Forwards Rev 22 to Procedure 8.7.3, Secondary Containment Leak Rate Test, Performed on 910505 & 0620
ML20076D485
Person / Time
Site: Pilgrim
Issue date: 07/22/1991
From: Richard Anderson
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20076D486 List:
References
91-93, NUDOCS 9107290187
Download: ML20076D485 (1)


Text

. _ _ - _ _ - _ _ _ _ _.

t t

O' BOSTON EOl50N Pdgrim Nuclear Pow Station Rocky Hdi noad Plymouth, Mass.achusetts 02300 July 22,1991 8Eco Ltr. 91-93 b.#d,N, i

si.,gomig U"."5. ku"5Ie,a,r Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Docket No. 50 293 License No. DPR-35

Subject:

Secondary containment Leak Rate Test Reports

Dear Sir:

A Secondary Containment Leak Rate Test was satisfactorily performed on May 5, 1991 prior to RF0 8 fuel offload. A second Secondary Containment Leak Rate Test was satisfactorily performed on June 20, 1991 prior to RF0 8 fuel reload.

Each test verified Secondary Containment integrity as defined by PNPS Technical Specification (TS) 4.7.C.1.

The attachments report th6 test results

.as required by T.S. 6.9 C.3, Table _6.9.1.a.

bhulaA-Q

_R A. Anderson WJH/bal-Attachments:

1. ! Secondary Containment Leak Rate Test 5/5/91 2.

Secondary Containment Leak Rate Test 6/20/91 cc:

Mr. Thomas T. Martin Regional Administrator, Region I r

U.S. Nuclear Regulatory Commission 475 Allendale Rd.

King of Prussia. PA 19406

.Hr. R; 8. Eaton Division of Reactor Projects I/II-Office of NRR --USNRC One White' Flint North - Hall Stop 1401 11555 Rockville Pike Rockville, MD 20852 Sr.- NRC Resident Inspector - Pilgrim _ Station l