Final JPM Outlines for the Kewaunee Initial Exam - February 2004
ML040770901
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/02/2004
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To: Coutu T
Nuclear Management Co
References
50-305/04-301
Download: ML040770901 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Kewaunee Nuclear Power Plant Date of Examination: 02/02/04 Examination Level (circle one): RO / SRO Operating Test Number: 2004-301 Administrative Topic/Subject Description Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions A.1 Conduct of Operations:

Startup Requirements

a. Review Manual ECP Calculations (K/A = 2.1.23)

Plant Parameter Verification

b. Review Manual QPTR (K/A = 2.1.33)

A.2 Equipment Control:

Tagging /

Clearances Review a Tagout (K/A = 2.2.13)

A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)

Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)

A.4 Emergency Plan ED Duties Classification and NARs (K/A = 2.4.41)

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Kewaunee Nuclear Power Plant Date of Examination: 02/02/04 Examination Level (circle one): RO / SRO Operating Test Number: 2004-301 Administrative Topic/Subject Description Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions A.1 Conduct of Operations Startup Requirements
a. Perform ECP Calculations (K/A = 2.1.23)

Plant Parameter Verification

b. Perform a Manual QPTR (K/A = 2.1.33)

A.2 Equipment Control Tagging

/ Clearances Review a Tagout (K/A = 2.2.13)

A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)

Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)

A.4 Emergency Plan Emergency Notifications Perform Emergency Notifications (K/A = 2.4.15)

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Kewaunee Nuclear Power Plant Date of Examination: 2/2/2004 Exam Level: RO / SRO(I) / SRO(U)

Operating Test No.: 2004-301

  1. SRO-U JPMs B.1 Control Room Systems System / JPM Title Type Code*

Safety Function

a. Nuclear Instrumentation / Place Excore NIS Channel OOS D, S 7

015A403

  1. b. Chemical and Volume Control / Perform Emergency Boration N, A, S, L 1

004A401

c. A.C. Electrical Distribution / Shift Bus 5 From TAT to RAT D, S 6

062K104

d. Pressurizer Pressure Control System / Spray Valve Malfunction D, A, S 3

010A107

e. Primary RCS / Loss of Heat Sink M, A, S, L 4P 002A101
  1. f. Emergency Core Cooling System / Transfer to Containment Sump Recirculation M, S, L 2

006A405

g. Containment Spray System / Secure Containment Spray Pumps M, S, L 5

026A401 B.2 Facility Walk-Through

  1. a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator PORV D, R, L 4

068AA101

  1. b. Emergency Diesel Generators / Locally Operate Diesel Generator M, A, L 6

064A401

  1. c. Pressurizer Pressure Control / RCS Depressurization from the DSP N, L 3

068AA12

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
  1. SRO-U JPMs