APS Response to NRC Safety Evaluation of the PVNGS Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation
ML043580233
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/16/2004
From: Overbeck G
Arizona Public Service Co, Pinnacle West Capital Corp
To: John Nakoski
Office of Nuclear Reactor Regulation
References
102-05189-GRO/RAS, EA-03-086, TAC MC2950, TAC MC2951, TAC MC2952
Download: ML043580233 (2)


Text

A subsidiary of Pinnacle West Capital Corporation 10 CFR 50.34 Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Senior Vice President TEL (623) 393-5148 P.O. Box 52034 Generating Station Nuclear FAX (623) 393-6077 Phoenix, AZ 85072-2034 102-051 89-GROlRAS December 16, 2004 U. S. Nuclear Regulatory Commission ATTN: John Nakoski, Chief Section I, PDII,Section I Mail Stop 08G1 11555 Rockville Pike Rockville, MD 20852

References:

1) Order dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat ("Order EA-03-086" or "Order")
2) NRC letter dated 10/28/2004,

Subject:

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Administrative Change to Facility Operating License In Conjunction With The Commission Order EA-03-086 Regarding Revised Design Basis Threat; and Revisions To Physical Security Plan, Training and Qualification Plan, And Safeguards Contingency Plan (TAC nos. MC2950, MC2951, and MC2952)

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 License No. NPF-41; NPF-51; NPF-74 APS Response to NRC Safety Evaluation of the PVNGS Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

Dear Mr. Nokaski:

APS is providing this correspondence to notify the NRC of certain inconsistencies between the NRC safety evaluation and the PVNGS Revised Security Plan. As discussed with you on November 30, 2004, these items, while minor in nature, are in need of resolution to'ensure the PVNGS Revised Security Plan meets the requirements of the applicable Orders and that the NRC based their regulatory evaluation on accurate information. APS has identified the noted inconsistencies within the enclosure to this letter.

Enclosure Contains Safeguards Information When Separated From Enclosure This Page De-Controlled 4

U. S. Nuclear Regulatory Commission Respofise to the Safety Evaluation Report of the Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, SafeguardcContingency Plan, and Independent Spent Fuel Storage Installation Security Program.

Page 2 If you have questions regarding this correspondence, please contact Daniel G. Marks, Section Leader, Regulatory Affairs, at (623) 393-6492. Arizona Public Service Company makes no commitments in this letter.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Sincerely, GROIRAS/ras

Enclosure:

Inconsistencies between NRC safety evaluation and the PVNGS Revised Security Plan cc:

B. S. Mallett M. B. Fields N. L. Salgado NRC Region IV Regional Administrator NRC NRR Project Manager (without enclosures)