ML17285A572
| ML17285A572 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/06/1989 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17285A569 | List: |
| References | |
| NUDOCS 8906260289 | |
| Download: ML17285A572 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON PUBLIC POWER. SUPPLY SYSTEM DOCKET NO. 50-397 NOTICE OF ISSUANCE-OF AMENDMENT TO FACILITY OPERATING LICENSE 7590-01 The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No.68 to Facility Operating License No. NPF-21, issued to Washington Public Power Supply System (the licensee),
which revised the Technical Specifications I
for operation of the Nuclear Project No. 2, located in Benton County, Washington.
The amendment was effective as of the date of issuance.
The amendmelit revises Technical Specification Section 4.8.2.1, "D.C.
Sources Surveillance Requir ements."
Specifically, the discharge amperage profiles listed under subsection d, are changed and subsections e and f are revised to reflect the more conservative aging factor used for sizing the division 1 250 vdc battery.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.
The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter 1, which are set forth in the license amendment.
Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on May 18, 1988 (53 FR 17810).
No request for a hearing or petition for leave to intervene was filed following this notice.
8906260289 890606 PDR ADOCK 05000397 P
k i
The Commission has prepared an Environmental Assessment related to the action and has determined that an environmental impact statement will not be prepared and,that issuance of this amendment will have no significant adverse effect on the quality of the human environment.
For further details with respect to the action see (I) the application for amendment dated March 18,
- 1988, as supplemented April 12, 1989, (2)
Amendment No.68 to License No. NPF-21, (3) the Commission's related Safety Evaluation and (4) the'ommi'ssion's Environmental Assessment.
All of these items are available for public inspection at the Commission's Public Document
- Room, 2120 L Street NW., Washington, DC 20555, and at the Richland City Library, Swift and Northgate Streets, Richland, Washington 99352.
A copy I
of items (2), (3) and (4) may be obtained upon request addressed to the U.S.
Nuclear Regulatory Commission, Washington, DC 20555, Attention:
- Director, Division of Reactor Projects III, IV, V and Special Projects.
Dated at Rockville, Maryland this 6th day of June, 1989.
FOR THE NUCLEAR REGULATORY COMMISSION
\\
Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
t V