ML100740250
| ML100740250 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/12/2009 |
| From: | - No Known Affiliation |
| To: | NRC Region 1 |
| References | |
| FOIA/PA-2009-0214 AR 00918721 | |
| Download: ML100740250 (2) | |
Text
AR - Assignment Report Page 1 of 2 O Go Back Print I New Search Home AR 00918721 Report Aff Fac:
Oyster Creek AR Type:
CR Status:
APPROVED Aft Unit:
NA Owed To:
A5332CAP Due Date:
07/02/2009 Aft System:
Event Date:
05/11/2009 CR Level/Class: 4/B Disc Date:
05/11/2009 How H02 Orig Date:
05/12/2009 Discovered:
WR/PIMS AR:
Component #:
Action Request Details
Subject:
ANOMALOUS SAMPLE RESULTS FOR A ISOLATION CONDENSERS 05/07/09
==
Description:==
Originator: LEANNE K BIRKMIRE Supv Contacted: Jhansi Kandasamy, Chemistry Condition
Description:
The sample results from the'A Isolation Condensers on 05/07/09 seem anomalous. These are not inline with other samples as per the table below.
A 4/30/2009 18:50 3.47E-06 A.5/7/2009 13:40 < 1.98E-06 A 5/9/2009 10:10 3.76E-06 A 5/10/2009 3:35 4.17E-06 A 5/10/2009 5:55 3.41E-06 A 5/10/2009 18:05 2.40E-06 B 4/30/2009 18:55 < 1.98E-06 B 5/7/2009 13:45 3.98E-06 B 5/9/2009 10:15 < 1.98E-06 B 5/10/2009 3:40 3.15E-06 B 5/10/2009 6:00 < 1.98E-06 B 5/10/2009 18:10 < 1.98E-06 Immediate actions taken:
Resampled to verify data.
Recommended Actions:
Per Management perform a QHPI.
Operable Basis:
N/A Reportable Basis:
N/A Reviewed by: GARY G FLESHER 05/12/2009 14:53:06 CDT Reviewer Comments:
none SOC Reviewed by: LYNDA FILEPPI 05/14/2009 12:09:43 CDT SOC Comments:
05/13/09 LF - Class B due to QHPI. Close to QHPI.
http://eamgenco.ceco.com/cap/servletReportARServlet
-'6/23/2009
AR - Assignment Report Page 2 of 2 0 N-O
, I.....
Trend Codes TC1 TC2 TC3 Proc Org Rank HPW7 FDM LOW02 CY CH P
HPH3 FDM LOW02 CY CH Assignments Assign #:
01 Assigned To:
Status:
COMPLETE Aft Fac:
Oyster Creek Prim Grp:
ACAPALL Due Date:
05/17/2009 Assign Type:
TRKG Sec Grp:
Orig Due Date:
pJ/pp/p/Ippp Priority:
Schedule Ref:
Unit Condition:
Subject/Description:
ANOMALOUS SAMPLE RESULTS FOR A ISOLATION CONDENSERS 05/07/09 Assign#:
02 Assigned To:
U00OP03 Status:
COMPLETE Aft Fac:
Oyster Creek Prim Grp:
A5332CHEM Due Date:
06/10/2009 Assign Type:
QHPI Sec Grp:
Orig Due Date:
05/19/2009 Priority:
Schedule Ref:
Unit Condition:
Subject/Description:
Perform QHPI Assign #:
03 Assigned To:
U001JRK Status:
NTFY/ASG Aft Fac:
Oyster Creek Prim Grp:
A5332CHEM Due Date:
07/02/2009 Assign Type:
CA Sec Grp:
Orig Due Date:
07/02/2009 Priority:
Schedule Ref:
Unit Condition:
Reinforce to all station personnel the need to evaluate a trend in data rather than a single point, Subject/Description:
discuss at the Weekly Leadership Meeting.
Assign #:
04 Assigned To:
U00OPO3 Status:
COMPLETE Aff Fac:
Oyster Creek Prim Grp:
A5332CHEM Due Date:
06/10/2009 Assign Type:
MRC Sec Grp:
Orig Due Date:
06/03/2009 Priority:
Schedule Ref:
Unit Condition:
Subject/Description:
QHPI to MRC
/
,V http://eamgen'co.ceco.com/cap/servlet/ReportARServlet 6/23/2009