Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML041620486 + (Draft Section C Operating for Salem, Units 1 and 2)
- ML041890341 + (Draft Section a Operating)
- ML033090626 + (Draft Section a Operating)
- ML042190033 + (Draft Section a Operating)
- ML041400376 + (Draft Section a Operating)
- ML041060130 + (Draft Section a Operating)
- ML033160342 + (Draft Section a Operating)
- ML042730350 + (Draft Section a Operating (RO & SRO) (Folder 2))
- ML041620461 + (Draft Section a Operating for Salem, Units 1 and 2)
- ML23354A258 + (Draft Security RAI Rev 1)
- ML19203A219 + (Draft Secy Paper - Population - Related Siting Considerations for Advanced Reactors)
- ML19078A240 + (Draft Secy Paper and Guidance Documents to Implement a Technology-Inclusive, Risk-Informed, and Performance-Based Approach to Inform the Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors)
- ML18108A404 + (Draft Secy Paper, Functional Containment Performance Criteria for Non-Light Water Reactor Designs)
- ML22290A177 + (Draft Secy White Paper on Licensing and Regulating Fusion Energy Systems October 5-7, 2022 Full Committee)
- ML22294A159 + (Draft Secy White Paper on Licensing and Regulating Fusion Energy Systems October 5-7, 2022 Full Committee)
- ML19010A160 + (Draft Seep Monitoring Evaluation Report Mexican Hat, Utah, Umtrca Title I Disposal Site)
- ML20210T959 + (Draft Seismic & Dymanic Qualification of Safety-Related Electrical & Mechanical Equipment in Operating Nuclear Power Plants. Supporting Documentation Encl)
- ML20239A626 + (Draft Seismic Effects on Bodega Bay Reactor. Related Info Encl)
- ML20003A096 + (Draft Seismic Evaluation of Bldg 102 of GE Vallecitos Nuclear Ctr)
- ML20126D952 + (Draft Seismic Hazard Analysis for Savannah River Plant,Sc)
- ML19249B997 + (Draft Seismic Hazard Analysis:Methodology for Eastern Us)
- ML19249C008 + (Draft Seismic Hazard Analysis:Site Specific Response Spectra Results)
- ML111720634 + (Draft Seismic Information Evaluation Flowchart)
- ML19257C273 + (Draft Seismic Re-evaluation Program Criteria Document)
- ML19268B868 + (Draft Seismic Review of Unit for Systematic Evaluation Program Phase 1 Rept)
- ML20204E912 + (Draft Seismic Verification Program)
- ML20234F515 + (Draft Seismicity & Tsunami Rept Bodega Head,Ca)
- ML19338G041 + (Draft Senior Reactor Operator Level Instructor Certification Guide)
- ML14261A276 + (Draft September 23, 2014, Category 1 Public Meeting with V. C. Summer - Draft License Amendment Related to Approval of the Technical Support Center)
- ML20095C690 + (Draft Sequoyah Nuclear Plant Integrated Containment Analysis, Technical Rept)
- ML20128G797 + (Draft Ser,Pump & Valve Inservice Testing Program,Millstone Nuclear Power Station,Unit 1)
- ML20128G780 + (Draft Ser,Pump & Valve Inservice Testing Program,Millstone Nuclear Power Station,Unit 1,for Second 10-Yr Interval)
- ML20065S869 + (Draft Setpoint Calculation for RPS Turbine Control Valve Fast Closure Trip Function)
- ML19102A322 + (Draft Shine Medical Technologies, Inc. - Conforming Amendment to Construction Permit No. CPMIF-001)
- ML13221A393 + (Draft Shine Response to Proposed Action Request 5)
- ML20073K864 + (Draft Site Characterization Analysis of the Site Characterization Report for the Basalt Waste Isolation Project.Main Report and Appendices a Through D)
- ML20069J686 + (Draft Site Characterization Analysis of the Site Characterization Report for the Basalt Waste Isolation Project)
- ML20073L030 + (Draft Site Characterization Analysis of the Site Characterization Report for the Basalt Waste Isolation Project.Appendices E-W)
- ML19331C233 + (Draft Site Dependent Response Spectra)
- ML20080S676 + (Draft Site Redress Plan)
- ML20128C120 + (Draft Site Rept for Plant on 730424 & 25.Related Info Encl)
- ML062770324 + (Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary))
- ML24100A070 + (Draft Slides for 04/30/2024 Meeting on Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components)
- ML23137A116 + (Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies)
- ML23137A114 + (Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies)
- ML23130A386 + (Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LLA-0097) (Letter))
- ML15156B352 + (Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3)
- ML22130A727 + (Draft Slides to ACRS Subcommittee on CCF Secy Paper Presentation, May 20, 2022)
- ML20126G656 + (Draft Soil Decontamination Criteria for Decommissioning of United Nuclear Corp Resources Co Facility)
- ML20148K421 + (Draft Sorv Procedure LOA-NB-02, Failure of Relief Valve to Seat Properly or Inadvertent Actuation of Safety Relief Valve)
- ML20137Q316 + (Draft Sp 24.324.01 CTG-11-1 Monthly Operability Check)