ML100740220
| ML100740220 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/12/2009 |
| From: | - No Known Affiliation |
| To: | NRC Region 1 |
| References | |
| FOIA/PA-2009-0214 AR 00918708 | |
| Download: ML100740220 (2) | |
Text
AR - Assignment Report Page I of 2 O Go Back Print I New Search Home AR 00918708 Report Aft Fac:
Oyster Creek AR Type:
CR Status:
APPROVED Aft Unit:
01 Owed To:
A5332CAP Due Date:
09/25/2009 Aft System:
211 Event Date:
05/10/2009 CR Level/Class: 4/D Disc Date:
05/10/2009 How H02 Orig Date:
05/12/2009 Discovered:
WR/PIMS AR:
Component #:
Action Request Details
Subject:
ISO COND RESULTS FOR TRITIUM NOT AS EXPECTED
==
Description:==
Originator: LEANNE K BIRKMIRE Supv Contacted: Jhansi Kandasamy, Chemistry Condition
Description:
On 05/10/09 Operations Bleed and Feed the A Isolation Condenser.
The results after the drain for tritium were:
5/10/2009 03:35 4.17E-06 The results after the filling for tritium were:
5/10/2009 05:55 3.41E-06 These results were expected to be < 1.98E-06.
Immediate actions taken:
Samples were taken again and the results for tritium were:
5/10/2009 18:05 2.40E-06 Recommended Actions:
Create a modification to recirculate the volume of water in the Isolation Condensers to ensure adequate mixing.
Operable Basis:
N/A Reportable Basis:
N/A Reviewed by: GARY G FLESHER 05/12/2009 14:53:06 CDT Reviewer Comments:
none SOC Reviewed by: THOMAS S LONSDALE 05/15/2009 09:51:58 CDT SOC Comments:
05/14/09 LF - Close to action created to take mod request through PHC process.
Trend Codes TC1 TC2 TC3 Proc Org Rank ECY101 CY90 CH P
http://eamgenco.ceco.com/cap/servlet/ReportARServlet6 6
AR - Assignment Report Page 2 of 2 Assignments Assign #:
01 Assigned To:
Status:
COMPLETE Aft Fac:
Oyster Creek Prim Grp:
ACAPALL Due Date:
05/17/2009 Assign Type:
TRKG Sec Grp:'
Orig Due Date:
pp/pp/lpppp Priority:
Schedule Ref:
Unit Condition:
Subject/Description:
ISO COND RESULTS FOR TRITIUM NOT AS EXPECTED Assign #:
02 Assigned To:
U777RJA Status:
NTFY/ASG Aft Fac:
Oyster Creek Prim Grp:
A5332CHEM Due Date:
09/25/2009 Assign Type:
ACIT Sec Grp:
Orig Due Date:
09/25/2009 Priority:
Schedule Ref:
Unit Condition:
Present the following to PHC Subcommittee/PHC - Create a modification to recirculate the Subject/Description:
volume of water in the Isolation Condensers to ensure adequate mixing.
http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/23/2009