  • ML20004C641  + (Final Interim Deficiency Rept Re Containment Internal Structure Coating.Delamination Occurred Between Two Coats of Nu-Klad 117.Spec 7220-A-56(Q) Issued for Contractor Use When Applying Decontaminable Coatings to Concrete)
  • ML17296A891  + (Final Interim Deficiency Rept Re Discovery That Stem Extension for Borg-Warner Valves Could Loosen After Cycles. Cause Not stated.C-E Will Coordinate Valve Mod Rework)
  • ML20086J995  + (Final Interim Deficiency Rept Re Failure to Incorporate Increased Support in ERCW Sys.Initially Reported on 831222. Investigation of Scope,Cause & Corrective Action Underway. Next Rept Expected by 840427)
  • ML19253B597  + (Final Interim Deficiency Rept Re Failure to Properly Include Effects of Tornado Wind Loadings on Essential Cooling Water Gantry Crane.Crane Rails Will Be Extended to Park & Locked in Event of Tornado Weather Conditions)
  • ML20055B735  + (Final Interim Deficiency Rept Re GE 10CFR21 Rept on Type Hma Auxiliary Relays Having Excess Uninsulated Flexible Leads Which Could Cause Short Circuits.Bechtel Will Perform Rework Per GE Recommendations)
  • ML19337A670  + (Final Interim Deficiency Rept Re MSIV Leakage Control Sys E32 Being installed.E23 Equipment Cannot Meet Functional Requirements to Relieve Steamline Pressure.Mods Being Implemented & Will Be Completed Prior to Fuel Load)
  • ML20072Q980  + (Final Interim Deficiency Rept Re Miscategorization of Main Feedwater & Containment Isolation Valve.Initially Reported on 810106.Seismic Category of Valves Upgraded from I(L) to I(Active).Matter Not Reportable Per 10CFR50.55(e))
  • ML17296B027  + (Final Interim Deficiency Rept Re Potential Failure of Temp Detection Controllers Used on CTI-Nuclear Air Handling & Filtration Equipment.Mcgraw Edison Issued Recall Notice to Return Controllers for Repair or Replacement)
  • ML19330B747  + (Final Interim Deficiency Rept Re RHR Heat Exchanger Lateral Support provisions.Non-standard Embed Plates Selected for re-insp.Addl Instructions Provided to Appropriate Const Supervisory & QC Insp Personnel.Insp Criteria Stressed)
  • ML19256E514  + (Final Interim Deficiency Rept Re RHR Pump Motor Svc Factor. Flow Restrictions Will Be Added to Each RHR Pump Hot Leg & Cold Leg Injection Header to Provide Pressure Drop Necessary to Prevent Pump Motor Overloading)
  • ML19332A001  + (Final Interim Deficiency Rept Re Spray Header Attachment Lug re-evaluation.Lug Attachments for Containment Spray & RHR Sys Headers Not Properly Evaluated When Supports Reanalyzed for Steel Containment Vessel Dynamic Movements)
  • ML19330B681  + (Final Interim Deficiency Rept Re Welds on Hangers Supporting RHR Spray Piping Containment Dome.One Inspector Terminated & Second Inspector Retrained & Recertified.Addl Defective Welds Repaired.Verification Program Implemented)
  • ML19331E245  + (Final Interim Deficiency Rept Re Wiring Discrepancies on HPCS Components.Discrepancies Involve Wiring Terminations Not Matching Wiring Diagrams,Missing Wires & Nonlabeling of Parts.Components Will Be Reworked)
  • ML20126L724  + (Final Interim Deficiency Rept,Originally Reported on 810227, Re Rebar Omitted from Reactor Shield Wall.Caused by Drawing Discrepancy Between Design Drawings.Holes Drilled in Reactor Shield Wall & Long Splice Bars Installed & Grouted)
  • ML20002B955  + (Final Interim Deficiency Rept,Originally Reported on 800930 Re Anaconda Co Cable Jacket Deficiencies.Defects Confined to Jackets & Footage Markings on Jackets.Defects Have No Effect on Cable Performance & Are Not Reportable Under 10CFR50.55)
  • ML20002E204  + (Final Interim Deficiency Rept,Originally Reported on 800116, Re Violation of Westinghouse Separation Criteria,For Separation of Field Run Protection & Control Circuits. Thirty-four Circuits Routed in Cable Trays)
  • ML20259A179  + (Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
  • EPID:L-2017-RNW-0016  + (Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
  • ML14080A138  + (Final Interim Report-Independent Confirmatory Survey Summary and Results for Survey Units LSA 10-06 and LSA 10-07 for the Hematite Decommissioning Project, Festus, Missouri (Rfta No. 14-003); Dcn 5184-SR-04-0)
  • ML20084B092  + (Final Interim Rept,Item 118,re Design of Controls for Nitrogen Inerting/Purge Sys Containment Isolation Valves. Initially Reported on 840309.Design Modified to Add Electrically & Physically Separated Isolation Signals)
  • ML22189A097  + (Final Interim Staff Guidance DNRL-ISG-2022-01 - Safety Review of Light-Water Reactor Construction Permit Applications)
  • ML22189A099  + (Final Interim Staff Guidance DNRL-ISG-2022-01 - Safety Review of Light-Water-Reactor Construction Permit Applications)
  • ML15051A002  + (Final Interim Staff Guidance DUWP-ISG-01 on Radon and Compliance with 20.1301 for Ur Facilities)
  • ML20202J705  + (Final Internal Regulatory Review of Florida Regulations for Control Radiation Hazards, for Ofc of State Programs)
  • ML20198G194  + (Final Internal Regulatory Review of Iowa Code Chapter 136C, Public Health Regulations Section 641,Chapters 38 & 40 for NRC Ofc of State Programs)