Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18096A174 +
- ML20085A952 +
- ML20085A950 +
- ML20085A706 +
- ML20082E789 +
- ML20082D465 +
- ML20082D460 +
- ML20079D680 +
- ML20077P641 +
- ML20076D929 +
- ML20076D821 +
- ML20076D485 +
- ML20076D489 +
- ML20076D456 +
- ML20076D412 +
- ML20076D263 +
- ML20076D242 +
- ML20076D214 +
- ML20076D211 +
- ML20076D208 +
- ML20076D154 +
- ML20076D072 +
- ML20076D034 +
- ML20076C813 +
- ML20076C795 +
- ML20134D497 +
- ML20266H173 +
- ML20266B305 +
- 0CAN079106, Advises That 10 Copies of Amend 9 to Updated SAR Shipped Under Separate Cover on 910722 +
- LIC-91-0196, Forwards 1991 SAR Update for Plant.W/O Encl +
- 0CAN079111, Informs That 13 Copies of Rev 13 to QA Manual Freighted to NRC on 910722 +
- BECO-91-094, Notifies That Final 2 Signals for SPDS Have Been Installed in Sys.Sampling Panel C-19 & Return Valves CV-5065-91 & 92 Completed on 910508 +
- 2CAN079107, Provides Info Re Unirradiated Upper Shelf Energy Value for Longitudinal Welds 2-203 A,B & C & 3-203 A,B & C,In Response to 910708 Telcon,Requesting Addl Info Concerning 910618 Proposed Change to Tech Specs for Pressure/Temp Limits +
- 0CAN079110, Forwards Rev 13 to QA Manual Operations +
- 05000277/LER-1991-022, :on 910627,manual Scram Occurred Due to Loss of Condenser Vacuum Following Isolation of Offgas Recombiner. Caused by Relief Valve Lifting Prematurely.Valve Replaced & Setpoint Verified to Be Correct +
- 05000285/LER-1991-012, :on 910620,emergency Diesel Generator Auto Start Occurred Due to Loss of Transformer.Caused by Personnel Error.Relays Labelled for Proper Identification +
- 05000382/LER-1991-012-01, :on 910621,EDG Declared Inoperable.Caused by Inadequate Attention to Detail.Control Room Supervisor Involved Debriefed on Event & Procedure Issued to Provide Addl Guidance on Tech Spec Compliance +
- 05000333/LER-1991-007-01, :on 910621,reactor Scram Occurred.Caused by False Low Reactor Water Level Signal During Calibration of Level Instrumentation.Root Cause Investigation in Progress +
- 05000361/LER-1991-008-01, :on 910622,toxic Gas Isolation Sys Actuation Occurred in Response to Apparent High Ammonia Signal Detected by Train a Analyzer.Caused by Erratic Rotation of Chopper Motor.Motor Replaced +
- 05000334/LER-1991-020, :on 910622,hydrogen Recombiner Declared Inoperable Due to Incorrect Thermocouple/Control Circuit Wiring.Design Change Package 1757 Implemented to Reverse Wiring of Thermocouples 3A & 4A +
- ML20035A899 +
- ML18096A171 +
- 05000251/LER-1990-014, :on 901107,crack Discovered in Coolant Water Flexible Hose Weld.Caused by Manufacturing Defect.New Flexible Cooling Water Hoses Successfully Retested During Remaining EDG Acceptance Tests +
- ML16341G199 +
- IR 05000261/1991010 +
- ML18096A173 +
- ML17058A860 +
- ML20076D623 +