ML17285A128

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1988 for Washington Nuclear Plant-2
ML17285A128
Person / Time
Site: Columbia 
Issue date: 11/30/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8812200086
Download: ML17285A128 (9)


Text

AC CELE RATED DIST3UTJ ON DE MONSTRAN SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR: 8812200086 DOC. DATE: 88/11/30 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILXATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION.

DOCKET 05000397

SUBJECT:

Monthly operating rept for Nov 1988 for WNP-2.W/881208 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D 8

RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP/RPB 10 REG F

, 01 EXTERNAL EG&G S IMPSON I F LPDR NSIC COPIES

.LTTR 'ENCL 1

0 1

0 10 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EG&G,WILLIAMS,S NRC PDR-COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 R

I S

h NVZE K) ALL "RIDS" RECIPIENIS:

PIZASE HELP US K) REDUCE WASTE COPlACZ IHE DOCUMENT CORBEL DESKI ROCN Pl-37 (EXT. 20079)

KO EIZMXNATE RXlR NAME FMM DXSXVKBUTION IZSTS FOR DtXKMWIS YOU DOINIT NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30

REPCAT. PERIOD NOV 1988 men th, year RM D~K TTPF Ml0 JBb REASK hlE1R00 NONE WIT S) IUTDONNS / REDUCTIONS iZC7E

~Y'llllTEET c DOCKET NO.

50-397 UNIT NAME DATE

>2 ] 88 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 C IO PRFVE T REC RR NC 88 12200086 8S1 1 SQ PDR ADOCK 05000397 R

PDC WNP-2 OPERATED ROUTINELY IN NOVEMBER WITH NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS.

TYPE F-Forced S-cl ed A-Equip Failure 0-Maint or Tes t

~

C-Re f'ueling D-Regulatory Res triction E-Operator Training

& License Examination F-Admin G-Oper Error H-Other l-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM & COMPOhCNT Exhibit F & H Instructions for Preparation of Data Entry Sheet Licensee Event Report (LER) File (NUREG-0161)

0 0

/

k

OPERATING DATA REPORT WNP-2 01-Dec-88 1.

DOCKET: 50-397 2.

REPORTING PERIOD:

3 UTILITY CONTACT Nav-88 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4

LICENSED THERMAL POWER (MWt)c 5

NAMEPLATE RATING (GROSS MWe)a b.

DESIGN ELECTRICAL RATING (NET MWe) a 7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM,DEPENDABLE CAPACITY (NET, MWe):

9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONS'/A 3323 1200 9 1100 1140 109'5 10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

11.

REASONS FOR RESTRICTIONS~ IF ANY.

N/A 12.

REPORT PERIOD HOURS 13 HOURS REACTOR CRITICAL 14 RX RESERVE SHTDWN HRS 15 ~

HRS GENERATOR ON LINE 16.

UNIT RESERVE SHUTDOWN HOURS 17 GROSS THERMAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY (MWH) 19.

NET ELECTRICAL ENERGY (MWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET) 24'NIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS MONTH 720 720.0 0.0 720.0 0.0 2361600 794620 768651 100.0/

100.0/

97'/

97.1/

0'/

0.0 YEAR CUMULATIVE 8040 34760.2 5743.5 25650 0.0 340.4 5487 6 24629 5

0.0 381.7'7113238 67496005 5678830 22495970 5482898 21650850 68.3/

70.9/

68.3/

72.0/

62.3/

56.9/

62 0/

56.6/

13 2%

9.2/

837 6 2482.7 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEtDATEsDURATION)s REFUELING OUTAGE OF 45 DAYS DURATION TO START 4/14/88.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE

P I (RR)

PIC VV'~'PL~ l 3 Ii"

, J. j Vt44 R k(

(R',

"1 P(Illy,

()

6 N

RR 4 i',) g 4<<

)dY,

.<.(s j;J)

(

',I il

'I

~

O'.R, Jt'l

! <<R g

P~R. ),,(

g "3) Ri RJ 14

)'W.I II 1

I ) 'Rl lit.

I

<'4 'E"

~,

4 'rrg q('

y 4 I

4

'" 4(3R

. '3

$C I~ra'"'1* 'Y" ~

Rf (Il r~ 'll(

4 R

R(~R,

~

A

(

4'(

tRp f

~>

4 I

Qrl

)rg R, y R

~~

~

0 R <<&'"0 R"

'Rl,'

'j('t,"<,I 03(4Ijjg, W JS f,', "M v'e'i 'i."

.'I8('

ZRf)';

R. 1' a

e~'> "A. JR.ll (t.).3 R. t

~

Jg-IIIR rl.

p I'l 1

,I

~'4 (P(",. 14RR" I

=

4

('

f t"iR.

(. g~R,

~4 lI4$

R,RP 4

1 4

'I 4RR l

~

p

'4 A.VR I)R4 rLR

~

(R

~ qR

,iA C (Rg

()<< f.

4 4

~

45, N P

1 I

<<.V

~;4.t('ll Ql.((, 'ir -'.lU lP'3",

( I,'i

>>(

<<r,( R<J (

>'R.>t 4" 3,

'r',

4('J 4

~

J'P Ir'4 4$

)

]f frR

~((4,14'Q J,f g

QI,R 443,'>

'" 'j t ]

II4)]Il

'( J f4( <

p

)

ref 4

<R

'4

(

RI.I J

Q,,',4R')t) "

AVERAGEDAILYUNITPOWER LEVEL DOCKET NO.

UNIT DATE 12 1 88 COMPLETED gy LB HUTGHISON TELEPHONE

" 486 MONTH NOVEMBER 1045 18 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)

(MWe-Net) 1 1?

1082 2

1056 1072 1060

,1074 1084 1083 19 20 21 23 24 1075 1074 1056 1068 1081 1082 1056 10 12 13 14 1069 1079 1083 1082 1085 26 29.

31 1079 1080 1082 1085 INSTRUCTIONS Qn this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

these figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power!evel exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397

December, 8;

1988 U.S. Nuclear, Regulatory Commission Document Control Desk Washington; D.C. 20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for. November, 1988 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours; C.

M. Powers (M/D 927M)

WNP-2 Plant Manager.,

CMP/lc Enclosure cc: Mr.

Mr,-,.

Ms.

Mr.

Mr,.

J.

B. Martin C. J.

Bosted Dottie Sherman J. T. Wheelock W.'.H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI; Farmington CT INPO NRC; Washington D.C.

4 S

h

~

a

~

1'