Text
-
SA:E3.ARDS N':RMA":~N IUA Tennessee Valley Authonty, Post Office Box 2000, Soddy-Dasy, Tennessee 37379 2000 SAMARDS NTION CUWBSIFICATION DOES NOT AfFt.Y TO THIS PAGE WHEN SEAARATED FPON ATTACHMENT August 10.1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SON) - PHYSICAL SECURITY / CONTINGENCY PLAN (PSP /CP), REVISION 3, DATED JULY 3,1996 Enclosed is the subject item along with instructions for updating NRC Copies 6 through 11. This revision to the SON PSP /CP is being submitted pursuant to 10 CFR 50.54(p). This revision is necessary to address changes as a result of the completion of the physical security upgrade project (PSUP). Specifically, the secondary alarm station power supply was completed as designed, and Appendix C for the PSUP was deleted.
The material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material should not be placed in the Public Document Room.
The information is being sent by certified mail, and the signed receipt will signify that you have received this information and acknowledge that it contains safeguards material to be protected in accordance with 10 CFR 73.21.
9608270085 960816 PDR ADOCK 05000327 F
PDR c
w ai d i V U J.'
SUEG.ARDS N':RMA":N r
SA:E3.AR:S N::RMK':N U.S. Nuclear Regulatory Commission ugust 16,1996 DCes e m g
110 4 SE89A7tED FRON ATTActiimver if you have any questions concerning this issue, please telephone S. D. Gilley at (423)843-7427.
j Sincerely, Y
R. H. Shell Manager SON Site Licensing
Enclosures:
(Copies 6-9) cc: Mr. R. W. Hernan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Dairy, Tennessee 37379-3624 U.S. Nuclear Regulatory Commission (Copies 10-11)
Region il P.O. Box 2257 Atlanta, Georgia 30301 SA:EG.ARDS N::'RMK':'N