Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc Project stage: Request BVY 14-078, Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate2014-12-19019 December 2014 Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate Project stage: Request BVY 14-082, Update to Decommissioning Funding Status Report2014-12-19019 December 2014 Update to Decommissioning Funding Status Report Project stage: Request BVY 14-085, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2014-12-19019 December 2014 Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) Project stage: Request BVY 15-002, Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv)2015-01-0606 January 2015 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) Project stage: Request ML15061A5162015-03-0202 March 2015 SRM-SECY-14-0125: Request by Entergy Nuclear Operations, Inc. for Exemptions from Certain Emergency Planning Requirements Project stage: Other ML15082A2342015-03-0606 March 2015 Comment (6) by William Irwin, on Behalf of State of Vermont Department of Health, Re Vermont Yankee Nuclear Power Station Post-Shutdown Decommissioning Activities Report Project stage: Request ML15120A4772015-04-30030 April 2015 (Corrected) Referral Memorandum to the Atomic Safety and Licensing Board Project stage: Request ML15135A5232015-05-15015 May 2015 NRC Staff Answer to State of Vermont Petition for Leave to Intervene and Hearing Request Project stage: Request ML15135A4982015-05-15015 May 2015 Entergy Answer Opposing Vermont Petition to Intervene Project stage: Request ML15142A9022015-05-22022 May 2015 State of Vermont'S Reply to NRC Staff and Entergy Answers to Petition for Leave to Intervene and Hearing Request Project stage: Request ML15168A2632015-06-17017 June 2015 Order (Scheduling Oral Argument) Project stage: Request ML15169A2482015-06-18018 June 2015 Notification of Issuance of Exemptions Project stage: Approval ML15183A3742015-07-0202 July 2015 State of Vermont'S Notice of Supplemental Authority Project stage: Request ML15187A3502015-07-0606 July 2015 State of Vermont'S Motion for Leave to File a New Contention Including the Proposed New Contention and to Add Additional Bases and Support to Existing Contentions I, III, and IV Project stage: Request ML15190A1502015-07-0707 July 2015 Hearing Transcript for Entergy Nuclear Vermont Yankee Teleconference, July 7, 2015 Pages 1-78 Project stage: Request ML15212A2812015-07-31031 July 2015 NRC Staff Answer to the State of Vermont Motion for Leave to File New and Amended Contentions Project stage: Request ML15212A8252015-07-31031 July 2015 Entergy Answer Opposing State of Vermont New Contention V and Additional Bases for Pending Contentions I, III, and IV Project stage: Request ML15219A7122015-08-0707 August 2015 State of Vermont'S Reply in Support of Motion for Leave to File a New Contention and Add Bases and Support to Existing Contentions Project stage: Request BVY 15-047, Pre-Notice of Disbursement from Decommissioning Trust2015-08-13013 August 2015 Pre-Notice of Disbursement from Decommissioning Trust Project stage: Request BVY 15-051, Pre-Notice of Disbursement from Decommissioning Trust2015-09-14014 September 2015 Pre-Notice of Disbursement from Decommissioning Trust Project stage: Request ML15260B2782015-09-17017 September 2015 Joint Motion on Mandatory Disclosures and Schedule Project stage: Request ML15261A7232015-09-18018 September 2015 Notice of Hearing Project stage: Request ML15264A8862015-09-21021 September 2015 Initial Scheduling Order Project stage: Request ML15265A5862015-09-22022 September 2015 Entergy'S Unopposed Motion to Extend the Time to Appeal LBP-15-24 Project stage: Request ML15265A5832015-09-22022 September 2015 Entergy'S Motion to Withdraw Its September 4, 2014 License Amendment Request Project stage: Request ML15275A3222015-10-0202 October 2015 Staff Answer to Motion to Withdraw Project stage: Request ML15275A4382015-10-0202 October 2015 State of Vermont'S Response to Entergy'S Motion to Withdraw Project stage: Request ML15299A2602015-10-26026 October 2015 NRC Staff Motion to Vacate LBP-15-24 Project stage: Request ML15309A7592015-11-0505 November 2015 State of Vermont'S Response to NRC Staff'S Motion to Vacate LBP-15-24 Project stage: Request ML15309A7582015-11-0505 November 2015 State of Vermont'S Notice to Board of Petition Filed with Commissioners Project stage: Request ML15314A8222015-11-10010 November 2015 Order of the Secretary Project stage: Request ML15336A7122015-12-0202 December 2015 Commission Notification of Significant Licensing Action Project stage: Request ML15341A3612015-12-0707 December 2015 NRC Staff Answer to Vermont Petition for Review of Entergy Nuclear Operation Inc., Planned Use of the Vermont Yankee Nuclear Decommissioning Trust Fund Project stage: Request ML15343A2102016-01-29029 January 2016 Post-Shutdown Decommissioning Activities Report Project stage: Other 2015-05-22
[Table View] |
Entergy'S Unopposed Motion to Extend the Time to Appeal LBP-15-24ML15265A586 |
Person / Time |
---|
Site: |
Vermont Yankee File:NorthStar Vermont Yankee icon.png |
---|
Issue date: |
09/22/2015 |
---|
From: |
Bessette P, Burdick S, Raimo S Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Entergy Services, Morgan, Morgan, Lewis & Bockius, LLP |
---|
To: |
NRC/OCM |
---|
SECY RAS |
References |
---|
50-271-LA-3, ASLBP 15-940-03-LA-BD01, RAS 28308 |
Download: ML15265A586 (5) |
|
|
---|
Category:Legal-Motion
MONTHYEARML18348A9852018-12-14014 December 2018 New England Coalition'S Withdrawal of Its Request for a Hearing and Petition for Leave to Intervene ML18071A4142018-03-12012 March 2018 Amended Motion to Hold in Abeyance Action on New England Coalition'S Petition for Leave to Intervene and Hearing Request in Consideration of Anticipated Withdrawal ML17164A2682017-06-13013 June 2017 Attachment Two - Five E-mails Tracing Efforts on June 9, 2017 to File a Request for an Extension of Time ML17164A2382017-06-13013 June 2017 Resubmitted Request for Extension of Time to File Request for Hearing and Petition for Leave to Intervene ML17164A2392017-06-13013 June 2017 Request for Leave to Reply and Reply to Applicants' Response to New England Coalition'S Request for Extension ML16005A6232016-01-0505 January 2016 Unopposed Motion by the States for an Enlargement of Time to File an Answer to Entergy Motion to Strike the States Reply ML15362A5192015-12-28028 December 2015 Entergy Motion to Strike Impermissible December 17, 2015 Reply Filed by the Commonwealth of Massachusetts and the States of Connecticut and New Hampshire ML15362A4902015-12-28028 December 2015 Motion to Strike Portions of December 17, 2015, Reply Filed by the State of Vermont, Vermont Yankee Nuclear Power Corporation, and Green Mountain Power Corporation ML15299A2602015-10-26026 October 2015 NRC Staff Motion to Vacate LBP-15-24 ML15286A4422015-10-13013 October 2015 Entergy Motion for Leave to File Reply and Reply Re Motion to Withdraw LAR ML15275A3222015-10-0202 October 2015 Staff Answer to Motion to Withdraw ML15271A3112015-09-23023 September 2015 Federal Respondents' Motion for Extension of Time to File Dispositive Motions and Certified Index 9-23-15 ML15265A5832015-09-22022 September 2015 Entergy'S Motion to Withdraw Its September 4, 2014 License Amendment Request ML15265A5862015-09-22022 September 2015 Entergy'S Unopposed Motion to Extend the Time to Appeal LBP-15-24 ML15260B2782015-09-17017 September 2015 Joint Motion on Mandatory Disclosures and Schedule ML15201A1752015-07-20020 July 2015 Joint Proposed Corrections to Oral Argument Transcript Held on July 7, 2015 ML15072A4622015-03-13013 March 2015 Entergy Answer Opposing State of Vermont'S Motion to Stay the License Amendment Proceeding Pending Commission Reconsideration ML14352A2082014-12-18018 December 2014 NRC Staff Answer to State of Vermont'S Submission of Additional Information and Request to File Supplemental Briefing Addressing New Information and Argument Raised at Oral Argument ML12088A0852012-03-15015 March 2012 Fed Respondents Opposition to Motion to Strike No.11-1168 and 11-1177 (Consolidated) ML12067A0892012-03-0707 March 2012 State of Vermont Motion to Strike, Petitioners' Motion to Strike Four Extra-Record References Contained in Respondents' Recently Filed Amended Certified Index of the Record and in Respondents' and Interveners Briefs ML12066A1772012-03-0606 March 2012 Petitioners Motion to Strike Amended Cert 11-1168 ML1107703932011-03-10010 March 2011 Motion to Stay Any and All Final Commission Decisions in the Matter of 50-271 Lr and Request for Hearing on Entergy License Renewal Application Amendments Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 ML1027204012010-09-23023 September 2010 Entergy'S Motion to Strike the Declaration of Paul Blanch ML1025800092010-09-14014 September 2010 NRC Staff'S Opposition to New England Coalition'S Motion to Reopen the Hearing and Answer to Proposed New Contention and Affidavit of Roy K. Mathew ML1024200422010-08-20020 August 2010 New England Coalition'S Motion to Reopen the Hearing and for the Admission of New Contentions ML1006304252010-03-0202 March 2010 New England Coalition'S Petition for Review of Licensing Board'S Full Initial Decision ML0921509462009-08-0303 August 2009 NRC Staff'S Answer to Nec'S Petition for Review of the Licensing Board'S Full Initial Decision, LBP-09-09 ML0917405782009-06-15015 June 2009 New England Coalition'S Request for Leave to Reply to Entergy'S Answer to Nec'S Request for Extension of Time to Reply to Entergy NRC Staff Oppositions to New England Coalition'S Motion for Leave to File a Timely New Contention ML0916702672009-06-10010 June 2009 Entergy'S Oppositions to Nec'S Request for an Ex-Post-Facto Extension of Time to File a Reply to the NRC Staff and Entergy'S Oppositions to Nec'S Motion to File a Timely New Contention ML0916000212009-06-0808 June 2009 Vermont Yankee - NRC Staff'S Answer to Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0916101422009-06-0202 June 2009 Entergy'S Motion to Strike New England Coalition'S Reply to NRC Staff and Entergy Oppositions to Nec'S Motion to File a Timely New Contention ML0913907852009-05-19019 May 2009 Vermont Yankee - NRC Staff'S Answer in Opposition to Nec'S Motion for Leave to File a New Contention ML0912100122009-04-30030 April 2009 NRC Staff'S Answer in Opposition to NEC Motion to Hold in Abeyance Action on Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0912005142009-04-24024 April 2009 New England Coalition, Inc.'S Motion for Leave to File a Timely New Contention and Motion to Hold in Abeyance Action on This Proposed Contention Until Issuance of NRC Staff Supplemental Safety Evaluation Report ML0906800032009-03-0606 March 2009 Oyster Creek - Notice of Appearance of Maxwell Smith and Notice of Withdrawal of Mary Baty ML0906800082009-03-0606 March 2009 Vermont Yankee - Notice of Appearance of Maxwell Smith and Notice of Withdrawal of Mary Baty ML0907711412009-03-0606 March 2009 New England Coalition'S Motion to Alter or Amend the Schedule in the Above Captioned Proceeding ML0902601102009-01-26026 January 2009 Vermont Yankee - NRC Staff'S Answer in Opposition to Nec'S Motion for Leave to Reply ML0903501142009-01-25025 January 2009 Vermont Department of Public Service Unopposed Motion for Extension of Time to Respond to Energy'S Confirmatory Cufen Analyses ML0903606582009-01-23023 January 2009 Entergy'S Opposition to New England Coalition'S Motion for Leave to Reply ML0903001122009-01-14014 January 2009 New England Coalition'S Motion for Leave to Reply to NRC Staff and Entergy Nuclear Vermont Yankee, L.L.C., and Entergy Nuclear Operations, Inc.'S Answers to New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial ML0900800242009-01-0707 January 2009 Vermont Yankee - NRC Staff'S Answer in Opposition to New England Coalition'S Motion for Reconsideration and Notice of Withdrawal of Jessica Bielecki ML0835900532008-12-23023 December 2008 Vermont Yankee - NRC Staff'S Reply to Nec'S Answer to NRC Staff'S Petition for Review of LBP-08-25 ML0835900722008-12-23023 December 2008 Vermont Yankee - NRC Staff'S Reply to Motion to Submit Brief Amicus Curiae ML0900202572008-12-19019 December 2008 Motion for Leave by the States of New York and Connecticut, Et. Al., to Submit Brief Amici Curiae in Opposition to Staff'S Petition for Review and in Support of Intervenors State of Vermont and the New England Coalition ML0901603582008-12-17017 December 2008 New England Coalition'S Motion for Reconsideration of the Licensing Board'S Partial Initial Decision ML0836593462008-12-15015 December 2008 New England Coalition, Inc.'S Motion for a Second Extension of Time in Which to File a Motion for Reconsideration ML0835304522008-12-12012 December 2008 the State of New York, V USNRC and Entergy Nuclear Operations Inc; 08-3903-ag(L)/08-4833-ag(CON) - Motion Out of Time 2018-03-12
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
)
In the Matter of: )
) Docket No. 50-271-LA-3 ENTERGY NUCLEAR VERMONT YANKEE, LLC )
AND ENTERGY NUCLEAR OPERATIONS, INC. )
) September 22, 2015 (Vermont Yankee Nuclear Power Station) )
)
ENTERGYS UNOPPOSED MOTION TO EXTEND THE TIME TO APPEAL LBP-15-24 By way of background, Entergy Nuclear Operations, Inc. submitted a license amendment request (LAR) on September 4, 2014 seeking approval from the Nuclear Regulatory Commission (NRC) to delete certain conditions in the Vermont Yankee Nuclear Power Station (Vermont Yankee) operating license related to nuclear decommissioning trust funds, and instead comply with requirements in 10 C.F.R. § 50.75(h).1 In response to a February 17, 2015 Federal Register notice,2 the State of Vermont (State) filed a Petition for Leave to Intervene and Hearing Request challenging the LAR.3 The Atomic Safety and Licensing Board (Board) 1 BVY 14-062, Letter from C. Wamser, Entergy, to NRC Document Control Desk, Proposed Change No. 310 -
Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions (Sept. 4, 2014) (LAR), available at ADAMS Accession No. ML14254A405.
2 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 80 Fed. Reg. 8355, 8359 (Feb. 17, 2015) (Notice of Proposed Action).
3 State of Vermonts Petition for Leave to Intervene and Hearing Request (Apr. 20, 2015). The State also later filed a motion seeking to proffer a new contention and additional bases for pending contentions. See State of Vermonts Motion for Leave to File a New Contention Including the Proposed New Contention and to Add Additional Bases and Support to Existing Contentions I, III, and IV (July 6, 2015).
issued LBP-15-24 on August 31, 2015 granting the hearing request and admitting two contentions.4 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
(Entergy) disagree with the Boards decision in LBP-15-24 and have been considering appealing LBP-15-24 to the Commission. The NRC Staff also could decide to appeal LBP 24. Such appeals are authorized by 10 C.F.R. § 2.311. Under 10 C.F.R. § 2.311(b), and the terms of LBP-15-24,5 Entergy and the NRC Staff have 25 days after the August 31, 2015 service of LBP-15-24 (until September 25, 2015) to appeal the Boards decision.
Additionally, Entergy now has determined that maintaining the existing license conditions that would have been removed by the LAR represents a manageable administrative burden and is allowed by the NRC regulations.6 Therefore, Entergy submitted a motion to the Board earlier today seeking to withdraw the LAR pursuant to 10 C.F.R. § 2.107(a) (Withdrawal Motion).7 With this background, Entergy submits this unopposed Motion, pursuant to 10 C.F.R. §§ 2.307 and 2.323, to extend the time for Entergy and the NRC Staff to file appeals of LBP-15-24 with the Commission under 10 C.F.R. § 2.311, pending the outcome of the Withdrawal Motion.
Specifically, Entergy requests that the Commission extend the deadline for such appeals until 10 days after the Boards ruling on the Withdrawal Motion. For the reasons discussed below, Entergy has good cause under 10 C.F.R. § 2.307(a) to extend the deadline for the appeals.
4 See Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), LBP-15-24, 82 NRC __, __ (slip op.) (Aug. 31, 2015).
5 Id. at 45.
6 See 10 C.F.R. § 50.75(h)(5); see also Decommissioning Trust Provisions, 67 Fed. Reg. 78,332, 78,335 (Dec.
24, 2002) (licensees will have the option of maintaining their existing license conditions or submitting to the new requirements).
7 Entergys Motion to Withdraw Its September 4, 2014 License Amendment Request (Sept. 22, 2015).
2
As noted above, Entergy submitted the Withdrawal Motion to the Board earlier today seeking to withdraw the LAR that is the subject of LBP-15-24. Entergy anticipates that the Board will grant the withdrawal request,8 which would moot this proceeding9 and obviate the need for any appeal of LBP-15-24. This would save significant resources of the parties and the Commission. Nonetheless, uncertainty remains regarding the nature of the Boards ruling on the Withdrawal Motion and the Board may not rule on the Withdrawal Motion prior to September 25, 2015, the last day for Entergy and the NRC Staff to appeal LBP-15-24.10 Entergy desires to preserve any rights regarding appeals of LBP-15-24 until it has considered the outcome of the Withdrawal Motion. Extending the appeal deadline, rather than requiring Entergy and the NRC Staff to submit appeals under 10 C.F.R. § 2.311 that likely will be unnecessary, will preserve the resources of Entergy and the NRC Staff in preparing appeals, the resources of the State in responding to any appeals, and the resources of the Commission in considering any appeals.
For these reasons, good cause exists to extend the time for Entergy and the NRC Staff to appeal the Boards decision in LBP-15-24 to the Commission under 10 C.F.R. § 2.311, until 10 days after the Boards ruling on Entergys September 22, 2015 Withdrawal Motion.
Accordingly, Entergy requests that the Commission grant this Motion.
8 See, e.g., Sequoyah Fuels Corp. (Source Material License No. SUB-1010), LBP-93-25, 38 NRC 304, 315-16 (1993) (discussing an applicants unqualified right to withdrawal absent legal prejudice), affd, CLI-95-2, 41 NRC 179 (1995).
9 The scope of the proceeding is limited to the LAR. See Notice of Proposed Action, 80 Fed. Reg. at 8359.
10 See Vermont Yankee, LBP-15-24, 82 NRC at __ (slip op. at 45); 10 C.F.R. § 2.311(b).
3
Counsel for Entergy certifies under 10 C.F.R. § 2.323(b) that the movant has made a sincere effort to contact the other parties in this proceeding and resolve the issues raised in this Motion. Neither the NRC Staff nor the State objects to this Motion to extend the time to file appeals of LBP-15-24.
Respectfully submitted, Executed in Accord with 10 C.F.R. § 2.304(d)
Susan H. Raimo, Esq. Paul M. Bessette, Esq.
Entergy Services, Inc. Stephen J. Burdick, Esq.
101 Constitution Avenue, N.W. Morgan, Lewis & Bockius LLP Washington, D.C. 20001 1111 Pennsylvania Avenue, N.W.
Phone: (202) 530-7330 Washington, D.C. 20004 Fax: (202) 530-7350 Phone: (202) 739-5796 E-mail: sraimo@entergy.com Fax: (202) 739-3001 E-mail: pbessette@morganlewis.com E-mail: sburdick@morganlewis.com Counsel for Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
Dated in Washington, DC this 22nd day of September 2015 4
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
)
In the Matter of: )
) Docket No. 50-271-LA-3 ENTERGY NUCLEAR VERMONT YANKEE, LLC )
AND ENTERGY NUCLEAR OPERATIONS, INC. )
) September 22, 2015 (Vermont Yankee Nuclear Power Station) )
)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, copies of the foregoing Entergys Unopposed Motion to Extend the Time to Appeal LBP-15-24 were served upon the Electronic Information Exchange (the NRCs E-Filing System) in the above-captioned proceeding.
Signed (electronically) by Ryan K. Lighty Ryan K. Lighty, Esq.
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, D.C. 20004 Phone: (202) 739-5274 Fax: (202) 739-3001 E-mail: rlighty@morganlewis.com DB1/ 84726360