ENCLOSURE 1, APPENDICES A and B CONTAIN Security-Related Information -Withhold under 10 CFR 2.390 UPON SEPARATION THIS PAGE IS DECONTROLLED 10 CFR 50.54(f)
DWIGHT C. MIMS Senior Vice President, Nuclear ap Regulatory & Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-06818-DCM/MAM/PJH Mail Station 7605 Tel 623 393 5403 January 14, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
References:
- 1.
NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ADAMS Accession No. ML12056A046)
- 2.
NRC Letter, Endorsement Of Electric Power Research Institute (EPRI)
Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012
- 3. APS Letter 102-06624, Seismic Walkdown Report Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated November 27, 2012
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 APS Supplement to the Seismic Walkdown Report Requested by the NRC Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) issued Reference 1 to Arizona Public Service (APS). Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Seismic Recommendation 2.3.
For Seismic Recommendation 2.3, Enclosure 3 of Reference 1 states that within 180 days of NRC endorsement of the walkdown guidance (Reference 2), each addressee will submit its final response for the requested information, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the walkdown will be completed.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway-Comanche Peak.Diablo Canyon.Palo Verde.San OnofreSouth Texas.Wolf Creek
ENCLOSURE 1, APPENDICES A and B CONTAIN Security-Related Information -Withhold under 10 CFR 2.390 UPON SEPARATION THIS PAGE IS DECONTROLLED ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Supplement to the Unit 1 Seismic Walkdown Report Page 2 On November 27, 2012, APS provided the PVNGS Unit 1 Seismic Walkdown Report (Reference 3) in response to the request of Reference 1 for Seismic Recommendation 2.3. In that submittal, APS noted that some components were inaccessible for inspection during the initial seismic walkdown and other components required additional inspection.
As a result, APS committed to provide a supplement to the PVNGS Unit 1 Seismic Walkdown Report that contains the supplemental seismic walkdown and seismic licensing basis evaluation results. The supplemental seismic walkdowns include both seismic walkdowns of equipment and area walk-bys.
The enclosure to this letter provides the results for the supplemental seismic walkdowns of inaccessible components and components related to seismic frequently asked question 4.20 which addressed interior inspections of electrical cabinets.
In addition, the enclosure provides the results of seismic licensing basis evaluations related to the supplemental seismic walkdowns. This submittal completes the Seismic Walkdown Report for PVNGS Unit 1.
Appendices A and B of the enclosure contain security-related information. Therefore, APS is requesting that those appendices be withheld from public disclosure.
No commitments are being made to the NRC by this letter.
Should you have any questions concerning the content of this letter, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
______//
(Date)
Sincerely,
Enclosure:
Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 1 - Supplemental Information DCM/MAM/PJH/
cc:
E. J. Leeds NRC Director Office of Nuclear Reactor Regulation M. L. Dapas NRC Region IV Regional Administrator J. K. Rankin NRC NRR Project Manager A. E. George NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS L. M. Regner NRC NRR/JLD/JPMB Project Manager ENCLOSURE 1, APPENDICES A and B CONTAIN Security-Related Information - Withhold under 10 CFR 2.390 UPON SEPARATION THIS PAGE IS DECONTROLLED
ENCLOSURE 1, APPENDICES A and B CONTAIN Security-Related Information -Withhold under 10 CFR 2.390 UPON SEPARATION THIS PAGE IS DECONTROLLED ENCLOSURE Near-Term Task Force Recommendation 2.3 Seismic Walkdown Submittal Report for Palo Verde Nuclear Generating Station Unit 1 - Supplemental Information ENCLOSURE 1, APPENDICES A and B CONTAIN Security-Related Information - Withhold under 10 CFR 2.390 UPON SEPARATION THIS PAGE IS DECONTROLLED