Exelon Generation,.
Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Middletown, PA 17057 Telephone 717-948-8000 ASME Code,Section XI 1 OCFR50.55a June 30, 2014 TMI-14-061 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Three Mile Island, Unit 1 (TMI Unit 1)
Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Three Mile Island Nuclear Station, Unit 1 4 0 th Year Tendon Surveillance Engineering Report (Topical Report 213)
Enclosed is "Topical Report 213, 4 0th Reactor Building Tendon Surveillance (Period 10)",
Revision 0, provides a report on the inspection results of the Post-Tensioning System and containment surface. These activities were performed in accordance with ASME Section XI, Subsection IWL, and Technical Specification 4.4.2. The report is required, by Technical Specification 4.4.2.1.6, to be submitted to the NRC within 3 months of completion.
No new regulatory commitments are established by this submittal. If any additional information is needed, please contact Mike Fitzwater at (717) 948-8228.
Sincerely, Mar Neomer Plant Manager, TMI-1 Exelon Generation Co., LLC MN/mdf - Topical Report 213 cc: USNRC, Regional Administrator, Region I USNRC, Senior Project Manager, NRR USNRC, Senior Resident Inspector Gary Gustofson, Hartford Steam Boiler I&l Co. of CT
_7ýb t5
Three Mile Island, Unit 1 -Topical Report 213 Topical Report 213, " 4 0 th Year Tendon Surveillance"