ML17285A557

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1989 for Washington Nuclear Plant 2
ML17285A557
Person / Time
Site: Columbia 
Issue date: 05/31/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906160126
Download: ML17285A557 (8)


Text

ACCFLKP>TED DlUBUTION DEMO%STTION SY> TZg

~.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) r ACCESSION NBR:8906160126 DOC.DATE: M~~1 NOTARIZED:

NO

. FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET N

05000397

SUBJECT:

Monthly operating rept for May 1989 for WNP-2. /890605 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 N

RPB 10 G FILE 01 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 4

4 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSZC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 R

I S

l.

NVZE 'IO ALL "RIDS" RECIPIEPIS'LEASE HELP US K) BHXJCE WASTE ~Cr IHE DOCUMENI CGNIBOL DESKi BXM Pl-37 (EZl'. 20079) R) ELOCUTE WAR NME FKK DISTRZBVZION LISTS PDR DOCUMENIS YOU DGH'T NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 30 ENCL 30 D

S

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 June 5, 1989 U.S.

Nuclear, Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1989 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C.

M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.

Mr.

Ms.

Mr.

Mr.

J.

B. Martin C. J.

Bosted Dottie Sherman J.

T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI, Farmington CT INPO NRC, Washington D.C.

8906160126 890531 PDR ADOCK 05000397 R

PDC

OPERATINS DATA REPORT WNP-2 01-Jun-89 1.

DOCKET".50-397 2

REPQRTINS PERIOD:

I UTILITY CONTACT:

May-89'UTAGE, + ON-LINE HOURS LEONARD HUTCHIBON (509) 377-2486 4.

LICENSED THERMAL POWER (MWt):

5.

NAMEPLATE RATING (GROSS MWe):

b.

DESIGN ELECTRICAL RATING (NET MWe) 7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

3323 1200.

9'100 1140

.1095 9 ~

IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONS:

10.

POWER TO WHICH RESTRICTED'F ANY (NET MWe):

11 REASONS FOR RESTRICTIONS~ IF ANY:

12.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE SHTDWN HRS 15 HRB GENERATOR ON LINE lb. UNIT RESERVE SHUTDOWN HOURS 17.

GROSS THERMAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY (MWH) 19.

NET ELECTRICAL ENERGY (MWH) 20.

UNIT. SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT 'APACITY FACTOR (MDC NET) 23 UNIT CAPACITY FACTOR (DER NET) 24.

UNIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS MONTH 744 0.0 0.0 O.o 0.0 0

0

-5838 0.0%

O. 0/

-0. 7/

-O. 7/

0. 0%

O.O YEAR CUMULATIVE 3623 39127. 2 2703. 8 28921. 4

, 0.0 340.4 2663 2 27827.8 0.0 381 7 7121092 76232297 2347280 25380780 2249716 24418024

73. 5/
71. 1/
73. 5%
72. 1/
56. 7%

57 ~ 0/

56.5/

56.7/

3. 0%
9. 1%
83. 6 2775. 2 26 SHUTDOWNS SCHEDULED OVER.THE NEXT 6 MONTHS (TYPE,DATE~DURATION):

NONE 27 IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE>

e) h.e)) ~ 5 I'

)

Ie" * )Wj C

j ekh he) e/h leh, h

)>>',

~

I

~ <<Pe

~ h$

e

)>>')kk ))e I

W Sr Ce

~.

hlhh I e

" 3.

~ '" <<t>>'.'I)

<<"Lzv

3) 'f 1 6

.v)',6 (I3hhef le)

"I ))

)i

) "<<hi ~~e 3

I )3 e1

)hT k eh@eh>>*he~e,k hk h gpss h

)

p

)il I" gi C

)

h e)]l h,. L") k i, k kZ Q

J I') 'C'k)i).)

k>>,,'ra<') $)C< <<fit)>1), '",<<ll

~ )

gl

)'

k e" 7dl, k

e ~

) et'I

.3Vl". k H

e.

~ h C ~S4)'I I'g4 <<,Ihj, )T>>

))

I e h'e,'))>>

i) p),,

i,L I

k I

p 3l le e

~

.i,

")P'h'.,)",

~

~

""'" ilp<<

I~F'lI h

I)1 47)-;

e >,

e ee h

~

)kI

(>>t e) e<<e'I

'e h "hh,

~

h ee ke h

hh e

a oe

~ I k

<<<<h

'I sW' h'p pe."

k 'fl)(,'<<';);k'h:M)t.j)e

~

'h:

-e

)h,'h "h"

el l e e' "h)')"k t31 Pe>>)l P

P See,l <<<<)

I 'h g

, ~ Rleh,h

) )1

)>>)f e k I)h)

)

'I 3l ')

)

~ )le 1

)

i

~

. >'3-k

~,<<h)f.

h

~ e) kk h ~

III

~ g

)

p

/e

~

ll e

)

I l

pkk$

p P,ek

.e

~k'

'k i) )'i f""'

'j

)'

'he h ge j

)v, pQ

.-...1

~

) I '3)'-) ',.".)'.

~

i.">,,'IA <<'le

~)

ec]

e )

~ pehk

[Ih~

C'>>I p"" Ih.

ek tl')"3 i

I e)ie)rt

) ~)eke)>>

'3

<<~H"')

IlEPCAT PEIlIOD MAY 19 89

mcnth, year LNIT SIIUTDONNS / IlEDUCTIONS DOCKET NO.

50-397 UNIT NRhIE DRTE COhIPLETED BY LB HUTCHISON TELEPIIONE (509)377-2486 HK l>inE xieE 1eijn~

BEKsQH

~sr liV 89-06 4/28/89 S

744 C

4 ttlllK

~r tR1ll'C FUELXX REFUEL OUTAGE CONTINUING SUhtIRAY WNP-2 REMAINED SHUTDOWN IN NAY FOR SCHEDULED REFUELING OUTAGE.

TYPE F-Forced S-ScllKI R-Equi.p Failure B-Maint or Test

~

C-Ilefue ling 0-Ilegulatory Iles triction E-Operator TraIning h License Examination F-Rdmin 0-Oper Error H-Other METIIOO 1-Manual 2-Manua1 Scram

>-lluto Scram 4-Continued 6 Ilnducc d Load 9-Otl>er SYSTEhI h COMPOM:NT f4 Exhibit F h H Instructions for Preparation oP Data Entry Sheet Licensee Event Ileport (LiER) File (NUBEG-0161)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50"397 UNIT WNP-2 tlONTH MAY 1989 DATE 6/I/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 2.

3.

6.

7.

8.

9.

10.

12.

13.

14.

15.

16.

DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

DAY AVERAGE DAILY POWER LE VEL (MwE-Net)

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line).

In such

cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

P (b