 100% power.

B. Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

C. I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

V. INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

VI. TASK STANDARD FW LEVEL Control returned to A channel with NO limiter 1 runback on low RX water level (+I3 inches) and NO turbine trip on high RX water level (+54 inches) occurs.

VII. TASK SAFETY SIGNIFICANCE Incorrect performance of the task could result in excessive moisture to the main turbine due to carryover, or loss of available NPSH to the recirculation pumps due to carryunder.

STCP-QA-1258 Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: SlRO 45.0P.013.151 Step i

PERFORMANCt CHECKLIST Action EVALUATOR NOTE:

This JPM must be performed in the simulator.

Select a 100% IC Place feedwater level control in SELECT Narrow range Level A Insert BAT FWB.FWLC-BFL The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

When candidate is ready to begin JPM, place the simulator in RUN.

Candidate locates procedure and refers to appropriate section.

Reviews prerequisites and precautions.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Obtains procedure OP-145-001, RFP and RFP Lube Oil System section 2. IO.

Reviews prerequisites and precautions and Checks:

RX water level A & B within 2 inches of each other on LI-C32-1 R606A & B.

Eva1 Page 3 of 7 Comments STCP-PA-1256 Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: S/RO 45.0P.013.151 Step 3

PERFORMANCt CHECKLIST

  • Critical Step
  1. Critical Sequence Action Verify feed flow/steam flow delta Stable.

EVALUATOR NOTE:

Steam flow/feed flow delta and/or RPV water level may change during the next step, requiring adjustments to FW level controller.

Student Name:

(,

Page 4 of 7 Standard Observe feed flow/steam flow delta.

Checks XR-I 0602:

CH 3 total FW flow CH 4 total STM flow CH 5 Rx NR level on OR PICSY AND Determines the delta to be stable Eva1 Comments STCP-QA-1256 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: S/RO 45.0P.013.151 Step 4

5

  • 6 PERFORMAN& CHECKLIST Page 5 of 7 i Action FAULT STATEMENT REACTOR WATER LEVEL INDICATION WILL DECREASE AT A RATE OF =3 to 5/MIN AFTER THE STUDENT SELECTS THE B FEEDWATER LEVEL.

Transfer feedwater level control from A to B level input as follows with the Averaged or Selected HS14268 in SEL Observe feed flow/steam flow delta EVALUATOR NOTE:

Candidate should recognize Reactor Water Level is decreasing at a fast rate.

Depress B push button for SELECT LVL A OR B HS-C32-1S01

  • Critical Step
  1. Critical Sequence Student Name:

Standard Check for deviation indication at FW LEVEL controller.

CTUDEMAND SIGNAL LIC-C32-1 R600 Depress B pushbutton for SELECT LVL A OR B HS-C32-1 Sol.

Eva1 Comments STCP-QA-1258 Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

r' PERFORMANL CHECKLIST Appl. To/JPM No.: S/RO 45.0P.013.151 Step 7

  • 8 9

Action EVALUATOR NOTE:

Candidate may recognize Reactor Water Level is decreasing at a PRIOR to attempting to null the FW LEVEL CTLlDEMAND SIGNAL.

Null FW LEVEL CTUDEMAND SIGNAL LIC-C32-1 R600 controller by adjusting tape setpoi n t.

IF deviation cannot be nulled, Transfer back to A level input as follows:

Depress A push button for SELECT LVL A OR B HS-C32-1 Sol.

Null FW LEVEL CTUDEMAND SIGNAL LIC-C32-1 R600 controller by adjusting tape setpoint.

  • Critical Step
  1. Critical Sequence STCP-QA-125B Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given Student Name:

Standard Attempts to NULL the deviation by adjusting the tape setpoint on FW LEVEL CTL/DEMAND SIGNAL LIC-C32-1 R600 controller.

AND Determines FW LEVEL CTUDEMAND SIGNAL LIC-C32-1 R600 controller cannot be NULLED.

Depress 'A pushbutton for SELECT LVL A OR B HS-C32-1 Sol.

Null the FW LEVEL CTUDEMAND SIGNAL LIC-C32-1 R600 by adjusting the tape setpoint.

Eva1 i'

Page6of7 '.

Comments

[

Appl. To/J Step 10 11 M No.: S/RO 45.0P.013.151 PERFORMANCE CHECKLIST Action IF necessary, Slowly Return FW LEVEL tapeset to 34" CTUDEMAND SIGNAL LIC-C32-1 R600 Informs supervisor of situation EVALUATOR CUE:

Role play the Unit Supervisor and acknowledge the notification.

EVALUATOR CUE:

This completes the JPM.

4eCritical Step

  1. Critical Sequence Student Name:

Standard If necessary slowly return FW LEVEL tapeset to 34.

CTUDEMAND SIGNAL LIC-C32-1 R600 Notifies supervisor that B channel was failing low.

Eva1 Page 7 of 7 Comments STCP-QA-1258 Rev. 2. (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS B.

C.

b A.

Unit 1 is in Mode 1 100% power.

Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

Page 1 of 2 STCP-QA-1258 Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS B.

C.

v A.

Unit 1 is in Mode 1 100% power.

Feedwater Level Control is in Automatic, Three-Element Control with the level input in SELECT on Narrow Range LEVEL A.

I&C has requested Operations select the LEVEL B input for Feedwater Control to perform testing.

INITIATING CUE Transfer Automatic Feedwater Level Control Input to Level B.

Page 2 of 2 STCP-QA-12SB Rev. 2, (9/93)

Page 1 of 1 2004 NRC Exam As Given

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 14.0P.006.151 0

07/19/04 29501 8 AA1.03 3.3/3.4 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Place Standby RBCCW Pump In Service IAW OP-I 14-001 (Pump casing drain line leak develops)

Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Date Head 15 Date of Performance:

Allowed Time (Min.)

Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

) Unsatisfactory Eva1 uat ion :

Evaluator Name:

Signature Typed or Printed Comments:

~--*.-

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given File NO. A14-5B

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 14.0P.006.151

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 14-001 Reactor Building Closed Cooling Water System (RBCCW) (Revision 16)

II I. REACTIVITY MAN I PU LATIONS This JPM satisfies the requirements of Operational Activity@):

NONE IV. TASK CONDITIONS

~ -.-

A.

Both Units are in Mode I

@ 100% power.

B. A RBCCW pump is in service, B RBCCW pump is in standby.

C. Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

V. INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

VI. TASK STANDARD A

RBCCW pump is again supplying cooling to RBCCW loads, B RBCCW pump is shutdown with suction and discharge path isolated (Casing drain line leak isolated).

VII. TASK SAFETY SIGNIFICANCE Failure to complete the task may result in serious permanent damage to components served by the RBCCW system.

2004 NRC Exam As Given

Appl. To/JPM No.: 14.0P.006.151 Step 1 -

i PERFORMANCE CHECKLIST Page 3 of 12 Action EVALUATOR NOTE:

0 0

Freeze simulator Remove leak by inserting DMF RWI1401 0

Snapan IC 0

Assign pfs I MRF RW114001 0 Assign pfs 2 MRF RW114001 100 0

Assign pfs 3 IMF RW114001 0.02 0

Assign pfs 4 MRF RW114002 0 Assign pfs 5 DMF RW114001 0

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

When student is ready to begin JPM, place the simulator in RUN.

This JPM must be performed in the simulator.

Select any Mode I IC Insert IMF RW11401 1.0 to reduce RBCCW head tank level to 18.5 inches. Monitor on RWI screen.

Select the correct section to perform.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Selects section 2.2 Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Page 4 of 12 i

PERFORMANCt CHECKLIST i'

Appl. To/JPM No.: 14.0P.006.151 2

3 4

Action Review the prerequisites.

EVALUATOR CUE:

Inform the student all prerequisit,,

have been met.

At Panel 1 C668, Start standby RBCCW PUMP 1 P21 OB by Depressing START push button.

Observe RBCCW Pump B discharge pressure between 90-1 10 psig on local pressure gage PI-I 13068.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump 6 discharge pressure on local pressure gage PI-I 13068 is 96 psig.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Ensures all prerequisites have been met.

Depresses RBCCW PP 1 P21 OB START pushbutton Verifies:

Red light LIT; amber light NOT LIT Contacts NPO at the pump and request a check of RBCCW Pump B discharge pressure between 90-1 10 psig on local pressure gage Pl-I 13066.

Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 14.0P.006.151 Step 5

6

(

PERFORMANCE CHECKLIST Page 5 of 12 Action Slowly Close running RBCCW Pump A Dsch 113062.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 1 MRF RWII4001 0 to close RBCCW Pump A Dsch valve I13062 EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump A Dsch valve I13062 has been slowly closed.

Stop running RBCCW PUMP 1 P210A by Depressing STOP push button.

%Critical Step

  1. Critical Sequence Student Name:

Standard Contact NPO at the pump and request Slowly Close running RBCCW Pump A Dsch valve I I3062 Depresses RBCCW PP 1 P21 OA STOP push button Verifies:

amber light LIT; Red light NOT LIT Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 14.0P.006.151 Step 7

8

  • 9 i

PERFORMANLL CHECKLIST

(

Page 6 of 12 Action Check RBCCW Pump B discharge pressure between 80-95 psig on local gauge PI-I 13068.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump B discharge pressure between 80-95 psig on local gauge PI-I 1306B is 86 psig.

Check RBCCW HX discharge pressure on PI-I 1308, Panel I C668 stabilizes between 72-82 psig.

FAULT STATEMENT WHEN THE RBCCW PUMP A DSCH VALVE 113062 IS OPENED IN THE NEXT STEP, A RBCCW LEAK WILL OCCUR THAT WILL CAUSE AR-123-EO6 RBCCW HEAD TANK HI-LO LEVEL TO ALARM.

Open RBCCW Pump A Dsch 113062.

Student Name:

Standard Contacts NPO at the pump and requests:

Check RBCCW Pump B discharge pressure between 80-95 psig on local gauge PI-I 1306B.

Verifies RBCCW HX DISCH PRESS PI-I 1308 between 72-82 psig.

Contact NPO at the pump and request reopening of RBCCW Pump A Dsch valve 113062 Eva1 Comments

  • Critical Step
  1. Critical Sequence STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

(:

PERFORMANCt CHECKLIST Appl. To/JPM No.: 14.0P.006.151 Step Action EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 2 MRF RW114001 100 to open RBCCW Pump A Dsch valve 113062 EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump A Dsch valve 113062 has been opened.

BOOTH CUE:

Insert pfs 3 IMF RW114001 0.02 to INITIATE the RBCCW leak EVALUATOR CUE:

AFTER REPORTING THE CLOSING OF report RBCCW Pump A Dsch valve 113062 Role-play the NPO at the RBCCW pumps and report a LARGE leak on the B RBCCW pump casing drain line.

  • Critical Step
  1. Critical Sequence Student Name:

(:

Page 7 of 12 Standard Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 14.0P.006.151 Step 10 Page 8 of 12 i

PERFORMANCE CHECKLIST Action Acknowledge the alarm and refer to appropriate AR procedure EVALUATOR NOTE:

Candidate may dispatch an NPO to the RBCCW head tank to determine level. If candidate does request local level on RBCCW head tank, report the level as

-18 inches. (Normal level is -40 inches)

EVALUATOR CUE:

Candidate may relay this information to t,,e Unit Supervisor and request direction. If the candidate requests direction, ask the candidate for their recommendation.

Candidate recommendation should be to:

Restart A RBCCW pump Shutdown B RBCCW pump Isolate B RBCCW pump suction and discharge valves

  • Critical Step
  1. Critical Sequence Student Name:

~-

~

Standard Refers to AR-I 23-E06 RBCCW HEAD TANK HI-LO LEVEL Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

I' r'

'/

PERFORM AN^;^ CHECKLIST Page 9 of 12 Appl. To/JPM No.: 14.0P.006.151 Step 11 12

  • I 3 Action EVALUATOR NOTE:

The remaining steps of this JPM are written to support this recommendation. If additional recommendations (for example: initiating makeup to the head tank) are made they will need to be evaluated for appropriateness.

Select the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

Inform the student all prerequisites have been met.

At Panel I C668, Start standby RBCCW PUMP I

P21 OA by Depressing START push button.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Selects section 2.2 Ensures all prerequisites have been met.

Depresses RBCCW PP 1P2 START pushbutton Verifies:

OA Red light LIT; amber light NOT LIT Eva1 Comments STCP-aA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i Page 10 of 12 i

PERFORMANL CHECKLIST Appl. To/JPM No.: 14.0P.006.151 Student Name:

Step 14

  • I5 Action Observe RBCCW Pump A discharge pressure between 90-1 I O psig on local pressure gage PI-I 1306A.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump A discharge pressure on local pressure gage PI-I 1306A is 96 psig.

Slowly Close running RBCCW Pump B Dsch 113068.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

Insert pfs 4 MRF RW114002 0 to close RBCCW Pump B Dsch valve I13068

%Critical Step

  1. Critical Sequence Standard Contacts NPO at the pump and request a check of RBCCW Pump A discharge pressure between 90-1 10 psig on local pressure gage PI-I 1306A.

Contact NPO at the pump and request Slowly Close running RBCCW Pump B Dsch valve I13068 Eva1 Comments STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No:

Step

  • I6 17 18 14.0P.006.151 PERFORMANCE CHECKLIST Page 11 of 12 Action EVALUATOR CUE:

Role-play NPO at the pump AND report RBCCW Pump B Dsch valve 113068 has been slowly closed.

Stop running RBCCW PUMP 1 P210B by Depressing STOP push button.

Check RBCCW Pump A discharge pressure between 80-95 psig on local gauge PI-I 1306A.

EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request AND report RBCCW Pump A discharge pressure between 80-95 psig on local gauge Pl-I 1306A is 86 psig.

Check RBCCW HX discharge pressure on PI-I 1308, Panel I C668 stabilizes between 72-82 psig.

+KCritical Step

  1. Critical Sequence Student Name:

Standard Depresses RBCCW PP I P21 OB STOP pushbutton Verifies:

amber light LIT; Red light NOT LIT Contacts NPO at the pump and requests:

Check RBCCW Pump A discharge pressure between 80-95 psig on local gauge PI-l1306A.

Verifies RBCCW HX DlSCH PRESS PI-I 1308 between 72-82 psig.

Evai Comments STCP-W-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Page 12 of 12

(:

PERFORMANCt CHECKLIST Action Appl. To/JPM No.: 14.0P.006.151 Standard Step Contact NPO at the pumps and request closing of B RBCCW pump suction I valve I13063

  • I9 Student Name:

Close B RBCCW pump suction valve I 13063 EVALUATOR CUE:

Role-play NPO at the pump and acknowledge the request BOOTH CUE:

When the candidate requests closing of 6 RBCCW pump suction valve 113063:

Insert pfs 5 DMF RW114001 to remove the RBCCW leak.

EVALUATOR CUE:

Role-play NPO at the pump and report B RBCCW pump suction valve I 13063 is closed.

EVALUATOR CUE:

If necessary Role-play NPO at the pump and inform Control room that the leak has stopped.

EVALUATOR CUE:

That completes this JPM

%Critical Step

  1. Critical Sequence Eva1 Comments I

STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS L-A.

Both Units are in Mode 1 @ 100% power.

B. A RBCCW pump is in service, B RBCCW pump is in standby.

C.

Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS A.

Both Units are in Mode 1 @ 100% power.

B. A RBCCW pump is in service, B RBCCW pump is in standby.

C.

Maintenance wants to obtain some vibration data on the B RBCCW pump and motor.

D. An NPO is stationed at the RBCCW pumps to support this evolution.

INITIATING CUE Your supervisor directs you to place the B RBCCW pump in service and shutdown the A RBCCW pump IAW the appropriate procedure.

2004 NRC Exam As Given 2 o f 2

PENNSYLVANIA POWER 8t LIGHT COMPANY JOB PERFORMANCE MEASURE b

APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 52.0P.005.151 1

0 1 / I 6/04 206000 A4.13 4.1/4.0 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

KIA Task

Title:

Recovery from a Manual Closure of HPCl Isolation Valves With an Initiation Signal Present With a Steam Leak Developing. (OP-152-001)

Completed By:

Reviews:

Russ Halm Writer Date InstructorNvriter Date Approval:

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Date Head 20 Date of Performance:

Allowed Time (Min.)

Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory

(

) Unsatisfactory Evaluation:

Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

L-

.~

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 52.0P.005.151

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

It. REFERENCES OP-152-001, HPCl System (Revision 30)

AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP (Revision 23)

AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP (Revision 23) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

44 HPCl Recovery from Isolation IV. TASK CONDITIONS A.

Due to an inadvertent initiation, HPCl isolation valves were manually isolated.

B.

After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.

V. INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute VI. TASK STANDARD HPCl is started and begins injecting into the vessel. The steam leak is isolated.

VII. TASK SAFETY SIGNIFICANCE Secondary containment steam leak is isolated.

2004 NRC Exam As Given

i' PERFORMANCE CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Step Action EVALUATOR NOTE:

This JPM must be performed in the simulator.

The FAULTED step in this JPM is preceded by a fault statement in BOLD TYPE WITH ALL CAPITAL LETTERS.

Setup the simulator IAW the attached setup instructions.

Place the Simulator in FREEZE.

When the student is ready to begin, place the Simulator in RUN.

Obtain a controlled copy of OP-I 52-001 HPCl System Selects the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

If necessary, inform the student that the prerequisites have been meet.

Review the precautions.

  • Critical Step
  1. Critical Sequence Student Name:

1; Page 3 of 14 Standard Controlled copy obtained.

Selects section 2.1 1 Ensures that the prerequisites have been met.

Follows applicable precautions.

Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i PERFORMANCE CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Step 5

6 Action Select appropriate step to begin.

EVALUATOR NOTE:

Preferable to prevent auxiliary oil pump from running while re-pressurizing steam supply line. Opening auxiliary oil pump breaker will shutdown auxiliary oil pump which will result in stop and control valve closure. Desirable to re-pressurize as soon as possible to avoid large condensation of steam with inability to drain due to HPCl TURBINE STEAM SUPPLY HV-155-F001 open.

Observe following status:

HPCI INJECTION HV-155-FO06 CLOSED.

HPCl MIN FLOW TO SUPP POOL HV-155-FO12 CLOSED.

HPCI L-0 CLG WTR HV-156-FO59 CLOSED.

HPCl STM SUPPLY IB IS0 HV-155-FO02 CLOSED.

HPCl STM SUPPLY OB IS0 HV-155-FO03 CLOSED.

  • Critical Step
  1. Critical Sequence Student Name:

Page 4 of 14 Standard Selects Step 2.1 1.7 Verifies RED light NOT LIT and AMBER light LIT for the following valves:

HPCl INJECTION HV-I 55-FO06 HPCl MIN FLOW TO SUPP POOL HV-155-F012 HPCl L-0 CLG WTR HV-156-FO59 HPCl STM SUPPLY IB IS0 HPCl STM SUPPLY OB IS0 HV-155-FO02 HV-155-FO03 Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 52.0P.005.151 Step 7

t 8 PERFORM AN^^ CHECKLIST i'

Page 5 of 14 Action HPCl AUXILIARY OIL PUMP 1 P213 IN OPERATION.

OPEN.

HPCl TURBINE STEAM SUPPLY HV-155-FO01 Open HPCl TURBINE AUXILIARY OIL PUMP 1 P213 BREAKER 1 D274031.

EVALUATOR CUE:

Role-play NPO and acknowledge the request.

BOOTH OPERATOR CUE:

Insert pfs 3 MRF DC188128 OPEN to open the Aux Oil Pump breaker.

EVALUATOR CUE:

Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP 1 P213 BREAKER 1 D274031 is OPEN.

  • Critical Step
  1. Critical Sequence Student Name:

Standard

~~~

Verifies RED light LIT and AMBER light NOT LIT for the following:

HPCl AUXILIARY OIL PUMP 1P213 HPCl TURBINE STEAM SUPPLY HV-155-FOOI Directs NPO to open Breaker 1 D274031.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 52.0P.005.151 Step 9

10 11 12 i,

Page6of 14 i

PERFORMANL CHECKLIST Action Ensure following indicate CLOSED:

HPCl TURB STOP VLV FV-15612.

HPCl TURB CTL VLV FV-1561 I.

Reset HPCl system isolation as follows:

Place control switch for HPCl STM SUPPLY IB IS0 HV-155-FO02 in CLOSE position.

Place control switch for HPCl STM SUPPLY OB IS0 HV-155-FO03 in CLOSE position.

Ensure control switch for HPCl WARM-UP LINE IS0 HV-155-FI 00 in CLOSE position.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies RED light NOT LIT and AMBER light LIT for the following valves:

HPCl TURB STOP VLV FV-15612.

HPCl TURB CTL VLV FV-1561 I.

Verifies :

HPCl STM SUPPLY IB IS0 HV-155-FO02 in CLOSE position.

RED light NOT LIT and AMBER light LIT Verifies:

HPCl STM SUPPLY OB IS0 HV-155-FO03 in CLOSE position.

RED light NOT LIT and AMBER light LIT Verifies control switch HPCl WARM-UP LINE IS0 HV-155-Fl00 in CLOSE position.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 52.0P.005.151 Step

  • I 3 14
  • I5
  • I 6 Page 7 of 14 i:

PERFORMANCk CHECKLIST Student Name:

Action EVALUATOR NOTE:

If the GREEN light above HPCl AUTO IS0 SIG A RESET HS-E41-1 S30 is LIT, then steps 13 and 15 are Critical steps.

Place HPCl AUTO IS0 SIG A RESET HS-E41-1S30 keyswitch to RESET.

Ensure HPCl IS0 DIV 1 IS0 status light EXTl NG U ISH ES.

Return HPCl AUTO IS0 SIG A RESET HS-E41-1 S30 keyswitch to NORM.

Place HPCl AUTO IS0 SIG B RESET HS-E41-1S18 keyswitch to RESET.

  • Critical Step
  1. Critical Sequence Standard Obtains key and inserts into HPCl AUTO IS0 SIG A RESET HS-E41-1 S30 keyswitch Places keyswitch to RESET Verifies:

HPCl IS0 DIV I IS0 status light NOT LIT Places HPCl AUTO IS0 SIG A RESET HS-E41-1 S30 keyswitch to NORM Obtains key and inserts into HPCl AUTO IS0 SIG B RESET HS-E41-1S18 keyswitch Places keyswitch to RESET Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i"

(,

Page 8 of 14 Appl. TolJPM No.: 52.0P.005.151 Step 17

  • I8 19 PERFORMANC t CHECKLIST Action Ensure HPCl IS0 DIV 2 IS0 status light EXTl NG U I SHES.

Return HPCl AUTO IS0 SIG B RESET HS-E41-lS18 keyswitch to NORM.

Pressurize steam supply line as follows:

Open HPCl STM SUPPLY OB IS0 HV-155-FO03.

Open HPCl WARM-UP LINE IS0 HV-155-F100.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Verifies:

HPCl IS0 DIV 2 IS0 status light NOT LIT Places HPCl AUTO IS0 SIG B RESET HS-E41-1 SI 8 keyswitch to NORM Places control switch to OPEN for the following valves:

HPCl STM SUPPLY OB IS0 HV-155-FOO3.

HPCl WARM-UP LINE IS0 HV-155-FIOO.

Verifies:

Verifies RED light LIT and AMBER light NOT LIT Eva1 Comments I

STCPQA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

{

PERFORMANCE CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Step t20 21 Action WHEN:

Steam line pressurized to - reactor pressure, Open HPCl STM SUPPLY IB IS0 HV-155-FO02.

Close HPCI WARM-UP LINE IS0 HV-155-FIOO.

EVALUATOR NOTE:

High drywell pressure coincident with low reactor pressure initiates closure of valves in following step.

When high drywell pressure condition OR low reactor pressure condition clears, valves can be opened.

  • Critical Step
  1. Critical Sequence Student Name:

/:

Page 9 of 14 Standard Checks steamline pressure is rising on (PLE41-I R602) and compares this to any Reactor pressure indicator.

WHEN steamline pressure is - reactor pressure:

Places control switch to OPEN for HPCl Verifies RED light LIT and AMBER light NOT LIT STM SUPPLY IB IS0 HV-155-FO02.

Places control switch to CLOSE for HPCl WARM-UP LINE IS0 HV-155-FIOO Verifies AMBER light LIT and RED light NOT LIT Eva1 Comments STCP-Q.A-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(

Page I O of 14 i/

i PERFORMANCL CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Student Name:

Step 22 23 24 Action Ensure following valves OPEN:

HPCl TURB EXH OB VAC BKR HV-155-FO75.

HPCl TURB EXH IB VAC BKR HV-155-FO79.

Ensure following alarms CLEAR:

AR-114-CO1 HPCl TURB EXH VAC BKR HV-155-FO75 NOT FULLY OPEN.

AR-114-DO1 HPCl TURB EXH VAC BKR HV-155-F079 NOT FULLY OPEN.

Place HPCl System in service feeding reactor vessel as follows:

Place HPCl TURBINE FLOW CONTROL FC-E41-1 R600 in MANUAL set for minimum.

FAULT STATEMENT WHEN THE STOP VLV FV-I5612 AUTOMATICALLY OPENS IN THE NEXT STEP, A STEAM LEAK DEVELOPS IN HPCI EQUIPMENT ROOM.

  • Critical Step
  1. Critical Sequence Standard Verifies RED light LIT and AMBER light NOT LIT for the following valves:

HPCl TURB EXH OB VAC BKR HPCl TURB EXH IB VAC BKR HV-155-FO75.

HV-I 55-FO79.

Verify the following alarms CLEAR:

AR-114-CO1 HPCl TURB EXH VAC BKR HV-155-FO75 NOT FULLY OPEN.

AR-I 14-DO1 HPCl TURB EXH VAC BKR HV-155-FO79 NOT FULLY OPEN.

Places HPCl TURBINE FLOW CONTROL FC-E41-1 R600 in MANUAL set for minimum.

Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 52.0P.005.151 Step

+ 25 26

(>

PERFORMANCE CHECKLIST Page 11 of 14 Action Close HPCl TURBINE AUXILIARY OIL PUMP I P213 BREAKER 1 D274031.

EVALUATOR CUE:

Role-play NPO and acknowledge the request.

BOOTH OPERATOR CUE:

Insert pfs 4 MRF DC188128 CLOSE to CLOSE the Aux Oil Pump breaker.

EVALUATOR CUE:

Role-play NPO and report back to candidate that HPCl TURBINE AUXILIARY OIL PUMP I P213 BREAKER I D274031 is CLOSED.

Observe:

HPCl AUXILIARY OIL PUMP 1 P213 STARTS.

HPCI INJECTION HV-155-FO06 OPENS.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Directs NPO to CLOSE Breaker 1 D274031.

Verifies RED light LIT and AMBER light NOT LIT for the following:

HPCI AUXILIARY OIL PUMP 1 P213 HPCl INJECTION HV-155-FO06 Eva1 Comments STCP-PA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Page 12 of 14

(

PERFORMANCt CHECKLIST Appl. To/JPM No.: 52.0P.005.151 Step 27

~~

Action EVALUATOR NOTE:

The steam leak should cause the below annunciators to alarm, the candidate should respond to the alarms and isolate the leak by CLOSING HV-155-F002 and F003 HPCl Steam Isolation valves.

EVALUATOR NOTE:

Candidate may CLOSE HV-155-FO02 and F003 HPCl Steam Isolation valves based on degrading plant conditions PRIOR to performing alarm response procedure.

Respond to annunciator on AR-114 AR-114-F04 HPCl LEAK DETECT LOGIC A HI TEMP AND AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP

  • Critical Step
  1. Critical Sequence Student Name:

Standard Acknowledges:

LOGIC A HI TEMP AR-114-F04 HPCl LEAK DETECT AND AR-114-F05 HPCl LEAK DETECT LOGIC B HI TEMP Eva1 Comments STCP-QA-1250 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

I" i

i PERFORMANb CHECKLIST Page 13 of 14 Appl. To/JPM No.: 52.0P.005.151 Step 2%

4~ 29 Action Observe STM SUPPLY Isolation valves not closed Isolates HPCl steam supply valves.

EVALUATOR CUE:

Role-play the Unit Supervisor and acknowledge the report.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

STM SUPPLY IB IS0 HV-155-F002 AND STM SUPPLY OB IS0 HV-155-F003 Red lights LIT Amber lights NOT LIT Places control switches STM SUPPLY AND 16 IS0 HV-155-FO02 STM SUPPLY OB IS0 HV-155-FO03 to CLOSE Verifies:

Red lights NOT LIT Amber lights LIT Inform the Unit Supervisor that HPCl is isolated due to a steam leak.

Eva1 Comments STCP-QA-1 25B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 52.0P.005.151 Step PERFORMANL, CHECKLIST Page 14 of 14 Student Name:

Action Standard Eva1 Comments EVALUATOR CUE:

That completes this JPM

  • Critical Step
  1. Critical Sequence STCP-QA-1256 Rev. 2 (9~3)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A.

Due to an inadvertent initiation, HPCl has been manually isolated.

B. After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCI is now required to maintain vessel inventory.

INITIATING CUE Recover from the HPCl System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam As Given 1 of2

TASK CONDITIONS A.

Due to an inadvertent initiation, HPCl has been manually isolated.

B.

After HPCl was isolated, a reactor scram occurred from an MSlV isolation. HPCl is now required to maintain vessel inventory.

INITIATING CUE Recover from the HPCI System isolation, and establish injection to the vessel at approximately 5,000 gallons per minute 2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET v

SIR0 57.0P.001.I 02 0

07/22/04 262002 A4.01 2.813.1 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS ID656 and the Alternate power supply IAW with OP-I 57-001 Computer and Vital UPS.

Completed By:

Reviews:

Russ Halm 07/22/04 Writer Date InstructorNVriter Date Approval:

Requesting Supv.1C.A.

Date Nuclear Trng. Supv.

Date Head Date of Performance:

JPM Performed By:

25 Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S. #

Performance Evaluation:

(

)

Satisfactory

(

)

Unsatisfactory Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2. (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

5..-

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 57.0P.001.I 02

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-I 57-001 COMPUTER AND VITAL UPS Revision 13 II I. REACTIVITY MAN I PU LATIONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A.

Unit I is in a Refueling Outage.

B.

Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C.

Computer UPS 1 D656 is de-energized.

D.

Maintenance has been completed and all clearance orders have been removed.

V. INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS 1 D656 IAW with OP-I 57-001 Computer and Vital UPS.

VI. TASK STANDARD Computer Distribution Panels 1Y619 and 1Y620 energized, Computer UPS 1 D656 energized and Alternate power supply breaker CB-7 closed.

VII. TASK SAFETY SIGNIFICANCE Provides reliable power supply to Vital instrumentation bus.

2004 NRC Exam As Given

(

Page 3 of 12 Appl. TolJPM No.: 57.0P.001.102 1

2 i

PERFORMANCE CHECKLIST Action EVALUATOR NOTE:

0 0

This JPM must be performed in the plant.

Obtain permission from Shift Manager to perform this JPM.

Ensure the following material is available to support performance of this JPM:

A copy of the latest revision of OP-I 57-001, Computer and Vital UPS.

0 0

Obtain a controlled copy of OP-157-001 COMPUTER AND VITAL UPS Selects the correct section to perform.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Controlled copy of OP-I 57-001 COMPUTER AND VITAL UPS obtained.

Selects section 3.1 Comments STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.102 Step

(

PERFORMANCk CHECKLIST Page 4 of 12 Action

~

Review the prerequisites.

EVALUATOR CUE:

All prerequisites have been met Reviews precautions

  • Critical Step
  1. Critical Seq uence Student Name:

Standard Ensures all prerequisites have been met.

DC power available in accordance with OP-I 88-001.

AC power available in accordance with OP-I 05-001.

Following UPS breakers Open:

CB-1 Battery Input Breaker CB-8 Heater Breaker (remains CB-2 System Output Breaker CB-4 Alternate Source AC Input to Static Switch Breaker CB-7 DCS Output Breaker CB-6 Alternate Source AC Input Bkr CL-157-0011 complete open)

Reviews precautions Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i" Appl. To/JPM No.: 57.0P.001.I02 Step

++5 PERFORMANkr CHECKLIST Action EVALUATOR NOTE:

Meter select switches SW3, SW2, SW4, and SW5.

Must be in a position OTHER THAN OFF in order to get indication on A I (SW3), VI (SW2), V3 (SW4) and A3 (SW5). If the candidate requires a reading from any of these meters, provide a response of 0 if the appropriate switch is OFF.

in a position OTHER THAN DEPRESS and HOLD Pre-Charge push button:

OBSERVE Pre-Charge light ILLUMINATES OBSERVE voltage indicated on Voltmeter V2 increases >250 VDC.

AND EVALUATOR CUE:

Pre-Charge light LIT Voltage indicated on Input Voltage V2 is 260 VDC.

++Critical Step

  1. Critical Sequence Student Name:

i' Page 5 of 12 Standard Depresses and holds the Pre-Charge Push button.

Verifies:

Pre-Charge light LIT Voltage indicated on Input Voltage V2 meter increases >250 VDC.

Eva1 Comments STCP-OA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.I 02 Step t 6 7

8 PERFORMA~L CHECKLIST il Page 6 of 12 Action EVALUATOR NOTE:

When CB-1 is closed:

PLIO Closed light illuminates.

PL9 Open light extinguishes.

PL17 Static inverter DC ON Sync light illuminates.

Input Voltage V2 increases to battery voltage - 268 VDC 0 Computer UPS inverter voltage VI increases to 208 volts if SW2 is in a position OTHER THAN OFF F I Frequency increases to 60 Hertz.

CLOSE Battery Input Breaker CB-1 RE LEASE P re-C ha rg e push button.

OBSERVE DC bus voltage on Voltmeter V2 - 268V DC.

EVALUATOR CUE:

Input Voltage V2 meter is 270V DC.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Places CB-1 Battery Input Breaker to close position (Lifts it up).

Releases Pre-Charge push button.

Checks Input Voltage V2 meter

- 268V DC.

Eva1 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.102 9

10 PERFORMANCE CHECKLIST i'

Page 7 of 12 Action OBSERVE inverter output voltage on Voltmeter VI

-208V AC.

EVALUATOR CUE:

Output Voltage V I Computer UPS Inverter Voltage meter is 208V AC.

OBSERVE Inverter output frequency on Frequency Meter F1-60 HZ.

EVALUATOR CUE:

Frequency F1 meter is 60 HZ.

  • Critical Step Student Name:

Standard Checks:

Output Voltage VI Computer UPS Inverter Voltage meter -208V AC.

Checks:

Frequency F1 meter - 60 HZ.

Eva1 Comments

  1. Critical Sequence STCP-QA-1 25B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.IO2 Step

  • I 1

12 PERFORMANCE CHECKLIST

(

Page 8 of 12 Action EVALUATOR NOTE:

When CB-6 is closed:

0 PL14 illuminates.

PL13 extinguishes.

PL16 illuminates.

0 V4 Input voltage increases to 480 VAC.

0 Output Voltage V3 Voltmeter increases to 208 VAC if SW4 is in any position OTHER THAN OFF.

0 Frequency F3 meter increases to 60 Hertz.

CLOSE Altei late Source AC Input Breaker CB-6.

OBSERVE input voltage on Voltmeter V4 - 480V AC.

EVALUATOR CUE:

Input Voltage V4 meter is 480V AC.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Places CB-6 Alternate Source AC Input Bkr to the close position (Lifts it up)

Verifies:

Input Voltage V4 meter - 480V AC.

Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.102 Step 13 14

  • I 5 f

PERFORMAN& CHECKLIST

/;

Page 9 of 12 Action CHECK output voltage on Voltmeter V3 - 208V AC.

EVALUATOR CUE:

Output Voltage V3 meter is 208V AC.

CHECK output frequency on Frequency Meter F3 -

60 HZ.

EVALUATOR CUE:

Frequency F3 meter is 60 HZ.

EVALUATOR NOTE:

When CB-4 is closed:

0 PL8 illuminates.

0 PL7 extinguishes.

0 PL3 Sync Potential light illuminates.

CLOSE Alternate Source AC Input to Static Switch Breaker CB-4.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

Output Voltage V3 meter - 208V AC.

Checks:

Frequency F3 meter - 60 HZ.

Places CB-4 Alternate Source AC Input to Static Switch Breaker to close (Lifts it UP).

Eva1 Comments STCP-QA-1258 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.102

=

Step 16 17

  • I8 19 PERFORMANL CHECKLIST

{:

Page 10 of 12 Action CHECK Sync Potential light PL3 ILLUMINATES.

EVALUATOR CUE:

Sync Potential PL3 light-LIT CHECK Manual Bypass Switch selected to NORMAL MODE by observing Normal Mode indicator light PL6 ILLUMINATED.

EVALUATOR CUE:

Normal Mode PL6 light-LIT DEPRESS Inverter To Load push button PBI OBSERVE Indicator Light PL1 ILLUMINATES.

EVALUATOR CUE:

Inverter Supply PL1 light LIT

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

Sync Potential PL3 light-LIT.

Verifies:

Manual Bypass Switch Normal Mode PL6 light-LIT.

Depresses:

Inverter To Load PBI push button Verifies:

Inverter Supply PLI light LIT Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.I 02 Step 20 a21 22 a23 i

PERFORMANCE CHECKLIST Page 11 of 12 Action If Alternate Power Source was in Service, OBSERVE PL2 EXTINGUISHES.

EVALUATOR CUE:

Alternate Supply PL2 light - NO CLOSE Output Breaker CB-2.

EVALUATOR CUE:

LIT If necessary, Role-play the supervisor and inform the candidate that it is desired to close all load breakers on panels 1Y619 and 1Y620 in the next step.

CLOSE desired instrument load breakers on appropriate panel(s):

Panels 1Y619 and 1Y620 for Computer UPS.

On Computer UPS only, CLOSE or CHECK CLOSED DCS output breaker CB7.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

Alternate Supply PL2 light - NOT LIT.

Places CB-2 System Output Breaker to close (Lifts it up)

Closes all breakers on the following two panels:

1 Y620 120V AC Computer UPS Distribution Panel AND 1Y619 120V AC Computer UPS Distribution Panel Places CB7 DCS Output Breaker to close.

Eva1 Comments STCP-QA-1256 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 57.0P.001.I02 Step 24 PERFORMANCE CHECKLIST (1

Page 12 of 12 Action ENSURE Inverter load indicated on Ammeter AI :

I 208 amps for Computer Inverter.

EVALUATOR CUE:

Computer UPS Inverter Amps A I ammeter is 50 amps EVALUATOR CUE:

This completes the JPM

  • Critical Step
  1. Critical Sequence Student Name:

Standard Checks:

Computer UPS Inverter Amps AI meter I

208 amps Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS v

A.

Unit 1 is in a Refueling Outage.

B.

Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C.

Computer UPS 1 D656 is de-energized.

D.

Maintenance has been completed and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels lY619 and 1Y620 with Computer UPS 1 D656 IAW with OP-157-001 Computer and Vital UPS.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS A.

Unit 1 is in a Refueling Outage.

- Y -

B.

Computer Distribution Panels 1Y619 and 1Y620 have been completely de-energized to perform maintenance on the panels.

C.

Computer UPS 1 D656 is de-energized.

D. Maintenance has been completed and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to re-energize Computer Distribution Panels 1Y619 and 1Y620 with Computer UPS 1 D656 IAW with OP-157-001 Computer and Vital UPS.

\\--

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET i--

SIR0 58.0P.006.251 0

0 1 107104 212000 A I.01 2.812.9 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

WA Task

Title:

Start RPS MG Set 2S237A from Local Control Panel 2G201A IAW OP-258-001 Completed By:

Reviews:

Russ Halm Writer Date InstructorNVriter Date Approval:

Requesting Supv.1C.A.

Date Nuclear Trng. Supv.

Date Head Date of Performance:

-v-JPM Performed By:

20 Allowed Time (Min.)

Time Taken (Min.)

Student Name:

Last First M.I.

Employee #/S.S. #

Performance Evaluation:

(

)

Satisfactory

(

) Unsatisfactory Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-5B

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SIR0 58.0P.006.251

1.

SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-258-001, RPS System (Rev. 25)

I I I. REACTIVITY MAN1 PU LATlO NS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS

=-

A.

Reactor Startup preparations are in progress on Unit 2.

B.

RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

V. INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

VI. TASK STANDARD RPS MG set A is running and EPA breakers are closed.

VII. TASK SAFETY SIGNIFICANCE Provides a reliable, regulated power source to the reactor protection system.

\\--

2004 NRC Exam As Given

i' Appl. To/JPM No.: 58.0P.006.251 Step 1

2 3

4

=

PERFORMANCE CHECKLIST Action EVALUATOR NOTE:

0 This JPM must be performed in the plant.

0 Obtain permission from Shift Manager to perform this JPM.

0 Ensure the following material is available to support performance of this JPM:

A copy of the latest revision of OP-258-001, RPS System.

EVALUATOR NOTE:

The following conditions exist:

0 e

Motor On light (red) is EXTINGUISHED.

Motor Off light (green) is ILLUMINATED.

Generator Output breaker (on the MG Set) is open.

The MG voltmeter and ammeter indicate 0.

Both EPA breakers (2CBSOO3A-A and 2CBS003A-C) are open.

All four red indicating lights on the EPA breakers are extinguished.

0 0

0 0

Obtain a controlled copy of OP-258-001.

Selects the correct section to perform.

Review the prerequisites.

Reviews precautions

+Critical Step

  1. Critical Sequence Student Name:

i Page 3 of 10 Standard Controlled copy obtained.

Selects section 2.1 Ensures all prerequisites have been met.

Reviews precautions Eva1 Comments STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 58.0P.006.251 Step 5

t 6 7

8 PERFORMANCt CHECKLIST Page 4 of 10 Action Start RPS M-G Set 2S237N2G201A from local control panel 2G201A located on top of M-G Set as follows:

Unlock AND Rotate Voltage Adjust potentiometer to FULL COUNTER-CLOCKWISE position EVALUATOR NOTE:

Motor has automatic reset of thermal overloads. If motor fails to come up to speed, thermal overloads should be allowed time to reset prior to initiating another start sequence.

Depress AND Hold Motor On push button.

WHEN Motor On red indicating light ILLUMINATES, Release Motor On push button.

EVALUATOR CUE:

The red light above the Motor On pushbutton -LIT Observe M-G Set comes up to speed

  • Critical Step
  1. Critical Sequence Student Name:

Standard Loosens locking device set screw.

Rotates the potentiometer to the full CCW position.

Depresses and holds the Motor On pushbutton.

Verifies:

The red Motor On light - LIT Releases the Motor On pushbutton Verifies:

M-G set begins to rotate by visible observation of shaft or audible noise of shaft beginning to rotate Eva1 Comments STCP-QA-1 25B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appi. To/JPM No.: 58.0P.006.251 i

PERFORMAN& CHECKLIST i'

Page 5 of 10 Action

~

EVALUATOR CUE:

Shaft is rotating and/or it can be heard to starting to rotate EVALUATOR NOTE:

The Motor On pushbutton must be depressed again in order to reset the overvoltage trip. There is no visible indication that it has reset.

Reset OV relay by Depressing Motor ON push button.

Adjust voltage output to 120V AC using Voltage Adjust potentiometer.

EVALUATOR CUE:

Inform the candidate that RPS M-G set A Voltmeter is I10 Volts EVALUATOR CUE:

inform the candidate that the voltage is 120 Volts Lock Voltage Adjust potentiometer.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Depresses:

Motor On pushbutton.

Checks:

RPS M-G Set A Voltmeter to determine existing voltage While observing the RPS M-G Set A Voltmeter:

Turns the Voltage Adjust potentiometer clockwise until 120 volts is observed.

Tightens the locking set screw on the Voltage adjust potentiometer.

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 58.0P.006.251 Step

  • I3 14 15 16 17 i'

PERFORMANL CHECKLIST i

\\,

Page 6 of 10 Action Close Generator Output breaker located on local control panel 2G201 A.

EVALUATOR NOTE:

When the Generator Output Breaker is closed. the red Motor Gen Power IN light on EPA Panel 2CBS003 A-A will illuminate.

Check Input Power Available red light ILLUMINATES at EPA breaker 2CBS003A-A.

EVALUATOR CUE:

Motor Gen Power IN red light LIT Close M-G set EPA breakers per section 2.2 of this procedure.

Selects the correct section to perform.

EVALUATOR NOTE:

Performance of the next step will require the use of a key for the Keylock switch. These keys are readily available to the operators. They can be obtained from the control room or FUS office if necessary. The use of this key will be SIMULATED for this JPM. (Key would normally be obtained during the pre-job brief).

Review the prerequisites.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Places the Generator Output breaker to the ON position (Lifts it up).

Verifies:

Motor Gen Power IN red light LIT (on 2CBS003A-A)

Selects section 2.2 Ensures all prerequisites have been met.

Eva1 Comments STCP-QA-1250 Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

Appl. TolJPM No.: 58.0P.006.251 Step

  • I 8 19
  • 20 PERFORMANCE CHECKLIST

{'

Page 7 of 10 Action Close EPA breaker 2CBS003A-A as follows:

Momentarily Place Oper/Reset Switch to RESET for EPA breaker 2CBS003A-A.

FAULT STATEMENT:

THE UNDERVOLTAGE LIGHT WILL REMAIN LIT IN THE FOLLOWING STEP. THIS WILL REQUIRE THE CANDIDATE TO MOMENTARILY PLACE THE OPEWBKR TRIP/RESET SWITCH TO RESET, A SECOND TIME, FOR EPA BREAKER 2CBSOO3A-A.

Confirm overvoltage, undervoltage and underfrequency lights are NOT ILLUMINATED.

EVALUATOR CUE:

Overvoltage, and Underfrequency lights are NOT LIT Undervoltage light is LIT IF any of the three lights are ILLUMINATED; Momentarily Place Oper/Reset Switch to RESET for EPA breaker 2CBS003A-A.

  • Critical Step
  1. Critical Sequence Student Name:

~~

Standard inserts key into keylock switch AND Momentarily places Oper/Bkr Trip/Reset switch to RESET.

(on 2CBS003A-A)

Verifies:

Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT Momentarily places Oper/Bkr Trip/Reset switch to RESET.

(on 2CBS003A-A)

Verifies Undervoltage light is NOT LIT Eva1 Comments STCP-OA-1256 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 58.0P.006.251 Step 521 522 23 i:

PERFORMANCt CHECKLIST

(,I Page 8 of 10 Action EVALUATOR CUE:

Undervoltage light is NOT LIT Place OpedReset Switch to OPER for EPA breaker 2CBS003A-A.

Close EPA breaker 2CBS003A-A.

Check Input Power Available red light ILLUMINATES at EPA breaker 2CBSOO3A-C EVALUATOR CUE:

Motor Gen Power IN red light LIT at EPA breaker 2CBS003A-C EVALUATOR NOTE:

Performance of the next step will require the use of a key for the Keylock switch. These keys are readily available to the operators. They can be obtained from the control room or FUS office if necessary. The use of this key will be SIMULATED for this JPM. (Key would normally be obtained during the pre-job brief).

  • Critical Step
  1. Critical Sequence Student Name:

Standard Places Oper/Bkr Trip/Reset switch to OPER.

(on 2CBS003A-A)

Places RPS MG Set EPA BKR to ON position (Lifts it up)

(on 2CBS003A-A)

Verifies:

Motor Gen Power IN red light LIT (on 2CBSOO3A-C)

Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i,'

Appl. To/JPM No.: 58.0P.006.251 Step 5 24 25

  • 26 5 27 28 j/

PERFORMANCr CHECKLIST t,

Page 9 of 10 Action Close EPA breaker 2CBS003A-C as follows:

Momentarily Place Oper/Reset Switch to Reset for EPA breaker 2CBS003A-C.

Confirm overvoltage, undervoltage and underfrequency lights are NOT ILLUMINATED.

EVALUATOR CUE:

Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT Place Oper/Reset Switch to OPER for EPA breaker 2CBS003A-C.

Close Electrical Protection Assembly (EPA) series breaker 2CBSOO3A-C.

At Reactor Control Rod Test Instrument Panel 2C610, Check Generator A Feed to RPS Bus A white indicating I ig ht I LLU M I NATE D.

EVALUATOR CUE:

Role-play Control room PCO and inform candidate that Generator A Feed to RPS Bus A white indicating light is LIT

  • Critical Step
  1. Critical Sequence Student Name:

Standard Inserts key into keylock switch AND Momentarily places Oper/Bkr Trip/Reset switch to RESET.

(on 2CBS003A-C)

Verifies:

Overvoltage, Undervoltage AND Underfrequency lights are NOT LIT Places Oper/Bkr Trip/Reset switch to OPER.

(on 2CBS003A-C)

Places RPS MG Set EPA BKR to ON position (Lifts it up)

(on 2CBS003A-C)

Candidate simulates Contacting Unit 2 Control room PCO to confirm white light illuminated for Generator A Feed to RPS Bus A.

Eva1 Comments STCP-QA-12SB Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

0 O

0 7

Y-Y a,

0 3 m

a I

a 7

TASK CONDITIONS A.

Reactor Startup preparations are in progress on Unit 2.

B.

RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

2004 NRC Exam As Given 1 of2

TASK CONDITIONS A.

Reactor Startup preparations are in progress on Unit 2.

B.

RPS MG Set 2S237A has been de-energized for maintenance.

C. The 120 V RPS Power Distribution Panel 2Y201A is on Alternate Power.

D. Maintenance has been completed on the RPS MG Set, and all clearance orders have been removed.

5u-INITIATING CUE Your supervisor directs you to Startup RPS MG Set A and close the EPA Breakers in preparation for returning the system to normal. It is not necessary to align the Alternate supply to RPS bus EPA breakers at this time.

2004 NRC Exam As Given 2 of 2

PENNSYLVANIA POWER & LIGHT COMPANY JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 56.0P.006.201 0

0 1 /07/04 201002 K1.06 3.213.3 Appl. To JPM Number Rev. No.

Date NUREG 1123 Sys. No.

KIA Task

Title:

Bypass Control Rod at Rod Drive Control Cabinet (RDCC) OP-256-001 Completed By: Russ Halm Reviews :

Writer Date InstructorNVriter Approval :

Requesting Supv./C.A.

Date Nuclear Trng. Supv.

Head Date Date Date of Performance:

10 Allowed Time (Min.)

Time Taken (Min.)

JPM Performed By:

Student Name:

Last First M.I.

Employee #/S.S. #

Performance

(

)

Satisfactory Eva1 ua t ion :

(

)

Unsatisfactory Evaluator Name:

Signature Typed or Printed Comments:

STCP-QA-125A Rev. 2, (9193)

Page 1 of 1 2004 NRC Exam As Given File No. A14-58

REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SlRO 56.0P.006.201 I. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:

1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

II. REFERENCES OP-256-001

, Reactor Manual Control System (RMCS) (Revision 13) 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity@):

NONE IV. TASK CONDITIONS A.

Unit 2 startup is in progress.

B.

It has been determined a fault has occurred with control rod 10-31, requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

V. INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

VI. TASK STANDARD Control rod 10-31 is bypassed and RMCS is restarted.

VII. TASK SAFETY SIGNIFICANCE Potential inadvertent reactivity addition 2004 NRC Exam As Given

1, Appl. To/JPM No.: 56.0P.006.201 Step I

2 3

4

  • 5 PERFORMANL CHECKLIST Page 3 Of 7 Action EVALUATOR NOTE:

0 This JPM must be performed in the plant.

0 Obtain permission from Shift Manager to perform this JPM.

0 Ensure the following material is available to support performance of this JPM:

0 A copy of the latest revision of OP-256-001.

Obtain a controlled copy of OP-256-001.

Selects the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

Inform the candidate all prerequisites have been met.

Review all precautions.

Using Fault Location Map on analyzer section of Rod Drive Control Instrument Panel 2C616, Upper Relay Room Determine Binary Coordinate code for control rod to be bypassed.

EVALUATOR NOTE:

2C616 is located in Upper Relay Room.

Toggle switches are located on lower right hand side of the analyzer section.

%Critical Step

  1. Critical Sequence Student Name:

Standard Controlled copy obtained.

Selects section 2.7 Ensures all prerequisites have been met.

Follows all precautions as applicable.

Determines Binary Coordinate Code for Control Rod 10-31 is:

001 00 01 001 Eva1 Comments STCP-QA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

(I Appl. TolJPM No.: 56.0P.006.201 Step

  • 6 7

8 PERFORMANCE CHECKLIST Page 4 of 7 Action At analyzer section of Panel 2C616, Position Bypassed Rod Identify switches corresponding to Binary Coordinates in UP position for values of 1 and in DOWN position for values of 0.

EVALUATOR NOTE:

UP position for values of 1 DOWN position for values of 0 At Analyzer section of Panel 2C616, position Bypassed Switch in UP position Observe ROD BYPASS light ILLUMINATES at Rod Selection Motion Control section of Unit Operating Benchboard 26651, when the bypassed control rod is selected.

  • Critical Step
  1. Critical Sequence Student Name:

Standard Using Bypassed Rod Identity switches, inserts Binary Code 00100 01001 Places Bypassed Switch in UP position.

Candidate simulates a call to the control room and requests the PCO to perform the following:

Select bypassed control rod.

Observe ROD BYPASS light ILLUMINATED Observe rod selection pushbutton lamps ILLUMINATED Observe green rod select lamp on full core display NOT ILLUMINATED.

Eva1 Comments STCP-QA-12.56 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

Appl. To/JPM No.: 56.0P.006.201 Step 9

I O PERFORMANCt CHECKLIST Action EVALUATOR CUE:

0 When the candidate indicates he would call the Control Room to verify the Rod Bypass light is illuminated on 2C651 Role-play the control room PCO and inform himlher the Bypassed control rod is SELECTED 0

ROD BYPASS light ILLUMINATED 0

Rod selection pushbutton lamps ILLUMINATED Green rod select lamp on full core display NOT ILLUMINATED.

Notify following control rod bypassed:

Reactor Engineering I & C EVALUATOR CUE:

Role-play Reactor engineering and I &C and acknowledge the report.

IF Control Rod bypassed due to a fault or component failure, Restart RMCS in accordance with section 2.1 of this procedure.

  • Critical Step
  1. Critical Sequence Student Name:

~~

Standard Candidate simulates a call to Reactor Engineering and I & C to notify them that the control rod is bypassed.

Candidate determines that restarting RMCS is appropriate based on the JPM initial conditions, which stated there was a fault.

Eva1

(

Page 5 of 7 Comments STCP-CIA-1258 Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

i Appl. To/JPM No.: 56.0P.006.201 Step 11 12

  • I3 14 j'

PERFORMANCE CHECKLIST Action EVALUATOR CUE:

If necessary, Role-play shift supervision and inform the candidate that it is desired to restart RMCS.

Selects the correct section to perform.

Review the prerequisites.

EVALUATOR CUE:

Inform the candidate all prerequisites have been met.

At Rod Drive Control Instrument Panel 2C616, Upper Relay Room, Depress and Hold RDCS Status Reset push button for minimum of 2 seconds.

EVALUATOR NOTE:

LED's in the next step are located at the very bottom of the analyzer panel.

Observe Test Counter of Phase Generator Sub Test 0, 1, & 2 LED's on analyzer section of Panel 2C616 CYCLING.

EVALUATOR CUE:

Sub Test 0,1, & 2 LEDs ARE blinking ON and OFF Student Name:

Standard Selects section 2.1 Ensures all prerequisites have been met.

Depresses and Holds:

RDCS Status Reset pushbutton for minimum of 2 seconds.

Verifies the following:

Sub Test 0, 1, & 2 LED's blinking ON and OFF Eva1 Page 6 of 7 Comments

  • Critical Step
  1. Critical Sequence STCP-QA-125B Rev. 2 (9193)

Page 1 of 1 2004 NRC Exam As Given

{'

Appl. To/JPM No.: 56.0P.006.201 Step 15 16 PERFORMAN'L CHECKLIST 4,'

Page7of7

'I Action Check no lighted LED's on Fault Location Map on analyzer section of Panel 2C616.

EVALUATOR CUE:

ALL Fault Location Map LED's are NOT LIT Observe no control rod test failures by allowing Reactor Manual Control System to cycle its tests for - five minutes.

EVALUATOR CUE:

5 minutes has passed and ALL Fault Location Map LED's are NOT LIT EVALUATOR CUE:

This completes the JPM.

%Critical Step

  1. Critical Sequence Student Name:

Standard Verifies ALL Fault Location Map LED's are NOT LIT Waits 5 minutes and then Verifies ALL Fault Location Map LED's are NOT LIT Eva1 Comments STCP-QA-125B Rev. 2 (9/93)

Page 1 of 1 2004 NRC Exam As Given

TASK CONDITIONS A.

Unit 2 startup is in progress.

B. It has been determined a fault has occurred with control rod 10-31, requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

2004 NRC Exam As Given I of2

TASK CONDITIONS A.

Unit 2 startup is in progress.

B.

It has been determined a fault has occurred with control rod 10-31, requiring it to be bypassed at the Rod Drive Control Cabinet (RDCC).

INITIATING CUE Bypass Control Rod 10-31 at the Unit 2 Rod Drive Control Cabinet (RDCC) and restart RMCS.

2004 NRC Exam As Given 2 of 2