Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1988-024, :on 880703,single Primary Containment Monitor Intermittently Exceeded 150 F Temp & Time Limit.Cause Contributed to Leaking Main Steamline Safety Relief Valves & Leaking Tailpipe Vacuum Breaker Valves + (11:00:41, 8 January 2025)
- 05000397/LER-1988-034, :on 880909,pipe Failure Caused by Introduction of Liquid Nitrogen Into Primary Containment Supply Purge. Inerting Nitrogen Supply Valve & Containment Supply Purge Shut to Terminate Containment Inerting + (11:00:43, 8 January 2025)
- IR 05000397/1988037 + (11:00:50, 8 January 2025)
- GO2-88-274, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-24.Corrective Actions:Procedure PPM 1.5.4 Will Be Revised to Include Time Limits for Review & Corrective Action on All out-of-calibr Measuring & Test Equipment + (11:00:51, 8 January 2025)
- ML17285A147 + (11:00:51, 8 January 2025)
- GO2-88-262, Forwards Rev 1 to Insp of Anf Fuel Assemblies 1163 & 1164 After One-Cycle of Irradiation at Washington Nuclear Plant 2 Reactor. Insps Motivated in Part by Util Concerns Re Crud Induced Localized Corrosion.Rept Withheld (Ref 10CFR2.790) + (11:00:53, 8 January 2025)
- ML17285A142 + (11:00:54, 8 January 2025)
- GO2-88-264, Application for Amend to License NPF-21,modifying Tech Spec Table 3.3.7.12-1 Re Radioactive Gas Effluent Monitoring Instrumentation to Allow Operation of Main Condenser off-gas Treatment Sys W/O Redundant Hydrogen Monitor.Fee Paid + (11:00:55, 8 January 2025)
- IR 05000397/1988036 + (11:00:57, 8 January 2025)
- ML17285A135 + (11:00:57, 8 January 2025)
- GO2-88-257, Application for Amend to License NPF-21,revising Tech Spec Surveillance Requirement 4.8.1.1.2.e.7 So That Tech Specs Consistent W/Design of Automatic Bypass Function of Diesel Generator Trips.Fee Paid + (11:00:58, 8 January 2025)
- ML17285A128 + (11:00:59, 8 January 2025)
- IR 05000397/1987019 + (11:01:00, 8 January 2025)
- ML17285A124 + (11:01:02, 8 January 2025)
- ML17285A121 + (11:01:03, 8 January 2025)
- ML17285A118 + (11:01:04, 8 January 2025)
- GO2-88-261, Provides Description of Decision Process Used to Determine Channel Functional Test Boundaries for Second Level Undervoltage Protection Utilized at Facility + (11:01:05, 8 January 2025)
- IR 05000397/1988039 + (11:01:09, 8 January 2025)
- ML17285A110 + (11:01:11, 8 January 2025)
- GO2-88-256, Provides Status Rept Update on Tasks 6 & 8 Re Facility Fire Protection Reevaluation Rept.W/Exception of Remaining Actions Necessary to Complete Task 8 Subsequent to NRC Approval of Amend 37,improvement Initiatives Completed + (11:01:12, 8 January 2025)
- ML17285A109 + (11:01:12, 8 January 2025)
- GO2-88-250, Clarifies Min Staffing Needed for Safe Shutdown Re Insp Rept 50-397/88-16 Dtd 880725.Util Understands That Any Combination of Personnel Meeting 10CFR50,App R Requirements Acceptable + (11:01:13, 8 January 2025)
- ML17285A106 + (11:01:16, 8 January 2025)
- ML17285A105 + (11:01:17, 8 January 2025)
- ML17285A103 + (11:01:18, 8 January 2025)
- 05000397/LER-1988-035, :on 881101,determined That Control Rod Block Intermediate Range Monitor Quarterly Channel Calibr Surveillances Not Performed.Caused by Lack of Review of Testing Required for Changes in Conditions + (11:01:19, 8 January 2025)
- ML17285A096 + (11:01:20, 8 January 2025)
- ML17285A094 + (11:01:21, 8 January 2025)
- GO2-88-255, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-36.Corrective Action Taken:Posting Immediately Restored to Correct Position & Indepth Training on Testing to Verify Restoration of Radiation Area Posting Provided + (11:01:23, 8 January 2025)
- PNO-V-88-064, on 881130,unusual Event Declared & Reactor Shutdown Initiated Due to Determination That Leakage from Suppression Pool Vacuum Breaker Valve CSP-V9 in Excess of Tech Spec Limit.Valve Will Be Repaired + (11:01:23, 8 January 2025)
- GO2-88-239, Forwards Executive Summary for Impaired Function Testing of Limitorque Gearbox Relief Valves,Per Agreement During Exit Meeting Re Insp Rept 50-397/86-12 + (11:01:25, 8 January 2025)
- IR 05000397/1988033 + (11:01:26, 8 January 2025)
- TAC:71128 + (11:01:27, 8 January 2025)
- ML17285A089 + (11:01:28, 8 January 2025)
- GO2-88-218, Advises That All Facility Comments Resolved During 881004 post-exam Review W/T Meadows.No Formal Comments Will Be Submitted + (11:01:29, 8 January 2025)
- ML17285A087 + (11:01:30, 8 January 2025)
- ML17285A083 + (11:01:31, 8 January 2025)
- GO2-88-249, Responds to NRC Re Violations & Deviations Noted in Insp Rept 50-397/88-32.Corrective Actions:Missing Lock Washers Replaced & All Hydraulic Control Unit hold-down Bolts Torqued Checked + (11:01:32, 8 January 2025)
- GO2-88-244, Requests Discretionary Enforcement Re Tech Spec 3/4.3.3 Re ECCS Actuation Instrumentation & Applicability Spec 3.0.3 for 24 H Period Beginning 881121 + (11:01:33, 8 January 2025)
- GO2-88-247, Submits Guarantee of Payment of Deferred Premium,Per 10CFR140.21 Requirements + (11:01:35, 8 January 2025)
- ML17285A078 + (11:01:37, 8 January 2025)
- PNO-V-88-063, on 881121,licensee Declared Unusual Event as Result of Entry Into Tech Spec 3.0.3 & Pending Reactor Shutdown.Action Occurred Due to Inoperable Relays.Relay Testing Completed & Unit Returned to Power + (11:01:38, 8 January 2025)
- ML17285A076 + (11:01:39, 8 January 2025)
- ML17285A075 + (11:01:40, 8 January 2025)
- ML17285A057 + (11:01:41, 8 January 2025)
- RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules + (11:01:42, 8 January 2025)
- 05000416/LER-1917-006, Regarding Completion of Grand Gulf Nuclear Station Shutdown Required by Technical Specifications Because of an Inoperable a Residual Heat Removal Pump + (11:01:46, 8 January 2025)
- CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement + (11:01:47, 8 January 2025)
- ONS-2017-070, Emergency Plan Implementing Procedures, Volume 2, Revision 2017-002 + (11:01:48, 8 January 2025)
- ML17285A032 + (11:01:48, 8 January 2025)
- ML17285A030 + (11:01:49, 8 January 2025)