Text
r--
Conun:nw:Elth Edis n
) Brr.idwood Nuct:ar Pow:r Stition 1 Rout;ct, Box 84
/ Braceville, Illinois 60407
+
Telephone 815/458-2801 April 12, 1994 BW/94-0061 Mr. John B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351
Subject:
Braidwood Station Unit 2 Steam Generator Tube Inservice Inspection Report Docket No. STN 50-457
References:
(a) NUREG-1276, Technical Specifications, Braidwooo Station, Unit Nos. 1 and 2
Dear Mr. Martin:
Specification 4.4.5.5.b of reference (a) requires that the complete results of the steam generator tube inservice inspection shall be submitted to the Commission in a Special Report pursuant to Specification 6.9.2 of reference (a) within 12 months following the completion of the inspection.
The Braidwood Unit 2 steam generator eddy current inspection was completed April 13, 1993.
During this inspection, fifty percent of the tubing received a a
full length bobbin coil inspection with the remainder of the tubes being inspected through the U-Bend from the hot leg side.
Rotating Pancake Coil (RPC) was used to confirm and characterize all distorted indications found through the bobbin coil examinations.
4 The enclosure summarizes the inspection results.
Included are j
indication lists and maps, a guide to abbreviations used in the indication list, and a list of the certified personnel performing the eddy current examinations.
Please direct any questions regarding this submittal to Harry Pontious, Braidwood Licensing Supervisor, (815)458-2801 extension 2511.
Very truly yours,
/
)
Kf n
Station Manager Braidwood Station i
Enclosure cc:
NRC Document Control Desk S. G. DuPont, Senior Resident Inspector - Braidwood R.
R. Assa, Braidwood Project Manager - NRR B. Clayton, Branch Chief - RIII D. M.
Saccomando - NLA 0[p K. G.
Bartes, Regulatory Assurance Supervisor i
M.
F.
Sears, Site Engineering and Construction k
9404180410 940412 PDR ADOCK 05000457