Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1989-025, :on 890617 & 18,three Separate But Related Events Occurred Which Caused ESF Isolations & Actuations During Excess Flow Check Valve Testing.Caused by Inadequate Procedure.Procedure Modified + (10:55:29, 8 January 2025)
- IR 05000397/1989018 + (10:55:31, 8 January 2025)
- ML17285A623 + (10:55:32, 8 January 2025)
- 05000397/LER-1989-024, :on 890614,secondary Containment Bypass Leakage Found Greater than Allowed by Design Basis.Caused by Equipment Design Deficiency.Check Valves in Common Discharge Line of CRD Pump Installed to Prevent Leakage + (10:55:33, 8 January 2025)
- GO2-89-119, Responds to Concerns Noted in Insp Rept 50-397/89-01 Re Implementation of Root Cause Analysis (RCA) Program & RCA Rept Prepared for 890311 Rod Drift Event.Plans to Combine Elements of Process & Document Results in Incident Rept + (10:55:34, 8 January 2025)
- ML17285A620 + (10:55:34, 8 January 2025)
- GO2-89-118, Provides Justification for Continued Use of Five Installed Items Identified in Insp Rept 50-397/89-21,in Response to Bh Faulkenberry .Final Results & Assessment of Addl Commercial Grade Items Will Be Provided by 890815 + (10:55:36, 8 January 2025)
- IR 05000397/1989013 + (10:55:43, 8 January 2025)
- ML17285A613 + (10:55:45, 8 January 2025)
- ML17285A616 + (10:55:45, 8 January 2025)
- ML17285A612 + (10:55:47, 8 January 2025)
- ML17285A610 + (10:55:47, 8 January 2025)
- GO2-89-116, Advises That Final Response to Generic Ltr 88-14, Instrument Supply Sys Problems Affecting Safety-Related Equipment, Including Outage Test Results,Will Be Provided by 890728 + (10:55:48, 8 January 2025)
- ML17285A607 + (10:55:50, 8 January 2025)
- 05000397/LER-1989-020, :on 890527 & 0605,during Local Leak Rate Testing,Valve RHR-V-9 Automatically Isolated.Caused by Procedural Inadequacy & Inadequate Corrective Action Following Second Event.Procedure Modified + (10:55:51, 8 January 2025)
- 05000397/LER-1989-022, :on 890530,loss of Secondary Containment During Core Alterations Due to Unisolatable Lines Occurred.Caused by Simultaneous Activities.Rhr Heat Exchanger Isolation Valves Closed to Reestablish Integrity + (10:55:54, 8 January 2025)
- 05000397/LER-1989-023, :on 890531,ESF Isolations & Actuations Occurred Due to Loss of Reactor Protection Sys Bus During Testing. Caused by Personnel Error.Logic Sys Functional Test Procedure Revised.Test Engineer Counseled + (10:55:55, 8 January 2025)
- IR 05000397/1989021 + (10:56:00, 8 January 2025)
- ML17285A596 + (10:56:02, 8 January 2025)
- ML17285A597 + (10:56:02, 8 January 2025)
- GO2-89-114, Application for Amend to License NPF-21,modifying Tech Spec Tables 3.3.7.5-1 & 4.3.7.5-1 Re Accident Monitoring Instrumentation & Surveillance Requirements + (10:56:03, 8 January 2025)
- IR 05000397/1989014 + (10:56:06, 8 January 2025)
- ML17285A585 + (10:56:07, 8 January 2025)
- 05000397/LER-1989-021, :on 890527,electrical Protection Assembly Breaker Tripped Causing Loss of Power to Reactor Protection Sys Bus B.Cause Unknown.Upgraded Breaker Equipment Will Be Installed + (10:56:08, 8 January 2025)
- IR 05000397/1989011 + (10:56:12, 8 January 2025)
- ML17285A581 + (10:56:13, 8 January 2025)
- ML17285A580 + (10:56:14, 8 January 2025)
- ML17285A579 + (10:56:15, 8 January 2025)
- 05000397/LER-1989-005-01, :on 890311,of 185 Control rods,34 Drifted Inward from One to Seven Notches Due to Momentary Low Scram Air Header Pressure.Caused by Main Steam Radiation Monitor Design Deficiency + (10:56:16, 8 January 2025)
- GO2-89-110, Discusses Plant ATWS Mod Schedule.Two Issues Re Logic Relays & Topical Rept Need Clarification + (10:56:17, 8 January 2025)
- IR 05000397/1989015 + (10:56:19, 8 January 2025)
- ML17285A573 + (10:56:21, 8 January 2025)
- ML17285A572 + (10:56:21, 8 January 2025)
- ML17285A571 + (10:56:22, 8 January 2025)
- ML17285A570 + (10:56:23, 8 January 2025)
- ML17285A568 + (10:56:24, 8 January 2025)
- TAC:67620 + (10:56:24, 8 January 2025)
- 05000397/LER-1989-019, :on 890524,inboard RHR Shutdown Cooling Supply Valve Automatically Isolated When Electrician Lifted Wire Deenergizing Valve Control Relay.Personnel Counseled & Training in Plant Procedures Initiated + (10:56:25, 8 January 2025)
- 05000397/LER-1989-018, :on 890522,reactor Protection Sys (RPS) a motor-generator Set Failed Resulting in Loss of Power to RPS Bus A.Caused by Component Failure.Motor Replaced + (10:56:27, 8 January 2025)
- 05000397/LER-1989-017, :on 890520,outboard RHR Shutdown Cooling Valve Automatically Isolated,Causing Loss of Shutdown Cooling. Caused by Removal of Relay by Contractor Maint Electrician Installing Mod to Leak Detection Sys + (10:56:28, 8 January 2025)
- 05000397/LER-1989-005, :on 890311,34 of 185 Control Rods Drifted Inward from One to Seven Notches.Caused by Main Steam Line Radiation Monitor Design Deficiency.Desired Rod Pattern Reestablished + (10:56:30, 8 January 2025)
- GO2-89-109, Advises NRC That Requirement of Reg Guide 1.97,Rev 2 to Provide Qualified Wide Range Neutron Monitor Satisfied. Requests That Deferral Contained in Be Withdrawn + (10:56:31, 8 January 2025)
- ML17285A561 + (10:56:31, 8 January 2025)
- 05000397/LER-1989-016, :on 890514,reactor Operator Inadvertently Tripped Div 1 & 2 Offsite Power Supply Feeders Resulting in Loss of Power to Buses SM-7 & SM-4.Caused by Inadvertent Removal of Transformer Fuses.Fuses Reinserted + (10:56:33, 8 January 2025)
- ML17285A557 + (10:56:34, 8 January 2025)
- ML17285A556 + (10:56:35, 8 January 2025)
- ML17285A554 + (10:56:36, 8 January 2025)
- ML17285A553 + (10:56:37, 8 January 2025)
- ML17285A551 + (10:56:38, 8 January 2025)
- IR 05000133/2017003 + (10:56:41, 8 January 2025)
- GO2-89-106, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-40.No Tech Spec Change to Section 4.7.2.d Will Be Submitted as Part of Corrective Action to Be Taken + (10:56:42, 8 January 2025)