ML17285A585
| ML17285A585 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/02/1989 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17285A586 | List: |
| References | |
| NUDOCS 8906300208 | |
| Download: ML17285A585 (4) | |
See also: IR 05000397/1989014
Text
gC CEMMTED
REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS).
CESSION NBR:8906300208
DOC.DATE: 89/06/02
NOTARIZED: NO
DOCKET I
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe.
05000397
AUTH.NAME
AUTHOR AFFILIATION
KIRSH,D.F.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SSRENSEN,G.C.
Washington Public Power Supply System
SUBJECT:
Forwards Insp Rept 50-397/89-14
on 890509-19.No violations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TXTLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
R
I
D
8
RECIPIENT
ID CODE/NAME
PD5
INTERNAL
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
RNAL: LPDR
.NSIC
COPIES
LTTR ENCL
1
1
2
2
1
-1
1
1
1
1
1
1
2
.
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE~L~BERMAN,J
G
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
,1
1
1
1
.1
1
1
1
1
1
1
1
1
1
1
'
1
'1"
1
1
1
1.
h
R
9
8
TO ALL RIDSI +i~~ o
PIXIE HELP US To RECCE %RHR!
CGMZM.'I'IHE DOQ3K&l CON'VKL DESK,
RXM P1-37
(EZZ. 20079)
To ELIMINATEVDGR MME PKN DISTRIBOTICH
LXSTS P2t DOCUMEHXS YOU DGH'T NEEDf
TAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
~gS RECy~
Cy+
~i
nO
<I C
0
UNITED STATES
NUCLEAR REGULATORY CONIMISSION
REGION V
"
1460 MARIALANE, SUITE 210
WALNUTCREEK, CALIFORNIA94696-6368
JUN -2
1989
pDR
Washington Public Power Supply System
P.
O.
Box 968
3000 George Washington
Way
Richland,
99352
Attention:
Mr. G.
C. Sorensen,
Manager
Regulatory
Programs
Gentlemen:
SUBJECT:
NRC INSPECTION OF WNP-2
This letter refers to the routine inspection
conducted
by Mr.
C. Clark of this
office on May 9-19, 1989, of activities authorized
by NRC License
No.
and to the discussion of our findings held with members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
-records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Enclosure:
Inspection Report
No. 50-397/89-14
D.
F. Kirsch, Chief
Reactor Safety Branch
CC:
Mr.
C.
M. Powers,
WNP-2 Plant Manager
Mr. A.
G. Hosier,
WNP-2 Licensing Manager
Mr.
G.
D. Bouchey, Director, Assurance
& Licensing
Mr.
G.
E.
Doupe, Esq.,
Mr. A. Lee Oxsen, Asst.
Managing Director for Operations,
MD/1023
N.
S.
Reynolds,
Esq.,
Bishop,
Cook, Purcell
& Reynolds
State of Washington
89063O '-,)()O397
pop
ADOC
'DI
Q
I
~
ED/
JU'i -2
39ss
bcc w/enclosure:
Docket File
Resident
Inspector
Project Inspector
G.
Cook
B. Faulkenberry
J. Martin
R.
Nease,
bcc w/o enclosure:
M. Smith
LFMB
REGION V
CC1 ark/joan
CARi
ards
DFK rsch
$ / k/89
~ /W/89
g /~9
EST
COPY
3
R
COPY ] REQUEST
YES /
NO
YE
/
NO
YES /
NO
SEND
TO
]
E
/
NO