Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20037D627 + (Development and Evaluation of a Physical Protection Plan for 10 CFR 73.45 Capabilities (C),(D) and (F).Summary of Design Guidance Compendium and Safeguards Upgrade Rule Evaluation (Sure) Methodology Testing)
- ML20206E613 + (Development and Findings of the Performance Trending Methodology)
- L-PI-04-017, Development and Qualification of a GOTHIC Containment Evaluation Model for the Prairie Island Nuclear Generating Plants + (Development and Qualification of a GOTHIC Containment Evaluation Model for the Prairie Island Nuclear Generating Plants)
- ML23318A214 + (Development and Testing Coarse-Grained Models for Ultrasonic Simulations for Cast Austenitic Stainless Steel)
- ML19345D257 + (Development and Testing of a Model for Fire Potential in Nuclear Power Plants)
- ML20246C249 + (Development and Use of RISKED-BASED Inspection Guides)
- ML20044G018 + (Development and Use of a TRAIN-LEVEL Probabilistic Risk Assessment)
- ML20235A183 + (Development and Validation of a REAL-TIME SAFT-UT System for the Inspection of Light Water Reactor Components.Annual Report,October 1984 - September 1985)
- ML20234D015 + (Development and Validation of a REAL-TIME SAFT-UT System for the Inspection of Light Water Reactor Components.Annual Report,October 1985 - September 1986)
- ML20205P580 + (Development and Validation of a REAL-TIME SAFE-UT System for the Inspection of Light Water COMPONENTS.Semi-Annual Report for April 1984-September 1984)
- ML20154J315 + (Development and Verification of Conditions for Ductile Tearing Instability and Arrest)
- ML20008E190 + (Development and Verification of Fire Tests for Cable Systems and System Components.Quarterly Report 12,March-May 1980)
- ML19310A610 + (Development of Checklist for Evaluating Maint,Test & Calibr Procedures Used in Nuclear Power Plants)
- ML13098A431 + (Development of Chemical Effects Modules for Risk-Informed GSI-191 Resolution)
- ML17298B370 + (Development of Comprehensive Procedure Guideline for Core Damage Assessment,Task 467)
- ML080080613 + (Development of Conceptual Model as Basis for Characterization Plan Plum Brook Reactor Facility Perkins Township, Ohio)
- ML20141F390 + (Development of Conformal Respirator Monitoring Technology)
- ML20154H127 + (Development of Criteria for Matl Used in Engineered Components & Waste Forms at Near Surface LLW Facilities, Monthly Mgt Rept for Aug 1988.Encl in Central Files)
- ML20155K531 + (Development of Criteria for Matls Used in Engineered Components & Waste Forms at Near-Surface Low Level Waste Facilities, Monthly Mgt Rept for May 1988.Encl Proprietary Financial Status Withheld)
- ML20151Z776 + (Development of Criteria for Matls Used in Engineered Components & Waste Forms at Near Surface Low Level Waste Facilities, Monthly Mgt Rept for July 1988.Encl Financial Data Intended for Internal NRC Distribution Only)
- ML20236C668 + (Development of Criteria for Matls Used in Engineered Components & Waste Forms at Near-Surface Low Level Waste Facilities, Monthly Mgt Rept for Month of Feb 1989. Encl Financial Data Available in Central Files)
- ML20151B321 + (Development of Criteria for Matls Used in Engineered Components & Waste Forms at Near-Surface LLW Facilities, Monthly Mgt Rept for June 1988.Financial Status Withheld)
- ML19210C166 + (Development of Criteria for Seismic Review of Selected Nuclear Power Plants)
- ML19323B677 + (Development of Cryogenic Krypton-Separation Sys for Off-Gas of Reprocessing Plants, Presented at 15th DOE Nuclear Air Cleaning Conference)
- ML19340A519 + (Development of Environ Surveillance Stds for Nuclear Power Stations-Field Trip 1 to Dresden Nuclear Power Station)
- ML20101Q417 + (Development of Equipment Parameter Tolerances for the Ultrasonic Inspection of Steel Components.Application to Components Up to 3 Inches Thick)
- ML20248D112 + (Development of Equipment Seismic Fragilities for OCNGS Ipeee)
- ML12200A096 + (Development of Evacuation Time Estimates)
- HNP-16-106, Development of Evacuation Time Estimates + (Development of Evacuation Time Estimates)
- NG-12-0487, Development of Evacuation Time Estimates + (Development of Evacuation Time Estimates)
- RA-19-0390, Development of Evacuation Time Estimates + (Development of Evacuation Time Estimates)
- ML19296B134 + (Development of Evacuation Time Estimates)
- ML12363A166 + (Development of Evacuation Time Estimates, Appendix J - Appendix N)
- ML032510769 + (Development of Evacuation Time Estimates, Appendix L, ERPA Boundaries)
- ML12363A167 + (Development of Evacuation Time Estimates, Cover - Section 8)
- ML032510758 + (Development of Evacuation Time Estimates. Appendix F, Telephone Survey)
- ML032510772 + (Development of Evacuation Time Estimates. Appendix M, Acknowledgments)
- ML032510806 + (Development of Evacuation Time Estimates. Chapter 10, Evacuation Routes)
- ML032510812 + (Development of Evacuation Time Estimates. Chapter 12, Confirmation Time)
- ML032510774 + (Development of Evacuation Time Estimates. Chapter 2)
- ML032510775 + (Development of Evacuation Time Estimates. Chapter 3, Demand Estimation)
- ML032510608 + (Development of Evacuation Time Estimates. Cover)
- ML040780551 + (Development of Evacuation Time Estimates. Cover Sheet Through E-31)
- ML032510816 + (Development of Evacuation Time Estimates. Executive Summary)
- ML032510625 + (Development of Evacuation Time Estimates. Executive Summary)
- ML032510773 + (Development of Evacuation Time Estimates. Introduction)
- ML032510813 + (Development of Evacuation Time Estimates. Table of Contents)
- ML032510791 + (Development of Evacuation Time Estimates. Chapter 5, Estimation of Trip Generation Time)
- ML032510800 + (Development of Evacuation Time Estimates. Chapter 8, Transit-Dependent and Special Facility Evacuation Time Estimates)
- ML13003A138 + (Development of Evacuation Time Estimates, Appendix J, Representative Inputs to and Outputs from the Dynev II System Through Appendix K, Evacuation Roadway Network, Page K-49)
- ML12307A088 + (Development of Evacuation Time Estimates, Revision 2, Final Report, Chapter 7, General Population Evacuation Time Estimates Through Table E-5, Lodging Facilities within the EPZ)
- ML12307A087 + (Development of Evacuation Time Estimates, Revision 2, Final Report, Cover Through Table 6-4. Vehicle Estimates by Scenario)
- ML032510759 + (Development of Evacuation Time Estimates. Appendix G, Traffic Management Plan Schematics (Under Review: to Be Provided at Later Date))
- ML032510640 + (Development of Evacuation Time Estimates. Appendix a, Glossary of Traffic Engineering Terms)
- ML13003A132 + (Development of Evacuation Time Estimates, Appendix K, Evacuation Roadway Network, Page K-50 Through End)