Text
- Al
- Assinninenl Keporlt H-t,,
I, racgc oL iu ro ct (1-gt/0 AR 00371248 Report Aft Fac:
Braidwood AR Type:
CR Status:
COMPLETE Aff Unit:
NA Owed To:
A8930CAP Due Date:
11/04/2005 Aft System:
CW Event Date:
09/08/2005 CR 5/D Disc Date:
09/08/2005 Level/Class:
How H03A Orig Date:
09/08/2005 Discovered:
WR/PIMS AR:
Equip Tag:
Action Request Details
Subject:
NRC QUESTIONS ON PREVIOUS ACTIONS WITH CW BLWDWN VAC BRKRS
==
Description:==
Originator: JOHN M KIJOWSKI Supv Contacted: Dave Gustafson Condition
Description:
During NRC debrief on 8/31/05, there was discussion regarding the CW blowdown vacuum breaker, OCW058, leakage that was identified in May 2005 (Reference IR 336401). A previous root cause was performed for vacuum breaker failures that occurred in 2000. The NRC question is: Subsequent to 0CW058 leakage identified in May 2005, were the root cause actions reviewed for adequacy? If so, what was the conclusion?
Immediate actions taken:
Write IR for Engineering follow up to answer the questions.
Recommended Actions:
Assign an action item (ACIT) to Engineering (A8930TT) to document the response to the questions and also that feedback was provided to the NRC.
Due Date: 10/07/05 What activities, processes, or procedures were involved?
NRC debrief Operable Basis:
Reportable Basis:
SOC Reviewed by: SCOTT D BUTLER 09/08/2005 11:15:24 CDT SOC Comments:
(9/8/05 SB) ATI created as requested.
Assignments Assign #:
01 Assigned To:
Status:
COMPLETE Aft Fac:
Braidwood Prim Grp:
ACAPALL Due Date:
09/13/2005 Assign Type:
TRKG Sec Grp:
Orig Due Date:
Priority:
httl://cccnivdO I.ccco.com:6 1 23/cap/servict/RcportARServlet I11/30/2005
AK - ASSignmnenlt KCeOnl C1agc zi o0 -iU Schedule Ref:
Unit Condition:
Subject/Description: NRC QUESTIONS ON PREVIOUS ACTIONS WITH CW BLWDWN VAC BRKR
'Assign #:
02 Assigned To:
VANOJX Status:
COMPLETE Aft Fac:
Braidwood Prim Grp:
A8930TT Due Date:
11/04/2005.
Assign Type:
ACIT Sec Grp:
Orig Due Date: 10/07/2005 Priority:
Schedule Ref:
Unit Condition:
Subject/Description: document the...response to the questions and also that fee http://cccnvd0 I.ccco.con:6 1 23/cap/servlcit/RepoortARServlct l11/30/2005