ML17285A128

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1988 for Washington Nuclear Plant-2.W/881208 Ltr
ML17285A128
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8812200086
Download: ML17285A128 (9)


Text

AC CELE RATED DIST3UTJ ON DE M ON STRAN SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR: 8812200086 DOC. DATE: 88/11/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILXATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION.

SUBJECT:

Monthly operating rept for Nov 1988 for WNP-2.W/881208 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) D NOTES: 8 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME .LTTR 'ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH,R 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 . 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRR DREP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 REG F , 01 1 1 RGN5 1 1 EXTERNAL EG&G S IMPSON I F 1 1 EG&G,WILLIAMS,S 1 1 LPDR 1 1 NRC PDR- 1 " 1 NSIC 1 1 R

I S

h NVZE K) ALL "RIDS" RECIPIENIS:

PIZASE HELP US K) REDUCE WASTE COPlACZ IHE DOCUMENT CORBEL DESK I ROCN Pl-37 (EXT. 20079) KO EIZMXNATE RXlR NAME FMM DXSXVKBUTION IZSTS FOR DtXKMWIS YOU DOINIT NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 30

DOCKET NO. 50-397 UNIT NAME DATE >2 ] 88 WIT S) IUTDONNS / REDUCTIONS COMPLETED BY LB HUTCHISON REPCAT. PERIOD NOV -

1988 TELEPHONE (509)377-2486 men th, year RM D~K TTPF Ml0 JBb REASK hlE1R00 iZC7E ~Y'llllTEET c C IO PRFVE T REC RR NC NONE 88 12200086 8S1 1 SQ PDR ADOCK 05000397 R PDC WNP-2 OPERATED ROUTINELY IN NOVEMBER WITH NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS.

TYPE SYSTEM & COMPOhCNT F-Forced A-Equip Failure F-Admin l-Manual Exhibit F & H S- cl ed 0-Maint or Tes t ~ G-Oper Error 2-Manual Scram Instructions for C-Re f'ue ling H-Other 3-Auto Scram Preparation of D-Regulatory Res triction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

0 0 /

k

OPERATING DATA REPORT WNP-2 01-Dec-88

1. DOCKET: 50-397
2. REPORTING PERIOD: Nav-88 OUTAGE + ON-LINE HOURS 720 3 UTILITY CONTACT LEONARD HUTCHISON (509) 377-2486 4 LICENSED THERMAL POWER (MWt)c 3323 5 NAMEPLATE RATING (GROSS MWe)a 1200 9
b. DESIGN ELECTRICAL RATING (NET MWe) a 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM,DEPENDABLE CAPACITY (NET, MWe): 109'5
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT~ GIVE REASONS'/A
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
11. REASONS FOR RESTRICTIONS~ IF ANY.

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 8040 34760.2 13 HOURS REACTOR CRITICAL 720.0 5743.5 25650 14 RX RESERVE SHTDWN HRS 0.0 0.0 340.4 15 ~ HRS GENERATOR ON LINE 720.0 5487 6 24629 5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 17 GROSS THERMAL ENERGY (MWH) 2361600 67496005 381.7'7113238
18. GROSS ELECTRICAL ENERGY (MWH) 794620 5678830 22495970
19. NET ELECTRICAL ENERGY (MWH) 768651 5482898 21650850
20. UNIT SERVICE FACTOR 100.0/ 68.3/ 70.9/

21.

22.

UNIT AVAILABILITYFACTOR UNIT CAPACITY FACTOR (MDC NET) 100.0/

97 '/ 68.3/

62.3/

72.0/

56.9/

23.

24 25.

UNIT CAPACITY FACTOR (DER NET)

'NIT FORCED OUTAGE RATE FORCED OUTAGE HOURS 97.1/

0 0.0

'/ 62 0/

13 2%

837 6 2482.7 56.6/

9.2/

26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEtDATEsDURATION)s REFUELING OUTAGE OF 45 DAYS DURATION TO START 4/14/88.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE

P I (RR)

PIC VV'~'PL~ l 3 Ii"

, J. j Vt44 R k( (R', "1 P(Illy, () 6 N Jt'l  ! <<R g RR 4 P~R. ),,( g )'W.I II 1 I ) 'Rl lit . I i',) g "3) Ri 14 <'4 'E"

'rrg q('

RJ 4<< )dY, .<.(s j;J) ~, 4 y 4 I 4

~ ( O'.R,il

',I 'I

'" 4(3R .

'3 $ C I~ra'"'1* 'Y" ~

Rf (Il r~ 'll( 4 R R(~R, ~

A (

4'( tRp f ~> 4 I Qrl )rg R, y R

~~ ~

0 R

<<&'"0 R" 'Rl,' 'j('t,"<,I 03(4I jjg, W JS f,', "M v'e'i 'i." .'I 8(' ZRf)'; R. 1' a e~'> "A. JR.ll (t.).3 R.

~

t

.' Jg- IIIR rl. A.VR

'4 lP'3",

~;4.t('ll

( I,'i $

, -'.lU Ql.((, 'ir

>>(

3, I'l

'4

<<r,( R<J ( >'R.>t 4"

'r',

p

,I 1

~

4('J ~ J'P Ir'4 4$ )

4

]f frR (P(",. 14RR" I = " 4 ('

f I)R4 rLR ~ ~((4,14'Q J,f g QI,R

~4 lI4$ t"iR. (. g~R, (R ~

qR 443,'> '" 'j t ] II4)] Il R,RP ,iA C (Rg '(

J f4( <

4 1 4 ()<< f. p )

4 4 ~

'I 4RR l ~ 45, N p

P 1 I

ref 4 <R '4 ( RI.I J

<<.V Q,,',4R')t) "

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT DATE 12 1 88 COMPLETED gy LB HUTGHISON TELEPHONE " 486 MONTH NOVEMBER DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 1 1? 1082 2 1045 1056 18 19 1075 1072 20 1074 1060 1056 21

,1074 1068 1084 1081 23 24 1082 1083 1056 10 26 1069 1079 1079 1080 12 1083 1082 13 29.

14 1082 1085 1085 31 INSTRUCTIONS Qn this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

these figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power!evel exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 December, 8; 1988 U.S. Nuclear, Regulatory Commission Document Control Desk Washington; D.C. 20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for. November, 1988 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours; C. M. Powers (M/D 927M)

WNP-2 Plant Manager.,

CMP/lc Enclosure cc: Mr. J. B. Martin NRC Region V Mr,-,. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI; Farmington CT Mr. J. T. Wheelock INPO Mr,. W.'.H. Lovelace NRC; Washington D.C.

4 S

~ a ~

h 1'