|
---|
Category:Slides and Viewgraphs
MONTHYEARML24264A1592024-09-30030 September 2024 Adtf Exemption Request Pre-submittal Meeting Presentation ML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23223A2032023-08-11011 August 2023 (ANO) Unit 1 Licensees Slide Presentation for 8/15/23 Public Meeting Pressurizer Heaters ML23122A1012023-05-0202 May 2023 Assessment Presentation 2022 ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22124A0692022-05-10010 May 2022 RVCH Penetration No. 1 Relief Request Public Meeting May 10, 2022 (EPID L-2022-LRM-0036) (Slides) ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor 0CAN062101, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling2021-06-15015 June 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling ML21095A2122021-04-0808 April 2021 Pre-Submittal Meeting - ANO-1 LAR Related to RCS Primary Activity and Primary-to-Secondary Leak Rate ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A1982021-01-15015 January 2021 Relocate Toxic Gas Monitoring Technical Specifications to Technical Requirements Manual License Amendment Request - NRC Pre-submittal Meeting ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2020-0002, Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-01-0808 January 2020 Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17328A3652017-11-30030 November 2017 Workshop on Sharing Operating Experience from Rigging, Lifting and Load Handling Events - Temporary Overhead Crane Failure at Arkansas Nuclear One Presented to IAEA ML17318A1232017-11-16016 November 2017 Licensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System ML17306A1652017-11-0202 November 2017 Updated Licensee Slide Presentation for October 19, 2017 Category 1 Meeting Regarding Raptor ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML17158B1502017-06-0808 June 2017 Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3 ML17151A2952017-06-0101 June 2017 6/1/2017, Meeting Slide for Pre-Submittal Meeting Regarding Ultimate Heat Sink Technical Specification Change Request for Waterford 3 ML17101A6482017-04-11011 April 2017 Public Meeting Slides ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) 2024-09-04
[Table view] |
Text
Westinghouse Non-Proprietary Class 3 Draft Slide Presentation for the NRC/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
© 2006 Westinghouse Electric Company LLC All Rights Reserved
Westinghouse Non-Proprietary Class 3 DRAFT Implementation of Improved Fuel Design for CE 16x NSSS Presentation to NRC October 19, 2006 White Flint, Rockville, MD Tom Rodack &Zeses Karoutas (Westinghouse) and Dana Millar (Entergy)
- BNFL Slide 1 GWestinghouse
DRAFT
-Agenda
" Meeting Objectives
" Background
- Topical Reports Supporting Design Implementation
DRAFT Meeting Objectives
- Explain why Next Generation Fuel will be deployed for CE 16 NSSS
- Present overall licensing plan
" Provide an opportunity for NRC feedback Slide 3
DRAFT
Background
- Westinghouse fully supports INPO initiative to drive to zero fuel leakers by 2010
- Zero Leaking Fuel a strategic objective since 2004
- Grid-to-rod fretting is the primary PWR leaker mechanism
- Fretting leakers typically occur in thrice burned fuel
[ ]a,c
. [ I a,c
- Improvements being discussed or implemented on designs for all fuel currently supplied Slide 4 Slide 4 ~OWesfingtiouse
DRAFT Fuel Performance Overview by Product a, c Slide 5
DRAFT
Background
- CE 16 Next Generation Fuel is key to promoting zero leakers in CE NSSS
- Significant increase in grid-to-rod fretting margin
" CE NGF features same type of spacer grid as 14x TURBO fuel that has demonstrated improved grid-to-rod fretting performance
- Increases other design and operating margins
° CE 16 NGF LTAs in 1st cycle at Waterford
- Scheduled for exam in December 0 Region deployment planned for Spring 2008 in ANO-2 and Waterford
- BNFL Slide 6 OWestinghouse
DRAFT Implementation of Improved Designs for CE NSSS a, c
~Westinghouse Slide 77
DRAFT CE 16 NGF Fuel Design Zeses Karoutas
- BNFL Slide 8 S 8Westinghouse
DRAFT CE 16x NGF Fuel Design a, c
- )BNFL Slide 9 OWestinghouse
DRAFT General Program Status a, c
~Westinghouse 10 Slide 10
DRAFT Topical Reports Supporting CE 16 NGF Implementation Zeses Karoutas
- DBNFL Slide 11 OWestinghouse
DRAFT Core Reference Report (WCAP-1 6500-P) 0 Submitted February 28,2006 a, c
- )BNFL Slide 12 OWestinghouse
DRAFT Critical Heat Flux Correlation Report (WCAP-1 6523-P)
° Submitted March 20, 2006
- New DNB correlation form similar to ABB-NV &ABB-TV correlations approved in Topical CENPD-387-P-A a, c Westinghouse
DRAFT LOCA Model Grid Heat Transfer (CENPD-1 32-P-A, Sup. 4-P, Add. I -P)
° Submitted
- As Appendix to Core Reference Report February 28, 2006
- Re-submitted separately at NRC's request May 11, 2006 a, c 2
- BNFL Slide 14 OWestingtiouse
DRAFT Optimized ZIRLOTM Report (CENPD-404-P-A Add. I-A)
Provides the basis for use of Optimized ZIRLO T cladding in fuel for CE and W NSSS M
Approved June 10, 2005 a, c Slide 15
DRAFT NGF Implementation Plan for ANO-2 and Waterford Dana Millar Slide 16
DRAFT Implementation Plan Summary
- License Amendment Requests (LARs) planned to be submitted for both ANO-2 and Waterford Requests for Exemption from 10 CFR 50.46 and Appendix Kto be submitted because of Optimized ZIRLOTM cladding PLACEHOLDER TO PROVIDE, OVERVIEW OF CONTENT SLIDE WILL BE REVISED
- BNFL Slide 17 (Westinghbuse
DRAFT Topical Report Status and Summary Tom Rodack Slide 18
DRAFT Licensing Scope
" License Amendment requests for implementation of NGF in ANO-2 and Waterford will reference:
- Core Reference Report (WCAP-1 6500-P)
- Critical Heat Flux Correlation Report (WCAP-1 6523-P)
- Improved LOCA Model (CENPD-i 32-P-A, Sup. 4-P, Add. I-P)
- Request for Exemption from 10 CRF 50.46 and Appendix Kwill also be required for Optimized ZIRLOTh
- Optimized ZIRLOT Report (CENPD-404-P-A Add. 1-A)
- BNFL Slide 19 eWesfing~house
DRAFT Licensing Status
-a, C 9 BNFL Slide 20 Se)Westinghouse
DRAFT Summary
" Deployment of CE 16 NGF design is key to reducing fuel leakers
" Topical reports supporting the design are under review and receiving attention
" Plant specific submittals are planned for early 2007 to support fuel load in Spring 2008
- BNFL Slide 21 OWestinghouse