Text
V g
e, v ev % < swa
$Nppingwt, PA B077 4U04 j
.Wo. O M Bt R W.e I%ewlent F4tx.*ar 6'oup
'd C ' O I I '
- July 22, 1991 U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Unqualified Fire Dampers (TAC No. 66319)
Ref: 1)
NRC Letter to DLC, dated June 29, 1990 2)
DLC Letter to NRC, dated December 19, 1989 3)
DLC Special Report, dated Septembar 15, 1989 As requested by NRC letter dated June 29,
- 1990, the below notification is provided regarding the implementation of the fire damper replacement work at BVPS Unit No.
1.
Replacement has been completed for all 17 fire dampers affected by the UL fire test results noted in Reference (3).
During the 8th refueling outage at Unit 1, replacement dampers were installed.
Upon completion of installation, each of the dampers was operationally tested.
Based on satisfactory testing results, the fire dampers were declared
- operable, and the compensatory measures in the form of fire watch patrols for the affected areas were terminated.
This completes our corrective actions for the Unit 1
fire dampers.
Should there be any questions regarding this matter, please contact John Maracek at (412) 393-5232.
Sincerely,
./
J.
D.
Sieber Vice President Nuclear Group cc:
Mr.
J.
Beall, Sr. Resident Inspector Mr.
T.
T.
Martin, NRC Region I Administrator Mr.
A.
W.
DeAgazio, Project Manager Mr. M.
L.
Bowling (VEPCO) llO b 9107290109 910722 em noca Osmo m F
PDR I
.O r