Text
RECIPIENT
ID CODE/NAME
PD5
COPXES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1.
1
1 .'1
1
1
1
1
1
1
h
2,
2
1
'
1
.
1
1
1
1
1
2
'
1
1
1
1
1
1
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR'1
NRR/DREP/RPB
10
~
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
0
HEBE
,J
G
02
RGN5.
FILE
01
F
I
I~
~
~
~
~
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RXDS)
ESSION NBR:8907140057
'OC ~ DATE: 89/06/28
NOTARIZED: NO
.
DOCKET
FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
ZIMMERMAN,R.P..
- Region .5, Ofc of,the Director
RECIP
NAME
. ,.
RECIPZENT AFFILIATION
.
'.
..;,', t;;;'", ATj~,,;i.
R
SORENSEN,G.C..
Washington Public .Power', Supply System
SUBJECT:
Forwards Insp Rept 50-397/89-13
on 890417-0603
6 notice of,
I
violation.
9
I
DISTRIBUTION CODS:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
8
r f'
~ l
!
~ I
NOTES'
-'
'-.'- "
I
I
COPIES
RECIPIENT
LTTR ENCL
ID CODE/NAME
1
1
SAMWORTH,R
D
ERNAL
LPDR
1
1
1
1
NRC PDR
1
1
PQ"ASE HEX'S To REIXKS KLPHi~f
CONTACT~ DXXlMEÃZCGHQRL DESK,
IZSTS XQR DOCUMENTS YOU DON'T NEED!
TAL NUMBER OF COPXES
REQUIRED:
LTTR
25
ENCL
25
D
S
JUN 28
tcgg
Docket No. 50-397
I
Washington Public
Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr. G. C. Sorensen
Manager,
Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
C. J.
Bosted
and
R.
C.
Sorensen
of this office on April 17 - June 3,
1989 of activities authorized
by
NRC Operating
License
No. NPF-21,
and to the discussion of findings held
by the inspectors
with Mr. C.
Powers
and other members of the Supply System's
staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspec-
tion repor t.
Within these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with
personnel
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with NRC requirements,
as
set forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10 CFR 2.201
as stated
in Appendix A, Notice of Violation.
Paragraph
14 of the enclosed
inspection report addresses
the numerous
shut-
down cooling isolations
experienced
at your facility during the current
refueling outage.
Three other engineered
safety features
actuations
(including two additional
shutdown cooling isolations)
which occurred
on
June
17 and
18 will also
be discussed
in future correspondence.
You are
encouraged
to carefully evaluate
the individual and collective significance
of these events.
As recently communicated
to Mr. A. L. Oxsen of the Supply
System staff,
we anticipate discussing this issue with you further following
the June
28,
1989 enforcement
conference.
In accordance
with 10 CFR 2.790(a),
a copy of this letter, the enclosure,
and
your response will be placed in the
NRC Public Document
Room.
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
8907i40057
890628
ADOCK 0 000397
lED!
JUN 2 8
$989
2
Should you have questions
concerning this inspection,
we will be pleased
to
discuss
them with you.
Sincer ely,
Oui naiS.ij ned-
R.
P.
Zimmerman, Acting Director
Division of Reactor Safety
and Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection
Report No. 50-397/89-13
cc:
A. L. Oxsen, Assistant
Managing Director for Operations
G.
D. Bouchey,
WPPSS Director, Assurance
8 Licensing
C.
M. Powers,
WNP-2 Plant Manager
A. G. Hosier,
WNP-2 Licensing Manager
G. E. Doupe,
Esq.
N. S. Reynolds,
Debevois,
Cook, Purcell
8 Reynolds
State of Washington
bcc w/copy of, enclosures
1 and 2:
Docket File
Project Inspector
Resident Inspector
G.
Cook
B. Faulkenberry
J. Hartin
A. Johnson
R. Nease,
bcc w/enclosure
1 only:
M. Smith
LFMB
RE
CS r n en
d
6fPf/8
6/3 /89
I
P
6/Z
s
n
9
Johnson
6/
89
MHendonca
6/+/89
QUEST
COPY
REQUEST
C
PY
ES1 /
NO
ES) /
NO
REQUEST
C
PY
ES /
NO
REQUES
C
PY
YES }/
NO
VEST
PY
ES /
NO
6/ZS/89
S
Y
/
NO
YS /
NO