ML17285A557

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1989 for Washington Nuclear Plant 2.W/890605 Ltr
ML17285A557
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906160126
Download: ML17285A557 (8)


Text

ACCFLKP>TED DlUBUTION DEMO%STTION SY> TZg

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) r ACCESSION NBR:8906160126

. FACIL:50-397 WPPSS DOC.DATE: M~~1 Nuclear Project, Unit 2, Washington Public NOTARIZED: NO Powe DOCKET 05000397 N

AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1989 for WNP-2. /890605 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 4 4 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 N - . RPB 10 1 1 NUDOCS-ABSTRACT 1 1 G FILE 01 1 1 RGN5 1 1 EXTERNAL: EG&G SIMPSON, F 1 1 LPDR 1 1 NRC PDR 1 1 NSZC 1 1 R

I S

l.

D NVZE 'IO ALL "RIDS" S

~Cr IHE RECIPIEPIS'LEASE HELP US K) BHXJCE WASTE DOCUMENI CGNIBOL DES Ki BXM Pl-37 (EZl'. 20079) R) ELOCUTE WAR NME FKK DISTRZBVZION LISTS PDR DOCUMENIS YOU DGH'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 5, 1989 U.S. Nuclear, Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1989 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc ,

Enclosure cc: Mr. J. B. Martin NRC Region V Mr. C. J. Bosted NRC Site Representative (901A) .

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr. W. H. Lovelace NRC, Washington D.C.

8906160126 890531 PDR ADOCK 05000397 R PDC

OPERATINS DATA REPORT WNP-2 01- Jun-89

1. DOCKET".50-397 2 REPQRTINS PERIOD:

I May-89'UTAGE, + ON-LINE HOURS UTILITY CONTACT: LEONARD HUTCHIBON (509) 377-2486

4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.

b.

9'100 DESIGN ELECTRICAL RATING (NET MWe)

7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): .1095 9~ IF CHANGES OCCUR ABOVE SINCE LAST REPORT~ GIVE REASONS:
10. POWER TO WHICH RESTRICTED'F ANY (NET MWe):

11 REASONS FOR RESTRICTIONS~ IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 3623 39127. 2
13. HOURS REACTOR CRITICAL 0.0 2703. 8 28921. 4
14. RX RESERVE SHTDWN HRS 0.0 , 0.0 340.4 15 HRB GENERATOR ON LINE O.o 2663 2 27827.8 lb. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381 7
17. GROSS THERMAL ENERGY (MWH) 0 7121092 76232297
18. GROSS ELECTRICAL ENERGY (MWH) 0 2347280 25380780
19. NET ELECTRICAL ENERGY (MWH) -5838 2249716 24418024
20. UNIT. SERVICE FACTOR 0.0% 73. 5/ 71. 1/
21. UNIT AVAILABILITYFACTOR O. 0/ 73. 5% 72. 1/
22. UNIT 'APACITY FACTOR (MDC NET) -0. 7/ 56. 7% 57 ~ 0/

23 UNIT CAPACITY FACTOR (DER NET) -O. 7/ 56.5/ 56.7/

24. UNIT FORCED OUTAGE RATE 0. 0% 3. 0% 9. 1%
25. FORCED OUTAGE HOURS O.O 83. 6 2775. 2 26 SHUTDOWNS SCHEDULED OVER .THE NEXT 6 MONTHS (TYPE,DATE~DURATION):

NONE 27 IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE>

I'

  • e) h.e)) ~ 5 ) Ie" )Wj C

j ekhe he) e/h leh,

)>>')kk h

))e

)>>', ~

I I ~ <<PeW Sr

~ h$

~ .

Ce hlhh I

" 3. ~

'"'f <<t>>'.'I) e

<<"Lzv 3) 1 6 " .v)',6 (I3hhef ',

. le) "I )) " )i ) "<<hi ~~e 3 I )3 e1 " )hT k eh@eh>>*he~e,k '

hk h gpss h

) p )il I" gi C ) h e)]l h,. L") k i, k kZ Q J I') 'C'k)i).) k>>,,'ra<') $ )C< <<fit)>1), '",<<ll

~ ) gl )'

k e" 7dl, k e ~ ) et'I .3Vl". k H e .

~h

C ~ S4)'I I'g4 <<,Ihj, )T>> )) I e h'e,'))>> i) p),, i,L I k I p 3l le e ~

.i, ")P'h'.,)",

~ ~

""'" ilp<< I~F'lI h

i >'3-k h'p h ~ . <

~

)kI pe." ~,<<h)f.

)1 (>> h ~ e)

I kk h ~

t e) e<<e'I k 'fl)(,'<<';);k'h:M) t.j)e III ~

g $

) p

~ ' . 'h: -e )h,'h "h)')" /e "h" el le e' k

'e "hh' ', )

47)-; e >, h t31 pkk$ >> p P,ekll

~ e

.e

~ k' I ' l Pe>>)l P

P

'k i) )'i f""' 'j )'

'he ge ""

~ h ee h j $

e e

ke h a

hh See,l <<<<) I 'h g

)v, pQ .-...1

, ~ Rleh,h ) )1 )>>)f e k I)h) ) ~ ) I '3)'-) ',.".)'.

~ i .">,,'IA <<'le < ~) <

'I ee oe

~ Ik sW' 3l

'I

') ) ec] e

)

~ pehk [Ih ~

<<<<h ~

)le 1

)

C'>>I p"" Ih. ek tl')" 3 i I e)ie)rt ) ~)eke)>> '3 <<~H"')

DOCKET NO. 50-397 UNIT NRhIE DRTE LNIT SIIUTDONNS / IlEDUCTIONS COhIPLETED BY LB HUTCHISON IlEPCAT PEIlIOD MAY 19 89 TELEPIIONE (509)377-2486 mcnth, year HK l>inE xieE 1eijn~ BEKsQH ~sr liV ttlllK ~r .

tR1ll'C 89-06 4/28/89 S 744 C 4 FUELXX REFUEL OUTAGE CONTINUING SUhtIRAY WNP-2 REMAINED SHUTDOWN IN NAY FOR SCHEDULED REFUELING OUTAGE.

TYPE METIIOO SYSTEhI h COMPOM:NT f4 F-Forced R-Equi.p Failure F-Rdmin 1-Manual Exhibit F h H S-ScllKI B-Maint or Test ~ 0-Oper Error 2-Manua1 Scram Instructions for C-Ile fue ling H-Other >-lluto Scram Preparation oP 0-Ilegulatory Iles triction 4-Continued Data Entry Sheet E-Operator TraIning 6 Ilnducc d Load Licensee Event Ileport h License Examination 9-Otl>er (LiER) File (NUBEG-0161)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50"397 UNIT WNP-2 DATE 6/I/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 tlONTH MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY A VERAGE DAILY POWER LE VE L (MwE-Net) (MwE-Net) 17.

2. 18.
3. 19.

20.

21.

6. 22.
7. 23.
8. 24.
9. 25.
10. 26.

27.

12. 28.
13. 29.
14. 30.
15. 31.

16.

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

P (b