Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285A849 + (10:52:06, 8 January 2025)
- GO2-89-206, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-28.Corrective Actions:Current Commercial Grade Procurement Practices Upgraded to Meet NCIG-07 Stds Ahead of 900101 Target Schedule + (10:52:07, 8 January 2025)
- ML17285A848 + (10:52:07, 8 January 2025)
- GO2-89-205, Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Safety Sys Functional Insp Including Elements of Action IV Will Not Be Completed Until Dec 1990 + (10:52:09, 8 January 2025)
- GO2-89-132, Forwards Scenario Packet for 1989 Exercise for Review & Approval.Hardware & Software Mod Necessary for Appropriate Level of Effectiveness.W/O Encl + (10:52:10, 8 January 2025)
- ML17285A844 + (10:52:12, 8 January 2025)
- GO2-89-203, Responds to Generic Ltr 88-20,Suppl 1 Re Individual Plant Exam.Pra Will Be Completed to Level II as Described in NUREG/CR-2300 & Focused or Modified Only to Extent That NRC Concerns Addressed + (10:52:13, 8 January 2025)
- GO2-89-202, Responds to NRC 890821 & 0728 Ltrs Re Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-13.Completion Dates Revised.Review of Work Practices Will Be Done by 900201 & single-train Sys Lesson Plans to Be Complete by 891130 + (10:52:14, 8 January 2025)
- ML17285A841 + (10:52:16, 8 January 2025)
- ML17285A840 + (10:52:17, 8 January 2025)
- ML17285A839 + (10:52:18, 8 January 2025)
- IR 05000266/2017502 + (10:52:19, 8 January 2025)
- ML17285A837 + (10:52:20, 8 January 2025)
- ML17285A835 + (10:52:21, 8 January 2025)
- TAC:73957 + (10:52:22, 8 January 2025)
- ML17285A832 + (10:52:22, 8 January 2025)
- GO2-89-201, Application for Amend to License NPF-21,revising Tech Spec 3.4.6.1 & Supporting Bases Resulting from Implementation of Reg Guide 1.99,per Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matls.. + (10:52:23, 8 January 2025)
- ML17285A831 + (10:52:23, 8 January 2025)
- GO2-89-200, Application for Amend to License NPF-21,revising Tech Spec 4.0.2 to Remove 3.25 Time Interval Limit for Surveillance to Enhance Plant Safety & Decrease Administrative Burden,Per Generic Ltr 89-14 + (10:52:25, 8 January 2025)
- ML17285A828 + (10:52:25, 8 January 2025)
- GO2-89-204, Forwards Response to NRC Re Violation Noted in Insp Rept 50-397/89-23 & Assessment of Issues.Corrective Actions:Violation Discussed Extensively During Shop Meetings & Shop Mgt Structure Reorganized + (10:52:27, 8 January 2025)
- GO2-89-188, Responds to NRC Issuance of Amend 74 to License NPF-21 Re Isolation Provided Remote Intakes of Control Room HVAC Sys. Procedure Deviations Reviewed & Approved by Plant Operations Committee on 891006 Prior to Implementation of Amend + (10:52:28, 8 January 2025)
- GO2-89-183, Forwards Status Rept on SALP Board Recommendations Covering Period June 1988 - May 1989.Effectiveness Review Established to Provide Independent Assessment of Effectiveness of Util Corrective Actions + (10:52:30, 8 January 2025)
- GO2-89-199, Provides Addl Info Re Clarifications Provided in NRC Positions 4 & 5 of Suppl 1 of Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Nontraceable Circuit Breakers Reevaluated for nonsafety-related Use + (10:52:31, 8 January 2025)
- IR 05000397/1989028 + (10:52:38, 8 January 2025)
- ML17285A816 + (10:52:39, 8 January 2025)
- IR 05000397/1989029 + (10:52:41, 8 January 2025)
- ML17285A813 + (10:52:42, 8 January 2025)
- GO2-89-182, Forwards Amend 40 to FSAR for Washington Nuclear Plant 2. Util Did Not Have Time to Revise Plant Controlled Drawings 7.3-18e Through 7.3-18j + (10:52:43, 8 January 2025)
- ML17285A810 + (10:52:43, 8 January 2025)
- GO2-89-185, Responds to Request for Info on Environ Qualification of Taped Electrical Splices.Scotch Tapes Allowed by Electrical Test Guide Included Scotch 33,23 & 70 + (10:52:45, 8 January 2025)
- IR 05000397/1989026 + (10:52:50, 8 January 2025)
- ML17285A803 + (10:52:52, 8 January 2025)
- ML17285A800 + (10:52:52, 8 January 2025)
- IR 05000397/1989023 + (10:53:21, 8 January 2025)
- ML17285A797 + (10:53:22, 8 January 2025)
- ML17285A795 + (10:53:23, 8 January 2025)
- ML17285A794 + (10:53:25, 8 January 2025)
- 05000397/LER-1989-039, :on 890914,discovered Three Discrepancies W/ Current Configuration of Reactor Bldg Exhaust Air Radiation Monitoring Sys That Do Not Satisfy Design Basis Requirements + (10:53:28, 8 January 2025)
- ML17285A789 + (10:53:29, 8 January 2025)
- ML17285A788 + (10:53:29, 8 January 2025)
- ML17285A787 + (10:53:30, 8 January 2025)
- TAC:60955 + (10:53:31, 8 January 2025)
- ML17285A785 + (10:53:31, 8 January 2025)
- GO2-89-180, Certifies That Initial & Requalification Operator Training Program for Accredited & Based on Sys Approach to Training, Per Generic Ltr 87-07 + (10:53:32, 8 January 2025)
- ML17285A783 + (10:53:36, 8 January 2025)
- ML17285A780 + (10:53:37, 8 January 2025)
- ML17285A782 + (10:53:37, 8 January 2025)
- ML17285A777 + (10:53:38, 8 January 2025)
- 05000397/LER-1989-036, :on 890905,discovered That Present Surveillance Procedures Do Not Provide for Independent Measurement of Two Values.Caused by Less than Adequate Surveillance Procedures on Response Time Testing of APRM Sys + (10:53:43, 8 January 2025)
- GO2-89-178, Forwards Page 2 to Inservice Insp Summary Rept Sent on 890928.During Duplication of Subj Document,Back Side of Form NIS-1 Not Copied + (10:53:43, 8 January 2025)