Text
. _ _ - _ _ - _ _ _ _ _.
t t
- O' BOSTON EOl50N Pdgrim Nuclear Pow Station Rocky Hdi noad Plymouth, Mass.achusetts 02300 July 22,1991 8Eco Ltr. 91-93 b.#d,N, i
si.,gomig U"."5. ku"5Ie,a,r Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Docket No. 50 293 License No. DPR-35
Subject:
Secondary containment Leak Rate Test Reports
Dear Sir:
A Secondary Containment Leak Rate Test was satisfactorily performed on May 5, 1991 prior to RF0 8 fuel offload. A second Secondary Containment Leak Rate Test was satisfactorily performed on June 20, 1991 prior to RF0 8 fuel reload.
Each test verified Secondary Containment integrity as defined by PNPS Technical Specification (TS) 4.7.C.1.
The attachments report th6 test results
.as required by T.S. 6.9 C.3, Table _6.9.1.a.
bhulaA-Q
_R A. Anderson WJH/bal-Attachments:
- 1. ! Secondary Containment Leak Rate Test 5/5/91 2.
Secondary Containment Leak Rate Test 6/20/91 cc:
Mr. Thomas T. Martin Regional Administrator, Region I r
U.S. Nuclear Regulatory Commission 475 Allendale Rd.
King of Prussia. PA 19406
.Hr. R; 8. Eaton Division of Reactor Projects I/II-Office of NRR --USNRC One White' Flint North - Hall Stop 1401 11555 Rockville Pike Rockville, MD 20852 Sr.- NRC Resident Inspector - Pilgrim _ Station l
Standard BECo LER Distribution I, [ (.
, r, b
b0 bbb 93 P
PDR: