Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13079A818 + (Entergys Unopposed Motion for Leave to File and Request the Admission of Two New Hearing Exhibits Related to Contention NYS-5 (Buried Piping))
- ML061170063 + (Entergys Unopposed Motion for an Extension of the Time to Answer New England Coalitions Proposed New Contention)
- ML050550282 + (Entergys Unopposed Motion to Change Discovery Update Period)
- ML062860146 + (Entergys Unopposed Motion to Defer Initial Disclosures)
- ML15265A586 + (Entergys Unopposed Motion to Extend the Time to Appeal LBP-15-24)
- ML050350252 + (Entergys Unopposed Motion to Stay Discovery on Department of Public Service Contention 6)
- ML050610404 + (Entergys Unopposed Motion to Withdraw Its Motion to Compel Discovery from the New England Coalition)
- ML13183A063 + (Entergys, Pilgrim, Answer to the June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109))
- 0CAN051202, Entergy’S 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments + (Entergy’S 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments)
- JAFP-13-0088, Entergy’S Answer to the June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) + (Entergy’S Answer to the June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109))
- JAFP-13-0024, Entergy’S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (Entergy’S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050))
- GNRO-2013/00032, Entergy’S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (Entergy’S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- 05000275/FIN-2012003-07 + (Entering a High Radiation Area with Dose Rates Greater than 1.0 Rem/Hour Without Knowing the Dose Rates in the Area)
- 05000255/FIN-2009004-02 + (Entering a High Radiation Area without an adequate awareness of radiological conditions)
- ML18226A321 + (Enterprise File Synchronization and Sharing (Efss) Privacy Impact Assessment)
- ML20085F054 + (Enterprise File Synchronization and Sharing (Efss) Privacy Impact Assessment)
- ML21307A162 + (Enterprise File Synchronization and Sharing (Efss) Privacy Impact Assessment)
- ML23348A317 + (Enterprise File Synchronization and Sharing (Efss) Privacy Impact Assessment)
- ML18275A325 + (Enterprise Project Management Pia 2018)
- ML20009C762 + (Enterprise Project Management System EPM)
- ML23341A155 + (Enterprise Vetting Center/Law Enforcement Enterprise Portal (EVC-LEEP) - Privacy Impact Assessment (Pia))
- ML20203M579 + (Enters Appeal Due to Lack of Response to FOIA Request 97-473)
- ML030580471 + (Entire DAEC Emergency Plan (Table of Contents Rev) (Copy 91))
- ML023020453 + (Entire EAL Basis Document (Table of Contents Rev) (Copy 91))
- ML022910276 + (Entire EAL Basis Document (Table of Contents Rev) (Copy 91))
- ML023020449 + (Entire EPIP Document (Copy 28))
- ML20116L965 + (Entire Feedwater Sys License Renewal Technical Rept, for License Renewal Technical Rept Template Phase 2 Development)
- ML20138C614 + (Entire Revised TSs for Triga Mark I Reactor)
- ML20079N034 + (Entrainment & Impingement Studies at Oyster Creek Nuclear Generating Station,1984 - 1985)
- ML19064B237 + (Entrainment Characterization Study 2012)
- ML19343D230 + (Entrainment and Deposition Studies in TWO-PHASE Cross Flow: Comparison Between AIR-WATER and STEAM-WATER in a Square Horizontal Duct)
- NL-08-023, Entrainment and Impingement at IP2 and IP3: a Biological Impact Assessment + (Entrainment and Impingement at IP2 and IP3: a Biological Impact Assessment)
- ML20212M394 + (Entrainment of Developing Plume Into Convective Cells)
- ML14356A180 + (Entrance)
- ML090410538 + (Entrance Meeting; SBO Diesel Modification Inspection; 11AM, Gsb Room 441)
- ML20261D134 + (Entrance Railroad & Switchyard Grading Plan, as-built. Consists of Two Aperture Cards)
- ML20261D140 + (Entrance Railroad Switchyard Grading a Sections, as-built)
- ML24260A045 + (Entrance on Duty System (Eods) Pia)
- ML25119A177 + (Entrance on Duty System (Eods) Pia)
- ML19262C583 + (Entropy Minimax Analysis of Simulated LOCA Burst Data, Prepared for AEC)
- ML20041B933 + (Entropylike Function for Neutron Chain Reacting Sys, Submitted to Nuclear Science & Engineering for Consideration)
- ML19332C812 + (Entry & Decontamination of Reactor Containment Bldg at TMI-2,Highlights of Planning Study, Presented at 790813 Briefings)
- ML18296A482 + (Entry Criteria-Operability Responsibility Public Meeting Feedback 10-3-18 Final)
- ML19352E138 + (Entry Int. Wolf Creek General Support Services Agreement with Evergy Inc. Entities)
- ENS 49706 + (Entry Into & Exit from Technical Specification 3.6.5.1.1 Due to Open Air Lock Doors)
- 05000416/FIN-2013005-03 + (Entry Into A High Radiation Area Without A Required Radiation Monitoring Device)
- 05000261/LER-2004-002, Entry Into Mode 3 with the Steam Driven Auxiliary Feedwater Pump Flowpath Inoperable + (Entry Into Mode 3 with the Steam Driven Auxiliary Feedwater Pump Flowpath Inoperable)
- 05000482/LER-2008-006, Entry Into Mode 4 Without an Operable Containment Spray System + (Entry Into Mode 4 Without an Operable Containment Spray System)
- ML032550172 + (Entry Into Mode 4 and Mode 3)
- 05000482/LER-2021-001, Entry Into Mode 4 with Excessive Containment Valve Leakage Resulted in a Condition Prohibited by Technical Specifications + (Entry Into Mode 4 with Excessive Containment Valve Leakage Resulted in a Condition Prohibited by Technical Specifications)
- ENS 41330 + (Entry Into Technical Specification Required Shut Down Due to Loss of Essential Bus)