Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17333A540 +
- 05000272/LER-1996-014-02, :on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Caused by Cracked Roll Pin,Due to Lack of Knowledge of Plating Induced Hydrogen Embrittlement.Cause Evaluation Being Conducted +
- ML18065A872 +
- ML20117K417 +
- ML20117F118 +
- ML20117E759 +
- ML20117B523 +
- ML20117B283 +
- ML20117A314 +
- ML20116P343 +
- ML20116P277 +
- ML20116N550 +
- ML20116N319 +
- ML20116N312 +
- ML20116N272 +
- ML20116M735 +
- ML20116M541 +
- ML20116M534 +
- ML20116M103 +
- ML20140H156 +
- ML20140E557 +
- ML20134E308 +
- ML20134B327 +
- ML20129G191 +
- ML20129E799 +
- ML20128J130 +
- ML20211K161 +
- ML20211K135 +
- ML20197J613 +
- CY-96-093, FOIA Request for Documents Re Most Recent Plant Issues List for Plant,As Described in SECY-96-093 +
- PY-CEI-NRR-2084, Forwards semi-annual fitness-for-duty Rept Jan-June 1996 +
- ML20265D838 +
- ML20129F334 +
- ML20133F248 +
- 05000321/LER-1996-011, :on 960719,periodic Valve Position Check Required by Unit TS SR Had Not Been Performed.Caused by Inadequate Procedures.Procedures Revised to Include Periodic Position Check +
- ML20117B446 +
- ML20128M706 +
- ML20116P145 +
- ML20117B452 +
- ML20128Q341 +
- ML18153A044 +
- IR 05000280/1996020 +
- ML18153A046 +
- 05000272/LER-1996-014, Corrected LER 96-014-00:on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Root Cause Investigation Being Conducted.All NLI Refurbished Breakers Removed Except 2B4D from Vital Loads +
- 05000255/LER-1996-010, :on 960717,high Pressure Safety Injection Pump Tripped While Filling Safety Injection Tank.Caused by Faulty 150/151Y-207 Time Overcurrent Relay.All Similar Relays in Time Overcurrent Application Have Been Inspected +
- 05000296/LER-1996-004-03, :on 960717,ECCS Division I Instrumentation Rendered ECCS Equipment Inoperable.Caused by Loss of Inverter Output.Cleared Fuse,Shorted SCR & Failed Inverter Control Board Was Replaced in ECCS Division I Atu Inverter +
- 05000296/LER-1950-296, Forwards LER 50-296/96-004 Which Provides Details Re Loss of Instrumentation Input Logic for Plants Division I Eccs. Broader Evaluation of Inverter Problems Being Conducted Due to Aggregate of Events +
- IR 05000250/1996008 +
- IR 05000275/1996017 +
- ML16342D416 +