ML17285A620

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1989 for WPPSS-2.W/890710 Ltr
ML17285A620
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8907190022
Download: ML17285A620 (6)


Text

ACCELERATED DlgPBUTION DUOMO'NSTRKHON SYSTEM REGULATORY INFORMATION DISTRXBUTXON SYSTEM (RIDS)

4WtSFSO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power, Supply System, RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1989 for WNP-2.W 90710 r; DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 'NCL SIZE TITLE: Monthly Operating Report (per Tech Specs) 1 t NOTES:

RECXPIENT ID PD5 LA CODE/NAME SAMWORTH,R COPIES LTTR ENCL 3 '

1 1'ECXPIENT 1

ID PD5 PD 'OPIES CODE/NAME LTTR ENCL 1 1 h

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2, NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DR~E PB 1 0 1 1 NUDOCS-ABSTRACT 1 1

~ILE '1 1 RGN5 I

1 1 EXTERNAL: EG&G SIMPSON, F 1 1 LPDR 1 1 NRC PDR 1 NSIC 1 1.

L~ II'75048( /

j D

S D

D NOZE K) ALL %IESit RECIEKEPXS S

PIEASE HELP US Kl REEKS %LSTE! CXRZLCZ 'XHE DOCUMENT KRZRDL DESK, ZiZSTB MR DOCUMENTS KXJ DGN~T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 988 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 July 10, 1989 U.S.'uclear, Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT II Transmitted herewith is the Monthly Operating Report for, June 1989 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C. . Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,. J. B. Martin NRC Region V Mr,. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI; Farmington CT Mri. J. T. Wheelock INPO Mr.. W. H. Lovelace NRC, Washington D.C.

8907190022 S90630 PDR, ADOCK 0 000397 PDC R

DOCKET NO. 50-397 01IT NN1L W P-MTE 7 5/89 LAIT SIUTOONNS / AEDUCTIONS COhlPLETEO OY LB HUTCHI ON:

REPENT PERICO JUNE 19~9 TELEPllONE 6

mcnth, year Fm. ~in 7Fii 700.>i<~ HEIGH hht1iO iZCTD<<: i ~. I iiiii OBftLC C IOt RlE E 0 C lN N.

89-06 4/28/89 S 663.6 C 4 RC FUELXX REFUELING OUTAGE CONCLUDED 89-07 6/29/89 S 33.52 B HA MECFUN GENERATOR WAS REMOVED FROM GRID TO PERFORM OVERSPEED TESTS ON TURBINE. A REACTOR SCRAM OCCURED PRIOR TO COMPLETION OF TESTS 9"08 6/30/89 S 4.2 B HA MECFUN GENERATOR WAS REMOVED FROM GRID TO COMPLETE OVERSPEED TESTING OF TURBINE AND PERFORM SCRAM TIME TESTING WNP-2 COMPLETED SCHEDULED REFUELING OUTAGE AND RETURNED TO POWER SNtN FOR TESTING WERE INCURRED.

IN JUNE. SUBSEQUENTLY 2 SCHEDULED OUTAGES TYPE AEASOM MFTlf00 SYSTEM k COMPOhCNT

-Forced Scl led A-Equip Failure 0-Maint or Test ~

-.. F-lldmin

'-Oper Error 1-Manual 2-Manual ScratA Exhibit F h H Instructions for C-Aofue Ting if-Other >-pluto Scram Prepara tion'f'ata 0-Regulatory Restriction 4-Continued Entry Sheet I E-Operator Training 6-f7educed Load Licensee E'vent Report 4 4 h License Examination 9-OI:her (LEA) File (NUBEG-0161) 4

'VERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP" 2 DATE 7/5/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 MONTH JUNE 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 17.

2. 18.
3. 19.
4. 20.
5. 21.
6. 22.
7. 23.
8. 24.

25.

10. 26.

27.

12. 28. 50
13. 29.
14. 30. 61
15. 31.

16.

INSTRUCT IONS On this form, li'st the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the average daily unit'power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01- Jul -89 DOCKET: 50-397 REPORTING PERIODs OUTAGE + ON-LINE -HOURS 720 UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 LICENSED THERMAL POWER (MWt) s 3323 l~ NAMEPLATE RATING (GROSS MWe) s 1200 9 l~ DESIGN ELECTRICAL RATING (NET MWe) s 1100 MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) s 1140 MAXIMUM DEPENDABLE CAPACITY (NET MWe) s 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE REASONSs NONE

0. POWER TO WHICH RESTRICTED~ IF ANY (NET MWe) s 1 REASONS FOR RESTRICTIONS~ IF ANYs NONE MONTH YEAR CUMULATIVE 720 4343 39847.2 94 5 2798 3 29015 9 0.0 0 0 340.4 18 7 2681.9'7846.5 0 0 0 0 381 7 28470 7149562 76260767 3390 2350670 25384170

-4264 2245452 24413760 2 6X '

61 8X "'69 9X 2 6X,." .'" 61 ~ 8% ...70 8%

~ 5X 47 2X '56'OX

-0 5X;-',. "47 0

00 OX " '.

836 OX

~"'3 OX 9 55e7%

'27752

'iX

,'6 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEqDATE~DURATION)s g@E

'7 IF CURRENTLY SHUTDOWN ESTIMATED 8TARTUP DATEs

gV HI