Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24243A015 + (– Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information)
- ML25093A339 + (– Notification of Comprehensive Engineering Team Inspection (05000498/2025011 and 05000499/2025011) and Request for Information)
- ML24318A943 + (– Notification of Conduct of Phase II Inspection of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactor)
- ML24225A168 + (– Notification of Inspection and Request)
- ML24345A179 + (– Notification of Inspection and Request for Information)
- ML24351A133 + (– Notification of Inspection and Request for Information)
- ML24108A063 + (– Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection)
- ML23212B268 + (– Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301)
- ML24017A080 + (– Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301)
- ML24073A120 + (– Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301)
- IR 05000261/2024301 + (– Notification of Licensed Operator Initial Examination 05000261/2024301)
- ML24072A294 + (– Notification of Licensed Operator Initial Examination 05000261/2024301)
- ML23135A713 + (– Notification of Licensed Operator Initial Examination 05000400/2024301)
- ML24127A159 + (– Notification of Licensed Operator Initial Examination 05000400/2024302)
- ML25006A048 + (– Notification of Licensed Operator Retake Examination 05000338/2025302 and 05000339/2025302)
- ML25150A239 + (– Notification of NRC Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations Issued in the Same Area Between September 2022 and December 2024 and Request for Information)
- ML24120A118 + (– Notification of NRC Supplemental Inspection (95001) and Request for Information)
- ML23235A055 + (– Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI))
- ML24157A335 + (– Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information)
- ML24136A138 + (– Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI))
- ML23163A039 + (– Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI))
- ML23296A016 + (– October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057))
- ML24220A109 + (– Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301)
- ML23074A340 + (– Operator Licensing Examination Approval 05000250/2023301 and 05000251/2023301)
- ML23212B265 + (– Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301)
- ML24085A790 + (– Preapplication Readiness Assessment of the License Termination Plan)
- L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations + (– Preparation and Scheduling of Operator Licensing Examinations)
- L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations + (– Preparation and Scheduling of Operator Licensing Examinations)
- ML22299A181 + (– Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081))
- ML25021A280 + (– Proposed Alternative RR-10 Regarding Letdown Line Isolation Train B Control Valve CV-31279)
- ML24166A062 + (– Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps)
- ML23265A132 + (– Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval)
- ML24222A182 + (– Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves)
- ML23248A209 + (– Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve)
- ML24079A006 + (– Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency)
- ML23233A004 + (– Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds)
- ML23206A038 + (– Proposed Alternative to the Requirements of the ASME Code)
- ML23041A426 + (– Proposed Alternative to the Requirements of the ASME OM Code)
- ML22311A003 + (– Proposed Alternative to the Requirements of the ASME OM Code)
- ML23297A026 + (– Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections)
- ML23191A153 + (– Public Meeting Presentation -- Proposed Rule: Regulatory Framework for Fusion Energy Systems)
- IR 05000338/2023011 + (– Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011)
- ML22285A073 + (– Receipt and Availability of the License Renewal Application, Enclosed Federal Register Notice)
- ML24022A173 + (– Receipt and Availability of the Subsequent License Renewal Application)
- ML23130A390 + (– Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner)
- ML23010A087 + (– Regulatory Audit Plan in Support of License Amendment Request to Revise Control Rod Technical Specifications)
- ML23209A602 + (– Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times)
- ML23264A001 + (– Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times)
- ML25077A233 + (– Regulatory Audit Plan in Support of the Review of the License Amendment Request to Increase Flexibility in Mode Restraints and the License Amendment Request for Shutdown Actions Mode Change Restrictions)
- ML23198A032 + (– Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times)
- ML24351A203 + (– Regulatory Audit Summary Concerning Relief Request No. 71: Resubmittal of Relief Request-30)
- ML24162A137 + (– Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040))