Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "AR 00371248, Assign 02, in Progress Notes". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML13128A014  + (APS Response to NRC Request for Information Regarding Licensee Emergency Preparedness Phase 1 Staffing Requirements Associated with Near-Term Task Force (NTTF) Recommendation 9.3)
  • ML13126A077  + (APS Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
  • ML043580233  + (APS Response to NRC Safety Evaluation of the PVNGS Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation)
  • ML20090L944  + (APS Response to Request for Additional Information- Relief Request 65 Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge)
  • ML18129A448  + (APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components)
  • ML16155A084  + (APS Response to Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Lnstrumentation)
  • ML021640623  + (APS Response to Request for Comments on Information Provided During Technical Assessment of Generic Issue 186)
  • ML13326B021  + (APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51)
  • ML13325A098  + (APS Response to Second Request for Additional Information (RAI) Regarding Relief Request 51)
  • ML14065A039  + (APS Second 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051))
  • ML24275A233  + (APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure Band)
  • ML13252A110  + (APS Supplement to Seismic Walkdown Report Requested by NRC Pursuant to 10CFR 50.54(f) Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 Near-Term Task Force Review of Insight from Fukushima Dai-ichi Accident)
  • ML14126A636  + (APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force)
  • ML14022A054  + (APS Supplement to the Seismic Walkdown Report Requested by NRC Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident)
  • ML022600311  + (APS, Palo Verde Units 1, 2, and 3, Technical Specifications Bases Revision 18 Update)
  • ML090360516  + (APSs 60 Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E - U1R14)
  • ML050460219  + (APSs 60-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E, NRC Bulletin 2003-02, Commitment No. 3 and NRC Bulletin 2004-01, Commitment No. 2 - U3R11)
  • ML072690422  + (APSs 60-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E and Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U1R13)
  • ML021480003  + (APSs Response to Information Requested by NRC Bulletin 2001-01, Items 4a, 5a, & 5b, & NRC Bulletin 2002-01, Items 2.A & 2.B)
  • ML090200106  + (AR - 2009-01- Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Retake Examination Approval 05000313-09-301)
  • ML080250485  + (AR 00091771 Unexplained Differences Between Byron & Braidwood)
  • ML080250484  + (AR 00091771, Unexplained Differences Between Byron & Braidwood)
  • ML080290206  + (AR 00200745 - Feedwater Flow Tracer Test Preliminary Results)
  • ML060960596  + (AR 00328451 Report: Tritium Indicated in Samples Taken from Onsite Culvert)
  • ML060960641  + (AR 00371248 Report: NRC Questions on Previous Actions with Cw Blowdown Vacuum Breakers)
  • ML060960642  + (AR 00371248, Assign 02, in Progress Notes)