Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17362A077 +
- Press Release-94-060, NRC Received from Advisory Committee on Nuclear Waste, Attached letter-type Report That Provides Comment on Recently Discovered Faulting at Yucca Mountain +
- ML17310B254 +
- ML17310B204 +
- ML17310B202 +
- ML17310B191 +
- ML17310B188 +
- ML18100B028 +
- ML18100B026 +
- ML18153A915 +
- ML20029C777 +
- ML20065M312 +
- ML20065L980 +
- ML20065L760 +
- ML20065L233 +
- ML20065L153 +
- ML20065K462 +
- ML20065K193 +
- ML20065K182 +
- ML20065K162 +
- ML20065K152 +
- ML20065J737 +
- ML20065J729 +
- ML20065J728 +
- ML20065J647 +
- ML20065H594 +
- ML20078K476 +
- ML20262E457 +
- ML20247B734 +
- ML20247B727 +
- ML20217D201 +
- ML20210M649 +
- ML20151L463 +
- ML20353A374 +
- NRC-94-4070, Forwards Nonproprietary & Proprietary Info on Test Conditions for AP600 Testing Performed at SPES-2 & Osu Test Facilities.Proprietary Info Withheld Per 10CFR2.790 +
- ST-HL-AE-4769, Submits Rev to Correspondence List to Replace Tm Puckett W/ CA Johnson +
- NRC-94-4096, Advises That 940407 Request for Addl Info on AP600 Contains No Proprietary Info +
- 3F0494-06, Responds to Violation Noted in Insp Rept 50-302/94-01. Corrective Actions:Procedural Changes Made to EPIP EM-205 +
- ML20265E660 +
- 05000302/LER-1994-001, :on 940315,performance of Procedure to Return Makeup Pump 1C to Operability Results in Entry Into LCO 3.0.3.Caused by Lack of self-checking.Personnel Trained & TS 3.5.2 Bases Evaluated for Clarification +
- 05000327/LER-1994-004, :on 940314,during Cold Shutdown an Inadvertent Fwi Occurred.Caused by Inadequate Procedure.Procedure Revised to Provide SG Level Guidance During Wet lay-up Conditions +
- 05000321/LER-1994-001-03, :on 940314,slight Movement in Cable Lug Connection Results in Unplanned Actuation of Esfs. Connection in Panel 1C71-P001 Tightened & External Connection Diagram Updated +
- 05000339/LER-1994-004-01, :on 940318,multiple Irpi Alarms Were Received. Caused by Intermittent Failure of Capacitor on Irpi.Control Rod Indication Adjustments Were Made & TS 3.0.3 Cleared.W/ +
- 05000412/LER-1994-004, :on 940315,inadvertent ESF Actuation Occurred During Solid State Slave Relay Testing.Caused by Inappropriate Operator Actuation Slave Relay Test Switch. Safety Train a Injection Signal Reset +
- ML20029D066 +
- ML20029E720 +
- NG-94-1377, Informs That Legal Firm Retained by Ies Util,Inc in Matters Related to DAEC Has Undergone Name Change to Newman, Bouknight & Edgar,P.C +
- ML20029C667 +
- ML19346G661 +
- ML20029C774 +