ML062770324

From kanterella
Jump to navigation Jump to search
Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
ML062770324
Person / Time
Site: Arkansas Nuclear, Waterford  Entergy icon.png
Issue date: 10/19/2006
From: Karoutas Z, Miller D, Rodack T
Entergy Corp, Westinghouse
To:
Office of Nuclear Reactor Regulation
References
AW-06-2203, LTR-NRC-06-55
Download: ML062770324 (7)


Text

Westinghouse Non-Proprietary Class 3 Draft Slide Presentation for the NRC/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)

Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355

© 2006 Westinghouse Electric Company LLC All Rights Reserved

Westinghouse Non-Proprietary Class 3 DRAFT Implementation of Improved Fuel Design for CE 16x NSSS Presentation to NRC October 19, 2006 White Flint, Rockville, MD Tom Rodack &Zeses Karoutas (Westinghouse) and Dana Millar (Entergy)

  • BNFL Slide 1 GWestinghouse

DRAFT

-Agenda

" Meeting Objectives

" Background

  • Fuel Design
  • Topical Reports Supporting Design Implementation
  • Implementation Plan
  • Topical Report Status
  • Summary Slide 2
  • BNFL GWestinghouse

DRAFT Meeting Objectives

  • Explain why Next Generation Fuel will be deployed for CE 16 NSSS
  • Present overall licensing plan

" Provide an opportunity for NRC feedback Slide 3

  • DBNFL OWestinghouse

DRAFT

Background

  • Westinghouse fully supports INPO initiative to drive to zero fuel leakers by 2010

- Zero Leaking Fuel a strategic objective since 2004

  • Grid-to-rod fretting is the primary PWR leaker mechanism

- Fretting leakers typically occur in thrice burned fuel

[ ]a,c

. [ I a,c

- Improvements being discussed or implemented on designs for all fuel currently supplied Slide 4 Slide 4 ~OWesfingtiouse

  • DBNFL

DRAFT Fuel Performance Overview by Product a, c Slide 5

  • 'BNFL ld5Westinghouse

DRAFT

Background

  • CE 16 Next Generation Fuel is key to promoting zero leakers in CE NSSS

- Significant increase in grid-to-rod fretting margin

" CE NGF features same type of spacer grid as 14x TURBO fuel that has demonstrated improved grid-to-rod fretting performance

- Increases other design and operating margins

° CE 16 NGF LTAs in 1st cycle at Waterford

- Scheduled for exam in December 0 Region deployment planned for Spring 2008 in ANO-2 and Waterford

  • BNFL Slide 6 OWestinghouse

DRAFT Implementation of Improved Designs for CE NSSS a, c

~Westinghouse Slide 77

  • BNFL OWestinghouse

DRAFT CE 16 NGF Fuel Design Zeses Karoutas

  • BNFL Slide 8 S 8Westinghouse

DRAFT CE 16x NGF Fuel Design a, c

  • )BNFL Slide 9 OWestinghouse

DRAFT General Program Status a, c

~Westinghouse 10 Slide 10

  • DBNFL OWeslinghouse

DRAFT Topical Reports Supporting CE 16 NGF Implementation Zeses Karoutas

  • DBNFL Slide 11 OWestinghouse

DRAFT Core Reference Report (WCAP-1 6500-P) 0 Submitted February 28,2006 a, c

  • )BNFL Slide 12 OWestinghouse

DRAFT Critical Heat Flux Correlation Report (WCAP-1 6523-P)

° Submitted March 20, 2006

  • New DNB correlation form similar to ABB-NV &ABB-TV correlations approved in Topical CENPD-387-P-A a, c Westinghouse
  • DBNFL Slide 13 Slide 13 ice Westinghouse

DRAFT LOCA Model Grid Heat Transfer (CENPD-1 32-P-A, Sup. 4-P, Add. I -P)

° Submitted

- As Appendix to Core Reference Report February 28, 2006

- Re-submitted separately at NRC's request May 11, 2006 a, c 2

  • BNFL Slide 14 OWestingtiouse

DRAFT Optimized ZIRLOTM Report (CENPD-404-P-A Add. I-A)

Provides the basis for use of Optimized ZIRLO T cladding in fuel for CE and W NSSS M

Approved June 10, 2005 a, c Slide 15

  • )BNFL 1Westinghouse

DRAFT NGF Implementation Plan for ANO-2 and Waterford Dana Millar Slide 16

  • OBNFL eWestinghouse

DRAFT Implementation Plan Summary

  • License Amendment Requests (LARs) planned to be submitted for both ANO-2 and Waterford Requests for Exemption from 10 CFR 50.46 and Appendix Kto be submitted because of Optimized ZIRLOTM cladding PLACEHOLDER TO PROVIDE, OVERVIEW OF CONTENT SLIDE WILL BE REVISED
  • BNFL Slide 17 (Westinghbuse

DRAFT Topical Report Status and Summary Tom Rodack Slide 18

  • BNFL S 1Westinghouse

DRAFT Licensing Scope

" License Amendment requests for implementation of NGF in ANO-2 and Waterford will reference:

- Core Reference Report (WCAP-1 6500-P)

- Critical Heat Flux Correlation Report (WCAP-1 6523-P)

- Improved LOCA Model (CENPD-i 32-P-A, Sup. 4-P, Add. I-P)

  • Request for Exemption from 10 CRF 50.46 and Appendix Kwill also be required for Optimized ZIRLOTh

- Optimized ZIRLOT Report (CENPD-404-P-A Add. 1-A)

  • BNFL Slide 19 eWesfing~house

DRAFT Licensing Status

-a, C 9 BNFL Slide 20 Se)Westinghouse

DRAFT Summary

" Deployment of CE 16 NGF design is key to reducing fuel leakers

" Topical reports supporting the design are under review and receiving attention

" Plant specific submittals are planned for early 2007 to support fuel load in Spring 2008

  • BNFL Slide 21 OWestinghouse