Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12067A129 + (4/5/2012 - Public Meeting to Discuss the 2011 End-of-Cycle Plant Performance Assessment of Perry Nuclear Power Plant)
- ML12102A212 + (4/5/2012 - Summary of Perry Public Meeting)
- ML12139A074 + (4/5/2012 Telecon Summary with Exelon Generation Company, LLC)
- ML18068A199 + (4/5/2018 Notice of Significant Public Meeting to Discuss NRCs End-of-Cycle Assessment of the Perry Nuclear Power Plant, Unit 1 Performance for the 2017 Calendar Year)
- ML21068A433 + (4/5/2021 - Docketing Letter to Petitioner PRM-37-2, Advance Tribal Notification of Certain Radioactive Material Shipments with Federal Register Notice)
- ML050880197 + (4/6/05 Columbia Generating Station - Revision to the Quality Assurance Topical Report, Operational Quality Assurance Program Description for Columbia Generating Station)
- ML16092A140 + (4/6/16, Meeting Slide for Pre-Submittal Meeting with NRC Regarding Oyster Creek Decommissioning Post-Shutdown Emergency Plan License Amendment Request)
- ML15091A517 + (4/6/2015, Meeting Slide for Public Teleconference on Point Beach MCR Abandonment Analysis for Loss of Control Scenarios)
- ML040980664 + (4/7/04 Callaway Plant - Request for Relief from ASME Code Requirements on the Use of Weld Overlay Reinforcement to Restore Wall Thickness of ASME Class 2 Carbon Steel Main Feedwater Piping)
- ML061000261 + (4/7/06 - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Pilgrim Nuclear Power Station)
- ML090920883 + (4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Firstenergy Operating Company)
- NRC-2009-0168, 4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Firstenergy Operating Company + (4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Firstenergy Operating Company)
- ML090921109 + (4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Detroit Edison Company)
- NRC-2009-0169, 4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Detroit Edison Company + (4/7/2009 Federal Register Notice - Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Detroit Edison Company)
- ML090921104 + (4/7/2009 Memo to M. T. Lesar Notice of Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Detroit Edison Company. Fermi Power Plant Independent Spent Fuel Installation, EA-09-072)
- ML21095A305 + (4/7/2021 Presubmittal Meeting Presentation - Comanche Peak, Units 1 and 2 - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3(l)(1) (L-2021-LRM-0039))
- ML22091A040 + (4/7/2022 ACRS Fc Meeting for GEH BWRX-300 Advanced Civil Construction and Design Approach LTR)
- ML051100210 + (4/8/05 - Maintenance of Reference Material at the South Haven Memorial Library at the Palisades Nuclear Plant, License Renewal Application)
- ML050560043 + (4/8/05, Braidwood Station, Unit 1 - Response to Nuclear Regulatory Commission Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity)
- ML13127A083 + (4/9/13 - Summary of Annual Assessment Meeting with Millstone Power Station)
- ML12101A027 + (4/9/2012 Summary of Telephone Conference Call Between NRC and STP Concerning Request for Additional Information Pertaining to STP License Renewal Application - Set 17)
- ML14098A335 + (4/9/2014 Meeting Slide for Gaia Lead Test Assembly Project)
- ML14108A210 + (4/9/2014 Summary of Pre-Submittal Meeting with Duke Energy Progress, Inc. on Proposed Technical Specification Amendment Request)
- ML18100B262 + (4/9/2018 Letter from S. Harrison Virginia Revised Final Regulations to Rats Id: 2015-3)
- ML18071A221 + (4/9/2018 Letter to S. Rodriguez New Mexico Final Regulations to Rats Id: 2015-4)
- ML20265C257 + (40 Inch Main Steam Piping Plan:From Containment to Turbine Stop Valves)
- ML20265C282 + (40 Inch Main Steam Piping Sections)
- ML20265C021 + (40 Inch Main Steam Piping Sections)
- ML20265C008 + (40 Inch Main Steam Piping Sections)
- ML20265C270 + (40 Inch O.D. Main Steam Piping Plan & Section:Area 2C5 & 2C6)
- PNP 2014-009, 40-Year Containment Tendon Surveillance Report + (40-Year Containment Tendon Surveillance Report)
- ML25042A678 + (40. Final CoC 1031 Amendment 11 Revision 1 TS Appendix B)
- ML23250A363 + (40. Final CoC 1031 Amendment 12 TS Appendix B)
- ML24211A278 + (40. Proposed CoC 1031 Amendment 11 Revision 1 TS Appendix a)
- ML22220A191 + (40. Proposed CoC 1031 Amendment 12 TS Appendix B)
- ML23068A425 + (40. Renewed Certificate of Compliance No. 1014, Amendment No. 10, Appendix B)
- ML20248J457 + (400 Block Main Street Grand Junction,Co.Sheet 1 of 1)
- ML20265F434 + (400 Block of Main Street Grand Junction Co.Sheet 1 of 1)
- ML15043A709 + (401-9 Addendum (Folder 2))
- ML23037A077 + (402 Cyber Notification and RFI Letter Final)
- ML22355A506 + (404 Cyber Notification and RFI Letter)
- ML092920331 + (405 OUO Supplemental 92005 IR--Cover Letter)
- ML20008F751 + (40CFR190 Compliance Assessment for NRC Licensed U Recovery Facilities as of 801201)
- ML20153E022 + (40CFR190 Compliance Summary Review,Umetco Uravan U Mill, 1984)
- ML19320D654 + (40CFR190 Related Radiological Doses Due to Operation of Uravan U Mill)
- ML042960215 + (40EP-9EO10, Rev. 32, Standard Appendices, Appendix 51, Electric Plant Single Line Diagram)
- TMI-14-061, 40th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs) + (40th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs))
- ML14189A284 + (40th Year Tendon Surveillance Engineering Report (Topical Report 213))
- ML18122A334 + (41-08165-18 608583 Tennessee Valley Authority (F/A))
- ML25042A679 + (41. Final CoC 1031 Amendment 12 Revision 1)
- ML23250A364 + (41. Final SER for CoC 1031 Amendment 12)
- ML22220A192 + (41. Preliminary SER for CoC 1031 Amendment 12)
- ML24211A279 + (41. Proposed CoC 1031 Amendment 11 Revision 1 TS Appendix B)