October 5, 1989 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regu latory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way
- Richland, Washington 99352 DISTRI BUTIO NRC 5 LPDRs PD5 Reading MVirgilio JLee RSamworth OGC D. Hagan E. Jordan T. Meek (4)
Wanda Jones J. Calvo ACRS (10)
GPA/PA OC/LFMB Region V (4)
Dear Mr. Sorensen:
SUBJECT:
STANDBY DIESEL GENERATOR AUTOMATIC RETURN TO STANDBY MODE (TAC NO. 60955)
By letter dated December 2, 1983 (G02-83-1111)
Washington Public Power Supply System notified NRC that the WNP-2 Diesel Generator design feature for automatic speed control characteristic switching did not work correctly.
In that letter you committed to either implement a design change to the diesel generators for automatic control characteristic selection or to provide a justification for not implementing a design modification.
By letter dated March 10, 1986 (G02-86-201) you provided the alternative justification and demonstrated that the system conforms to all Regulatory requirements.
The staff reviewed your March 10, 1986 letter and found your technical justification acceptable.
We therefore consider this issue closed.
A copy of the safety evaluation documenting the review is enclosed.
Sincerely, original signed by
Enclosures:
1.
Safety Evaluation Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
w/enclosures See next page
/PD5 DRSP/PD5 DRSP J
RSamwor th: dr GW 10/
/89 10/K /89 10/
/89 OFFI IAL RECORD COPY r 8910180359 891005 PDR ADOCK 05000397 P
PNU
'I H I t
C n
I If
~P,R REMI
+4 PO Cy Vl I.
o
~+*<<+
Docket No. 50-397 e
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 5, 1989 Hr. G. C. Sorensen, Manager Regulatory Progr ams Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Hr. Sorensen:
SUBJECT:
STANDBY DIESEL GENERATOR AUTOMATIC RETURN TO STANDBY NODE (TAC NO. 60955)
By letter dated December 2, 1983 (G02-83-1111)
Washington Public Power Supply System notified NRC that the WNP-2 Diesel Generator design feature for automatic speed control characteristic switching did not work correctly.
In that letter you committed to either implement a design change to the diesel generators for automatic control characteristic selection or to provide a justification for not implementing a design modification.
By letter dated March 10, 1986 (G02-86-201) you provided the alternative justification and demonstrated that the system conforms to all Regulatory requirements.
The staff reviewed your March 10, 1986 letter and found your technical justification acceptable.
We therefore consider this issue closed.
A copy of the safety evaluation documenting the review is enclosed.
S incere ly,
Enclosures:
1.
Safety Evaluation cc:
w/enclosures See next page Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Mr. G.
C. Sorensen WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Mr. C. M. Powers WNP-2 Plant Manager Washington Public Power Supply System P.O.
Box 968, MD 927M Richland, Washington 99352 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280
- Richland, Washington 99352 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.
Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell E Reynolds 1400 L Street NW Washington, D.C.
20005-3502 (10)