ML17285A620

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1989 for WPPSS-2
ML17285A620
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8907190022
Download: ML17285A620 (6)


Text

ACCELERATED DlgPBUTION DUOMO'NSTRKHON SYSTEM REGULATORY INFORMATION DISTRXBUTXON SYSTEM (RIDS)

4WtSFSO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power, Supply System, RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1989 for WNP-2.W DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR

'NCL TITLE: Monthly Operating Report (per Tech Specs) 1 t

NOTES:

90710 r;

SIZE RECXPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/DR~E PB 1 0

~ILE EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

1 1

10 10 1

1 1

1 1

1

'1 1

1 1

1 1'ECXPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 I

LPDR NSIC

'OPIES LTTR ENCL 1

1 1

1 2

2, 1

1 1

1 1

1 1

1 1

1.

h L~ II'75048(

/

j D

S NOZE K) ALL %IESit RECIEKEPXS PIEASE HELP US Kl REEKS %LSTE!

CXRZLCZ 'XHE DOCUMENT KRZRDL DESK, ZiZSTB MR DOCUMENTS KXJ DGN~T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 29 D

D S

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 988

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 July 10, 1989 U.S.'uclear, Regulatory Commission Document Control Desk Washington, D.C.

20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT II Transmitted herewith is the Monthly Operating Report for, June 1989 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C.

. Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc:

Mr,.

Mr,.

Ms.

Mri.

Mr..

J.

B. Martin C. J.

Bosted Dottie Sherman J. T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI; Farmington CT INPO NRC, Washington D.C.

8907190022 S90630 PDR, ADOCK 0 000397 R

PDC

REPENT PERICO JUNE 19~9

mcnth, year LAIT SIUTOONNS / AEDUCTIONS DOCKET NO.

50-397 01IT NN1L W P-MTE 7 5/89 COhlPLETEO OY LB HUTCHI ON:

TELEPllONE 6

Fm.

~in 7Fii 700.>i<~

HEIGH hht1iO iZCTD<<:i

~. I iiiii OBftLC C IOt RlE E

0 C lN N.

89-06 4/28/89 S

663.6 C

4 RC FUELXX REFUELING OUTAGE CONCLUDED 89-07 6/29/89 S

33.52 B

HA MECFUN GENERATOR WAS REMOVED FROM GRID TO PERFORM OVERSPEED TESTS ON TURBINE.

A REACTOR SCRAM OCCURED PRIOR TO COMPLETION OF TESTS 9"08 6/30/89 S

4.2 B

HA MECFUN GENERATOR WAS REMOVED FROM GRID TO COMPLETE OVERSPEED TESTING OF TURBINE AND PERFORM SCRAM TIME TESTING SNtN WNP-2 COMPLETED SCHEDULED REFUELING OUTAGE AND RETURNED TO POWER IN JUNE.

SUBSEQUENTLY 2 SCHEDULED OUTAGES FOR TESTING WERE INCURRED.

TYPE

-Forced Scl led I

4 4

4 AEASOM A-Equip Failure F-lldmin 0-Maint or Test

~

'-Oper Error C-Aofue Ting if-Other 0-Regulatory Restriction E-Operator Training h License Examination MFTlf00 1-Manual 2-Manual ScratA

>-pluto Scram 4-Continued 6-f7educed Load 9-OI:her SYSTEM k COMPOhCNT Exhibit F h H Instructions for Prepara tion'f'ata Entry Sheet Licensee E'vent Report (LEA) File (NUBEG-0161)

'VERAGE DAILY UNIT POWER LEVEL MONTH JUNE 1989 DOCKET NO.

50-397 UNIT WNP"2 DATE 7/5/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 2.

3.

4.

5.

6.

7.

8.

10.

12.

13.

14.

15.

16.

DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 50 61 INSTRUCT IONS On this form, li'st the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).

In such

cases, the average daily unit'power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01-Jul -89 DOCKET: 50-397 REPORTING PERIODs UTILITY CONTACT:

OUTAGE + ON-LINE -HOURS LEONARD HUTCHISON (509) 377-2486 720 l ~

l ~

LICENSED THERMAL POWER (MWt) s NAMEPLATE RATING (GROSS MWe) s DESIGN ELECTRICAL RATING (NET MWe) s MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) s MAXIMUM DEPENDABLE CAPACITY (NET MWe) s IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE REASONSs NONE 3323 1200 9 1100 1140 1095 0.

POWER TO WHICH RESTRICTED~ IF ANY (NET MWe) s 1

REASONS FOR RESTRICTIONS~ IF ANYs NONE MONTH YEAR CUMULATIVE 720 4343 39847.2 94 5 2798 3 29015 9

0.0 0 0 340.4 18 7 2681.9'7846.5 0 0 0 0 381 7 28470 7149562 76260767 3390 2350670 25384170

-4264 2245452 24413760 2 6X 61 8X

"'69 9X 2 6X,.. 61 ~ 8%

...70 8%

~ 5X "

'" 47 2X

'56'OX

-0 5X;-',. "47 OX 55e7%

0 OX " '. ~"'3 OX 9 'iX 00 836

'27752

,'6 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEqDATE~DURATION)s g@E

'7 IF CURRENTLY SHUTDOWN ESTIMATED 8TARTUP DATEs

gV HI