Letter Sequence Other |
---|
|
|
MONTHYEARML0508801972005-04-0606 April 2005 4/6/05 Columbia Generating Station - Revision to the Quality Assurance Topical Report, Operational Quality Assurance Program Description for Columbia Generating Station Project stage: Other ML0516603362005-06-13013 June 2005 Letter to J.V. Parrish Correction to Safety Evaluation for Revision to the Quality Assurance Topical Report, Operational Quality Assurance Program Description. Project stage: Approval 2005-04-06
[Table View] |
|
---|
Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink 2024-05-31
[Table view] |
Text
Mr. J. V. Parrish April 6, 2005 Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
REVISION TO THE QUALITY ASSURANCE TOPICAL REPORT, "OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION,"
FOR COLUMBIA GENERATING STATION (TAC NO. MC5814)
Dear Mr. Parrish:
By letter dated January 21, 2005, Energy Northwest submitted a change to the quality assurance program for the Columbia Generating Station in accordance with the provisions of 10 CFR 50.54(a)(4). Pursuant to 10 CFR 50.54(a)(4), the licensee identified a change that constitutes a reduction in commitment and, therefore, requires NRC approval prior to implementation. This change removes a commitment in the Operational Quality Assurance Program Description (QA Program).
Our review and bases for finding the proposed alternative to be acceptable are documented in the attached safety evaluation. The reduction in commitments continues to satisfy the standards and regulations, and is therefore, acceptable.
If you have any questions, feel free to call me at 301-415-3764.
Sincerely,
/RA by BKVaidya for/
Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Safety Evaluation cc w/encl: See next page
ML050880197 OFFICE PDIV-2/PM PDIV-2/LA DIPM/IPSB PDIV-2/SC NAME BVaidya for LFeizollahi DThatcher JDonohew for BBenney RGramm DATE 4/6/05 4/6/05 4/6/05 4/6/05 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED REVISION TO THE QUALITY ASSURANCE TOPICAL REPORT ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NUMBER 50-397
1.0 INTRODUCTION
By letter dated January 21, 2005, Energy Northwest (the licensee) submitted changes to the quality assurance (QA) program for the Columbia Generating Station, described in topical report, "Operational Quality Assurance Program Description" (QA topical). The licensee characterized the change as a reduction in commitment, subject to NRC staff approval prior to implementation, in accordance with 50.54(a)(4). The proposed change removes the plant manager from the position of Plant Operations Committee (POC) Chairman.
2.0 TECHNICAL INFORMATION IN THE SUBMITTAL The licensee's QA program description currently designates the plant manager as the POC Vice Chairman. Appendix III, Section 2.1.2 of the QA topical states, in part, "The manager responsible for plant operation ..., the POC chairman, shall appoint in writing, the POC Vice Chairman, and individual members." The licensee states that designating a qualified individual other than the plant manager as the POC Chairman would be more in line with the independent advisory role of the POC.
3.0 REGULATORY AND TECHNICAL EVALUATION Compliance with Appendix B to Title 10 of the Code of Federal Regulations (10 CFR) Part 50 requires an applicant to identify managerial and administrative controls to be used to ensure safe operation. The Standard Review Plan (SRP) NUREG-0800, Section 13.4, "Operational Review," provides the acceptance criteria used by the staff to evaluate the licensee's provisions for plant staff review of operational activities. The SRP stipulates that the licensee's provisions for plant staff review should meet the requirements described in Section 4.4 of the American National Standards Institute (ANSI) N18.7-1976 (ANS 3.2), as endorsed by Regulatory Guide (RG) 1.33, Revision 2.
Section 4.4 of the ANSI N18.7, states that the POC should provide, as part of the normal duties of plant supervisory personnel, timely and continuing monitoring of operating activities to assist the Plant Manager in keeping abreast of general plant conditions and to verify that the
day-to-day operating activities are conducted safely and in accordance with applicable administrative controls. Neither the ANSI N18.7 nor the RG 1.33 is specific as to the position or title of the onsite committee chairman for operational reviews.
Based on review of the proposed change to the QA topical for Columbia Generating Station, the staff concludes that the licensee's program for operational reviews is consistent with the guidance of ANSI N18.7 and applicable regulatory requirements.
4.0 CONCLUSION
The proposed change is acceptable, in that the QA program continues to satisfy the requirements of 10 CFR Part 50, Appendix B, applicable regulations and regulatory guidance.
Principal Contributor: P. Prescott Date: April 6, 2005
Columbia Generating Station cc:
Mr. W. Scott Oxenford (Mail Drop PE04) Mr. Dale K. Atkinson (Mail Drop PE08)
Vice President, Technical Services Vice President, Nuclear Generation Energy Northwest Energy Northwest P. O. Box 968 P.O. Box 968 Richland, WA 99352-0968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop PE01) Mr. William A. Horin, Esq.
Vice President, Corporate Services/ Winston & Strawn General Counsel/CFO 1400 L Street, N.W.
Energy Northwest Washington, DC 20005-3502 P.O. Box 968 Richland, WA 99352-0968 Mr. Matt Steuerwalt Executive Policy Division Chairman Office of the Governor Energy Facility Site Evaluation Council P.O. Box 43113 P.O. Box 43172 Olympia, WA 98504-3113 Olympia, WA 98504-3172 Ms. Lynn Albin Mr. Douglas W. Coleman (Mail Drop PE20) Washington State Department of Health Manager, Regulatory Programs P.O. Box 7827 Energy Northwest Olympia, WA 98504-7827 P.O. Box 968 Richland, WA 99352-0968 Technical Services Branch Chief FEMA Region X Mr. Gregory V. Cullen (Mail Drop PE20) 130 228th Street S.W.
Supervisor, Licensing Bothell, WA 98201-9796 Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069 March 2005